  • Min Cost $1,286.00 Avg Cost $5,170.00 Max Cost $9,055.00

How much does it cost to install a septic system in North Carolina?

: Generally it costs between $6,500 and $8,000.

Can a homeowner install a septic system in NC?

ANSWER: A homeowner may install the system for a property that will used as his or her primary residence as long as the system is gravity fed, pipe and gravel system and is limited to two systems within a five year period. ANSWER: Single septic tank, Conventional (Gravel) Gravity System.

How close can you build to a septic tank in NC?

Maintain 15 feet between septic tanks and basements, embankments, drainage system side-slopes, and swimming pools. Septic tanks also must be at least 10 feet away from property lines, water lines, and the up-slope portion of drainage systems.

Can you pump a septic tank in winter?

Winter is really the only season we don’t recommend pumping septic systems. Unfortunately, frozen ground, heavy snow, and slippery ice can make it extremely difficult for even our skilled technicians to properly dig up and securely cover the septic tank.

What is the cheapest septic system?

Conventional septic system These conventional septic systems are usually the most affordable, with an average cost of around $3,000.

How much does it cost to put in a well and septic system in NC?

On average, a well costs around $6500-$7500. This includes all costs pertaining to drilling and the installation of the pumping system. Conditioning equipment is required in some cases and typically ranges from $1500-$3000.

How big should my septic tank be?

The larger your home, the larger the septic tank you’re going to need. For instance, a house smaller than 1,500 square feet usually requires a 750 to 1,000-gallon tank. On the other hand, a bigger home of approximately 2,500 square feet will need a bigger tank, more than the 1,000-gallon range.

What is the alternative to a septic tank?

Mound systems work well as alternatives to septic tanks when the soil around your home or building is too dense or too shallow or when the water table is too high. Although they are more expensive and require more maintenance than conventional systems, mound systems are a common alternative.

Does NC require septic inspection?

Septic system installers and inspectors MUST now be certified by the North Carolina On-site Wastewater Contractors and Inspectors Certification Board (NCOWCICB) in order to install or inspect septic systems in NC. The legislation does NOT require a septic system inspection as part of a real estate transaction.

What will ruin a septic system?

Any paper products like tissues, paper towels, tampons, or sanitary products, even some heavier toilet paper, will clog your system if you flush enough of it. Wet wipes are another product that you should never flush into a septic system.

Can you build a deck over a septic tank?

You should never build a deck over a septic field; doing so will prevent the natural draining and dissipation of the effluent. This can ruin the septic system, not to mention releasing foul smells into the air all around your deck. The dissipating effluent can also rot the deck from underneath.

Can you put antifreeze in septic tank?

Do not add antifreeze, salt, or a septic system additive into the system. Do not pump sewage onto the ground surface. Do not start a fire over the system to attempt to thaw it out. Do not run water continually to try to unfreeze system.

What is the best time of year to pump your septic tank?

The best times to pump your septic tank are spring and summer. A tank that is near capacity should be pumped during the spring to avoid flooding from heavy spring rain showers. It’s a good idea to pump your tank in the warmer months in preparation for high usage and to make maintenance easier for your technician.

Do septic tank blankets work?

When to Use Frost Blankets Your septic tank will be sufficiently insulated. An added feature of frost blankets is that they are waterproof and snowproof. They can hold snow, which will create an added layer of insulation over the tank. No matter what conditions are above ground, your septic tank is covered!

Environmental Health – Pamlico County, North Carolina

It is the responsibility of the Environmental Health Division to inspect on-site septic systems, food and lodging establishments, swimming pools, and private wells, as well as to provide mosquito control services. Rabies clinics are also sponsored by us twice a year, in the spring and the fall. Please see the links below for a copy of our Environmental Health Fee Schedule, On-Site Wastewater Application, a list of our Septic System Installers, Authorization to Construct Septic System Form, and Food and Lodging Rules (DEHNR Website), or call our office for more information.

  • Application for a new well, well repair, or well abandonment
  • Application for a water sample analysis
  • Application for a Food Service Plan Review
  • Certified Well Drillers
  • Application for a Water Sample Analysis
  • Fee Schedule for Environmental Health Services
  • Keeping Sewage Systems in Good Condition Application for a Temporary Food Establishment, Application for a Limited Food Service Establishment, Voluntary Relinquishment of Administrative Appeal Rights, Application for a Child Care Center Plan Review, and Affidavit are all available on the DEHNR website.

Permission for Improvements:

  • Improvement Permit Application
  • Site Plan Worksheet
  • Site Inspection Report

Getting Permission for Construction:

  • Site Plan Worksheet
  • Construction Authorization Application
  • Construction Authorization Form

Existing System Verification:

  • Site Plan Worksheet
  • Existing System Check Application
  • Existing System Check Report

Repairing a septic system:

  • The Repair of Septic Tanks

Septic Planner

It is also available in Spanish. This website is controlled through the use of the English language. When there is a discrepancy between the English translation and the Spanish translation, the English translation takes precedence. When you click on the translation link, a free translation service is activated, which will allow you to transform the page from English to Spanish. As with any Internet translation, the translation is not sensitive to the context and it is possible that the text will not be translated in its original meaning.

  • For your convenience, please keep in mind that when certain applications and/or services are translated, they may not function as expected.
  • When there is a contradiction between the English text and the translation, the English text takes precedence over the translation.
  • The page is converted to Spanish once you click on the link.
  • NC State Extension makes no representations as to the correctness of the translated material.
  • Collapse Walter Cole is the director of the Pamlico County Health Department.
  • Together, the Pamlico County Health Department and LandPlot Research Inc.
  • The suggestions of numerous additional North Carolina counties as well as septic system installers were also requested and incorporated into the final report.
  • Other versions of SepticPlanner are currently being developed for use in jurisdictions with a variety of different criteria than the current version.

The first step in using SepticPlanner to produce an Improvement Permit is to enter the administrative information pertaining to the application into the relevant boxes on the PC screen, such as the property identification number, the owner’s name, the owner’s address, the PIN number, and so on.

Conventional perforated pipe systems, Low pressure pipe systems, polystyrene aggregate systems, chambered system and bed system are among the types of drainfields that the current version of SepticPlanner can accept.

As soon as all of the information required to design the system is entered, SepticPlanner goes to work performing the calculations necessary to determine the drainfield dimensions, determine the pump requirements for pumped systems, determine the size and separation of holes for low pressure pipe systems, and so on.

  1. At this point, the user has the option of accepting or rejecting the recommended design proposal.
  2. Figures 1, 2, 3, 4, and 5 illustrate examples of some of the exhibits and attachments that were submitted.
  3. Following approval of the design, a file comprising an illustration of the drainfield as well as a summary of administrative and engineering data is prepared for future reference.
  4. that works in conjunction with this file.
  5. It is particularly well suited for the development of precise scale drawings of the septic field installation site, which is a need of the project.
  6. Topographic data may be included in some circumstances, which QuikPlat is capable of receiving and presenting.

Because QuikPlat provides several different entry methods for property boundary geometry, it is possible to input the geometry in a variety of ways. The following are some of the more useful techniques:

  • It is possible to insert calls directly into QuikPlat that are derived from the metes and bounds descriptions included in the deed of the land. In QuikPlat, you may read the boundary element bearings and lengths from a subdivision plat and insert them manually
  • However, this is not recommended. Alternatively, a scale drawing of the property may be scanned and uploaded into QuikPlat as a backdrop on which the drainfield can be placed. It is possible to extract the necessary information from a scale drawing and enter it into QuikPlat using the tablet mode if a digitizing tablet is available. It is possible to export property borders from a GIS system as a.DXF file and import them straight into QuikPlat in counties where there is a GIS data base providing the property boundaries
  • However, this is not recommended. Property boundaries may be crossed using a GPS receiver and accompanying software, after which the coordinates for the border can be exported as a.DXF file for further analysis. Afterwards, the.DXF file may be opened and imported immediately into QuikPlat.

Whatever technique is used to construct the property drawing, after the drawing of the property border and the placement obstacles is complete, the drainfield drawing, which is the drawing that was exported from SepticPlanner, may be imported into QuikPlat and used to plan the septic system. Once the drainfield appears on the site drawing, it may be readily moved and/or rotated in order to locate a place that is suitable for the drainage system. Should it not be possible to locate a suitable place, the drainfield graphic can be erased and SepticPlanner can be used to construct an other design that may be more acceptable.

  • It will show in the site drawing with a separate line style so that it can be readily distinguished from the rest of the system.
  • The QuikPlat drawing, together with the attachments, is transformed into the permit document by the insertion of the application administrative data and an authorized signature block.
  • If you have a color printer, you may distinguish between the layers by printing them in different colors on each layer.
  • The following are the most significant advantages of this innovative technology:
  • The preparation of correctly sized drawings of the septic system with measurements to ensure that it is properly placed as soon as possible
  • • Confirmation that the designs would be compliant with applicable laws and regulations
  • It is possible to automate the creation of the exhibits and attachments required to properly characterize the system. The design is archived in a compact format for future reference. By simply remembering the proper file, designs may be quickly fixed and/or updated when the need arises to make a change to the design
See also:  What Would Cuase A Shower To Smell Off A Septic Tank? (Solution found)

It is possible to receive further information about this program by contacting Walter Cole at (252) 745-5634 or Scott Cameron at (252) 249-0836. Additional information may be found on the LandPlot Research homepage, which can be found at.

Johnston County, North Carolina Environmental Health Department

State Regulations for Off-Site Wastewater Systems: Approval of Innovative Wastewater Treatment Systems Find out where your Septic Permit Application for a Septic System and Well is at any time. This application is now available as a fillable PDF on the internet. septic tank systems are underground wastewater systems that comprise of a settling tank and a drain field. On-site wastewater is defined as wastewater generated on the premises. This system’s primary function is to confine solid waste and sterilize the wastewater produced by a house, company, or other facility, among other things.

These are some examples:

  • Approval of Innovative Wastewater Systems under New State Regulations for Off-Site Systems Find out where your Septic Permit Application for a Septic System and Well is in the process. It is now possible to access this application online in the form of a fillable PDF document. Sewage generated on-site includes septic tank systems, which are underground wastewater systems comprised of two components: a holding tank and a drainage field. This system’s primary function is to confine solid waste and sterilize wastewater generated by a home, company, or other building. When it comes to permitting, inspection, and operation of these systems, Environmental Health has a number of tasks to fulfill. Examples of such items are:

The Septic System Permitting Process

  1. When an Application for Service is presented with a document from the proper planning and zoning authority, the application is accepted. When applying for a septic tank permit or permits for multiple septic tanks, a site plan of the land is necessary. The site plan is a design that depicts the shape and size of the land, as well as the state road number, as well as the driveway and home (or other buildings) that are located on the premises. In order to determine the position of the structure, the site plan must include setbacks (or distances) from the highway right-of-way and at least one additional property line in addition to the right-of-way. If you require assistance, a schematic from GIS will be printed for you. Fees are evaluated and determined based on the services that are sought. See the current pricing schedule for further information. The application is allocated to an Environmental Health Specialist when the costs have been paid
  2. The Environmental Health Specialist will call the applicant to organize an appointment for the evaluation. In the event of an emergency, the applicant should call the Environmental Health Specialist immediately for assistance. They are available at the office between the hours of 8:00 a.m. and 9:30 a.m., Monday through Friday
  3. Before the Department examines the property, the applicant should rough-stake the area that needs to be examined as well as the placement of the building (house, mobile home, business, etc.). After the property has been analyzed, the Department will notify the applicant of the results. If the land is acceptable for the proposed purpose, it must be surveyed and a plat submitted for final review, together with the accompanying plat fee, before the project can be completed. It is necessary to file a permit if there is no need for a survey
  4. The permission can be released upon receipt of the relevant zoning permit and any additional payments. Once an applicant has obtained a valid zoning permission as well as an Environmental Health permit, he or she may submit an application for building permits to the Building Inspections department.

Items Needed to Process A Water and Sewer Authorization

  • Installation of a septic tank and completion of an inspection have been completed. The well has been constructed and the inspection has been finished. A well log that has been prepared by the well contractor must be kept on file in the office. a negative bacteriological water test is necessary prior to approval of the well
  • The well log is located in the left-bottom corner on the well permit
  • Providing an electricity supply and arranging a water test are both the applicant’s duty in order for the water sample to be collected. The test can be performed either by the Environmental Health Specialist who has been assigned to you or by a private laboratory. If the test is conducted by an Environmental Health Specialist, the findings will be available in about one week after the test is completed. The sample must be collected by a trained lab technician who works for the private facility where the test is being performed if you hire one. It is just for informational purposes that we are collecting the nitrate, nitrite, and inorganic water samples
  • Nonetheless, they are needed by the State of North Carolina.

Following the completion of all requirements, the Environmental Health Specialist will complete a water and sewer permission form. A copy of that form is sent to the Department of Building Inspections so that a final inspection may be performed and a permanent power can be granted.

Repairs

Specifically, according to 15A NCAC 18A.1938 (c), the person who owns or controls the system is responsible for assuring compliance with all applicable laws, rules, and permit conditions pertaining to the system’s location and installation as well as its operation, maintenance, monitoring, reporting, and repair. If you are experiencing problems with your septic system, please call us and we will happily analyze the situation to see whether a repair permit is required and create a solution that is acceptable for your situation.

Repair permits can be obtained at no cost by the property owner or his or her authorized representative. Please see the Why Septic Systems Faildocument for further information about failed septic systems.

Pump Inspections

Every five years, Johnston County Environmental Health is mandated by the State of North Carolina (15A NCAC 18A.1961 j) to examine all septic systems that use an effluent pump and to report the results to the public. Prior to the inspection, a letter is mailed to the homeowner, who can then contact to schedule an appointment with the inspector. Following the completion of the inspection, the inspector will complete an inspection report, which will be forwarded to the property owner. Take a look at the Pump diagram.

Important Links

  • Soil Consultants who work for themselves
  • Septic System Installers who work for themselves
  • Septage Pumper List
  • Septic System Owner’s Guide
  • Private Soil Consultants who work for themselves. Instructions on How to Dismantle a Septic System
  • Septic System Maintenance
  • Pump Diagram
  • Septic System Maintenance
  • ‘Soil Facts’: The Reasons Why Septic Systems Fail What not to flush down the toilet or put in your sink (if you have a septic tank)

Environmental Consulting Projects in Wilmington NC

.cycle-next When the mouse is hovered over, the data-cycle pauses on the fly. When the mouse is not hovered over, the data-cycle pauses on the fly. When the mouse is not hovered over, the data-cycle halted on the fly. “scrollHorz” data-cycle-timeout=”5000″> “scrollHorz” data-cycle-timeout=”5000″> Slide 1 of 2 Previous Slide 2 of 2 Next Slide

Helmsport MarinaSubdivision Location: New Hanover County, NC

In 2013, LMG began working with the developer to produce a concept for a residential marina that may be approved based on the varied water quality and natural resource conditions available on the site. Project Overview: Early on, talks were held with representatives from federal, state, and local authorities to establish design characteristics that would be advantageous to both the project and the surrounding environment. Prior to surveying, delineations of 404 and coastal wetlands were completed and authorized by the appropriate authorities.

  • It was decided to avoid or limit impacts on wetlands whenever feasible.
  • An old upland berm through the marsh was removed, graded to intertidal contours, and planted with Spartina alterniflora as part of the mitigation strategy.
  • An Environmental Assessment and Major Development Permit (CAMA) from the North Carolina Division of Coastal Management, as well as a Corps of Engineers General Permit 291 and 401 Water Quality Certification from the North Carolina Division of Water Quality, were received for the project.
  • data-cycle-pause-on-hover=”true” data-cycle-paused=”false” data-cycle-prev=”>.cycle-prev” data-cycle-slides=”>.slide” data-cycle-swipe=”true” data-cycle-swipe-fx=”scrollHorz” data-cycle-timeout=”5000″>.

Bay River Metropolitan Sewer District Location: Pamlico County, North Carolina

LMG collaborated with the Bay River Metropolitan Sewer District (MSD) in order to increase the overall wastewater discharge capacity at the Arapahoe sprayfields in order to support the county’s future growth potential. North Carolina Highway 306 runs through the Arapahoe sprayfields, which include a 511-acre piece of land. The North Carolina Department of Environment and Natural Resources (NC DENR) Division of Water Quality granted permission to use 137 acres of land at the site as sprayfields in 1993, according to the Division of Water Quality.

  • In 2011, LMG conducted a reevaluation of the land to assess if there was more wastewater capacity available on the property.
  • A complete soil mapping and analysis was carried out on the site by LMG in order to map out all of the extra appropriate soils that had the potential to be used as wastewater disposal sites.
  • In order to illustrate the mounding potential of the unconfined aquifer on the site, LMG was successful in creating a groundwater computer modeling simulation.
  • .

Brunswick Forest Permitting/Wetlands Location: Brunswick, NC

Overview of the project: Brunswick Forest is a 4,600-acre planned community near Leland, North Carolina, along the Town Creek. It was established in 2000. According to the final designs, the project would have over 10,000 house sites and several hundred thousand square feet of commercial retail center space at the project’s entrance. LMG supplied turnkey environmental services for the project over its entire lifecycle. We identified freshwater and coastal wetlands across this enormous site, and we conducted stream determinations using methodologies developed by the North Carolina Division of Water Quality (NC Division of Water Quality).

This data also provided as a baseline for assuring compliance with the North Carolina Department of Environment and Natural Resources’ advice for groundwater regulations as it relates to stormwater Best Management Practices.

During the design of the site plan, LMG worked closely with the project developer to ensure that environmental impacts were kept to a minimum.

A Nationwide 29 Permit from the US Army Corps of Engineers and a 401 Water Quality Certification from the North Carolina Division of Water Quality were sought for and acquired by LMG in order to mitigate unavoidable wetland and stream impacts.

In addition, soil scientists from LMG performed detailed soils analyses throughout the development process to assist planners and engineers in determining the most appropriate locations for the required stormwater facilities.cycle-next” data-cycle-pause-on-hover=”true” data-cycle-paused=”false” data-cycle-prev=”>.cycle-prev” data-cycle-slides=”>.slide” data-cycle-swipe=”true” data-cycle-sw Slide 1 of 2 Previous Slide 2 of 2 Next Slide

South Harbour Village Marina Location: Southport, NC

Beginning in 1997, LMG began working on obtaining South Harbour Village Marina the required permits from the California Maritime Authority, the Corps of Engineers, and the Division of Water Quality. As part of the planning process, a jurisdictional wetland delineation was completed and authorized, and LMG was involved in the marina siting and land use consultation with the developer, as well as the marina design. An old menhaden processing facility was to be demolished to make way for the marina, which was to be part of a bigger overall development project.

See also:  How Much Does A Cement Septic Tank Weigh? (Question)

LMG has renewed and modified the marina permit several times since its inception to allow for the addition of new and reconfigured boat slips, maintenance dredging, the development of a permanent designated dredge disposal site, and the installation of submerged silt curtains to aid in the reduction of sedimentation in the marina basin.

The next slide is represented by the data-cycle-pause-on-hover=”true” and the previous slide is represented by the data-cycle-paused=”false.” The previous slide is represented by the data-cycle-prev=”>.cycle-prev.” The data-cycle-slides are represented by the /.slide data-cycle-swipe=”true” and the data-cycle-timeout=”5000.”

Mason Inlet Relocation Project Mason Inlet Location: Wilmington, NC

Overview of the project: Environmental studies were undertaken by Land Management Group (LMG) in connection with the planning and permitting of the relocation of Mason Inlet in New Hanover County, North Carolina. LMG conducted and filed an Environmental Assessment in collaboration with Applied TechnologyManagement, Inc. (ATM), which comprised a project alternatives analysis, a Biological Assessment (Threatened and Endangered Species report), and an Essential Fish Habitat report. A CAMA Major Permit, as well as Section 404 and 401 Permits, were secured for the inlet relocation, which included the marsh area damaged by the expansion of Mason’s Creek.

  • A tidal salt marsh restoration plan was also prepared by LMG in order to mitigate the project’s negative consequences on the marsh’s natural environment.
  • LMG carried out wetland delineations, vegetation mapping, and soil borings on the island in order to give baseline information for the project’s design and development.
  • High marsh, low marsh, and main nursery habitats have all been successfully restored as part of the tidal salt marsh restoration project.
  • Our team created a biological monitoring strategy as well as a waterbird habitat management plan in line with the standards of the United States Fish and Wildlife Service (USFWS), the National Marine Fisheries Service (NMFS), and the United States Army Corps of Engineers (USACE).
  • cycles=”>.slides” data-cycle-pause-on-hover=”true” data-cycle-paused=”false” data-cycle-prev=”>.cycle-prev” data-cycle-prev=”>.cycle-prev” “scrollHorz” data-cycle-timeout=”5000″> “scrollHorz” data-cycle-timeout=”5000″> Slide 1 of 2 Previous Slide 2 of 2 Next Slide

Rutman Creek Watershed Restoration Location: Roper, North Carolina

Summary of the project: For the mine expansion project proposed by PCS Phosphate near Aurora, North Carolina, Land Management Group, Inc. (LMG) has been engaged to offer site-specific mitigation for the project. This extension will have significant wetland and stream consequences, necessitating the implementation of a number of large-scale projects in the lower Tar-Pamlico River Basin to mitigate the effects. In order to fulfill these obstacles, LMG conducted a comprehensive search in the counties of Hyde, Beaufort, and Pamlico in North Carolina.

  • There were almost 3,000 acres of regularly farmed agriculture on the plot, as well as around 1,000 acres of bay forest habitat that had been relatively untouched by humans.
  • During the course of the mitigation site development process, LMG served as the primary consultant and delivered the following services: The first step is to identify possible mitigating resources.
  • 5.
  • 7) Vegetation and physical monitoring were carried out year (2009-2016).
  • It has proven possible to rehabilitate large areas of headwater wetlands that had previously been drained and converted to agricultural commodity crop cultivation.
  • The canals and downstream receiving waters were particularly vulnerable to water quality deficiencies due to fertilizer (e.g., nitrogen and phosphorus) loading, sediment run-off, and herbicide/pesticide pollution prior to the restoration work being completed.

Planting all of the fields also offers water quality advantages by: (1) lowering overland flow velocities; (2) stabilizing the soil; and (3) encouraging the absorption and transformation of nutrients and pollutants into beneficial nutrients and toxins The removal or blocking of canals results in improved flood water storage, increased hydrologic residency, and related nutrient/sediment retention, among other benefits.

The restoration site also provides considerable habitat advantages to the Pocosin Lakes National Wildlife Refuge as well as habitat connection between Pocosin Lakes National Wildlife Refuge and the riverine swamp forests of Rutman Creek and Pungo River.

. Cycle Next” data-cycle paused=”true” data-cycled=”false” data-cycle-prev=”>.cycle-prev” data-cycle-slides=”>.slide” data-cycle-swipe=”true” data-cycle-timeout=”5000″> Slide 1 of 2 Previous Slide 2 of 2 Next Slide

Bachelors Delight Stream and Wetland Mitigation Bank Location: Jacksonville, North Carolina

Summary of the work: For the mine expansion project proposed by PCS Phosphate near Aurora, North Carolina, Land Management Group, Inc. (LMG) was hired to offer site-specific mitigation services. There will be significant consequences to wetlands and streams as a result of this development, which will need a number of large-scale improvements throughout the Tar-Pamlico River Basin. A comprehensive search was launched in Hyde, Beaufort, and Pamlico Counties in order to fulfill these requirements.

  1. There were almost 3,000 acres of regularly produced agriculture on the plot, as well as around 1,000 acres of bay forest habitat that had been left relatively untouched.
  2. During the course of the mitigation site development process, LMG served as the primary consultant and delivered the services listed below: 1) Identification of possible mitigating resources.
  3. 5.
  4. • Annual vegetation and physical monitoring were carried out (2009-2016).
  5. It has been possible to rehabilitate large areas of headwater wetlands that had previously been drained and converted to commodity crop farming.
  6. The canals and downstream receiving waters were particularly vulnerable to water quality deficiencies due to fertilizer (e.g., nitrogen and phosphorus) loading, sediment run-off, and herbicide/pesticide pollution prior to the restoration work being carried out on the property.
  7. As an added advantage to water quality, planting all of the fields has the following effects: (1) reduces overland flow velocities, (2) stabilizes soil, and (3) promotes the uptake and transformation of nutrients and pollutants.
  8. The restoration site also provides considerable ecological advantages to the Pocosin Lakes National Wildlife Refuge, as well as habitat connection between it and the riverine swamp forests of Rutman Creek and the Pungo River.

. data-cycle-pause-on-hover=”true” data-cycle-paused=”false” data-cycle-prev=”>.cycle-prev” data-cycle-slides=”>.slide” data-cycle-swipe=”true” data-cycle-swipe-fx=”scrollHorz” data-cycle-timeout=”5000″> Slide 1 of 2 Slide 2 of 2

Pamlico Classified Ads on TownDock.net

* * *Sale Pending* * ** * *38 Shore Dr. E, Oriental, NC 28571* * * A 2,842 hsf home in Forestshore Estates.Cook’s kitchen w/granite counters, solid-wood cabinets, SS appliances, center island,walk-in pantry.Screened porch is just off breakfast area w/water views.Formal dining roomvaulted-ceiling living roomgas log fireplace face waterfront. Primary suite features wide-water views w/direct access to waterfront deck. Primary bath features huge walk-in tiled shower from floor to ceiling with hisher shower areas, double vanitiesdouble walk-in closets. Laundry room serves as hobby room/office w/stylish cabinetsdrawers. Has 2-car garagedetached workshop/storage bldg.Updated roof (2012), HVAC system (2011) w/all ductwork in ceilings, 20 KW Generac whole-house generator (2014) that has full-warranty until July, 2024. Boat dock features 50’ wet slip w/ 5’ of controlling water depth10,000 pound low-profile boat lift in another slip. Well for irrigation/watering outside areas. Concrete driveway.See additional photos atwww.orientalncwaterfront.com Contact Mariner Realty, Inc. to schedule a showing and obtain additional information about this and other properties in the area.Offered at $750,000Office 252-249-1014After Hours 252-671-4644 (Cell)[email protected] www.orientalncwaterfront.com

Best Septic Tank Installers – New Bern NC

New 28562 is the address of the project. Date:02/08/2022 Project Description:Install a new septic tank in a location where none already exists. Home appliances include: kitchen sink, dish washer, garbage disposal, bathroom sink, toilet, shower/bath tub, washing machine, and a refrigerator. Request Stage: Preparation Budgeting Desired completion date: The completion date is negotiable. Property Owner:Yes, the property is located at home or in a residence. 28560 is the address of the project. Date:01/2022 Request Stage: Preparation Budgeting Desired completion date: The completion date is negotiable.

  1. 28562 is the address of the project.
  2. Items found in the home include: a kitchen sink, a bathroom sink, a toilet, a shower or bath tub, and a washing machine.
  3. Property Owner:Yes, the property is located at home or in a residence.
  4. Date:01/2022 Description of the project:Replace an existing septic tank.
  5. Property Owner:Yes, the property is located at home or in a residence.
  6. Location of the project: 28560Date of completion: 01/2022 Project Description:Install a new septic tank in a location where none already exists.
  7. Request Stage: Preparation Budgeting 1 – 2 weeks is the target completion date.

sewage disposal system for the camper trailer 28562 is the address of the project.

Items found in the house: a kitchen sink and a toilet.

Location:Home/Residence Yes, the property is owned by someone.

28562 is the address of the project.

Items found in the house: a kitchen sink, a dishwasher, and a garbage disposal Request Stage: Preparation Budgeting 1 – 2 weeks is the target completion date.

Clean the septic lines and replace the grease trap and lines, as needed.

Date:11/2021 Project Description:Install a new septic tank in a location where none already exists.

Request Stage: Prepared for Hiring Desired completion date: The completion date is negotiable.

Comment:Perked land is in need of a septic system in order to build a house on the site acquired.

Items found in the home include: a kitchen sink, a dishwasher, a bathroom sink, a toilet, a shower or a bath tub, and a washing machine.

Property Owner:Yes, the property is located at home or in a residence.

I believe the line has been tampered with.

Project Location: 28560Date: 11/2021Project Description: Project Description:Install a new septic tank in a location where none already exists.

Request Stage: Prepared for Hiring 1 – 2 weeks is the target completion date.

28560 is the address of the project.

Home appliances include: kitchen sink, dish washer, garbage disposal, bathroom sink, toilet, shower/bath tub, washing machine, and a refrigerator.

Location:Home/Residence Yes, the property is owned by someone.

We are looking for an estimate for the installation of a septic system on our property.

The land has been cleared, and a current septic permit has been obtained.

(4) 100-foot lines with 9-foot spacing and 8-inch depths, as well as a 30-foot-by-100-foot repair area 28560 is the address of the project.

Location:Home/Residence Yes, the property is owned by someone.

Project Location: 28560Date: 08/2021Project Description: Description of the project:Replace an existing septic tank.

Request Stage: Preparation Budgeting More than 2 weeks is the preferred completion date.

Comment: I need to get my septic tank rebuilt.

Date:07/2021 Project Description:Install a new septic tank in a location where none already exists.

Request Stage: Prepared for Hiring Desired completion date: The completion date is negotiable.

28562 is the address of the project.

Items found in the home include: a kitchen sink, a dishwasher, a bathroom sink, a toilet, a shower/bath tub, a utility sink, and a washing machine, among others.

Property Owner:Yes, the property is located at home or in a residence.

Two-bedroom, two-bathroom home.

Date:03/2021 Project Description:Install a new septic tank in a location where none already exists.

Request Stage: Prepared for Hiring More than 2 weeks is the preferred completion date.

28560 is the address of the project.

Items found in the home include: a kitchen sink, a bathroom sink, and a toilet.

It appears to be a home or a residence.

28560 is the address of the project.

Home appliances include: kitchen sink, dish washer, garbage disposal, bathroom sink, toilet, shower/bath tub, washing machine, and a refrigerator.

Home/Residence is the type of site this is.

28562 is the address of the project.

See also:  What Does A Septic Tank Drain Hole Look Like? (Solved)

Home/Residence is the type of site this is.

28562 is the address of the project.

In the house: Kitchen sink, dishwashing machine, bathroom sink, toilet, shower/bath tub, utility sink, washing machine, and a swimming pool.

Request Stage: Prepared for Hiring Desired completion date: The completion date is negotiable. Home/Residence is the type of site this is. Yes, the property is owned by someone. Comment: The septic system is completely overrun. It is possible that it will need to be replaced.

How Your Septic System Works

Posted on February 8, 2015 by Pro Tips The septic tank and the drain field are the two most important components of a basic septic system, respectively. The septic tank is the first place where household wastewater ends up. During the wastewater treatment process, heavy solids are deposited at the bottom of the tank, where they form a layer of sludge, while grease and light solids float to the top and form a layer of scum. The sludge and scum remain in the tank, where naturally occurring bacteria are at work breaking them down to make way for new material.

  • With each new batch of wastewater entering the septic tank from the house, the separated wastewater in the middle layer of the tank is pushed out into the drain field.
  • If an excessive amount of water is flushed into the septic tank in a short period of time, the wastewater will flow out of the tank before it has had a chance to settle.
  • Ideally, homeowners should stagger their laundry loads throughout the week and limit themselves to no more than two load of laundry per day.
  • In addition to providing additional treatment for wastewater, drain fields allow it to trickle from a series of perforated pipes, through a layer of gravel, and then down through the soil.
  • Solids cause damage to the drain field by clogging the small holes in the drain field pipes, and excess water causes the system to overwork unnecessarily by saturating the drain field.
  • They do not have any moving parts and are simple to operate and keep up to date.
  • * The National Environmental Services Center provided the information for this article.

Septic System Rant.need some advice!

You are currently using an out-of-date web browser. It is possible that this or other websites will not show correctly. You need either upgrade your browser or switch to another one. After selling and closing on my property in Craven County on April 6th, I started looking for a new home immediately. Well, on May 1st, I identified one and made an offer, which was accepted subject to the passing of a perk test. Since then, I’ve been fighting the county’s environmental services tooth and nail. Before making the offer, I placed a few hedging wagers to protect myself.

His enthusiasm permeated the whole region, and we discovered a location along the roadway and close to an ancient homestead with an existing system that should have simply required a standard system, as well as another spot, where I really wanted to construct, that would have required a mound system, as well.

On May 7th, I submitted an application for a septic permit/perk test, after spending $300 to have a forestry cutter come in and punch a road and many grids for the inspector.

TWO MONTHS LATER.in Pamlico County, which has some of the most sluggish development in the state.

Because they would not allow any system of any shape in the region where I intended to build, and even in the area close to the ancient farmhouse where we identified the finest soil drainage, they would still need an 18-inch system “a mound There is no way I could develop in the area closest to the ancient farmhouse since I would have to demolish and dispose of three old structures that have fallen to the ground.

The fees would be too expensive, and I don’t want to be so near to a major thoroughfare in the first place.

According to the County’s calculations, it will be necessary for me to construct a secondary tank, a pump station, and to pump water about 100 yards to the drain field.

That amount exceeds the purchase price of the 4.25 acres of property.

Someone somebody assist me in locating it!

I was being bullied into paying $3500 for a variance that would allow me to have three chickens and a coop.

Every time it rained, a torrent of mud would pour down the road.

Before this is through, you’re going to have a lot more grey hair and/or lose what little hair you have left.

Years ago, we had similar problems with the Inspectors in Chatham County, and it took engineering from the State of North Carolina in Raleigh to resolve the situation.

The proposal was authorized by the state, which overruled the county inspectors.

Considering that I know individuals who are forced to spend $25,000.00 – $30,000.00 on systems today, $14K is not a terrible investment in today’s economy.

However, I still feel that an old-fashioned system is appropriate, consisting of a tank and a couple hundred feet of drain line in a ditch coated with crushed stone; however, I am not in charge of enforcing the laws.

Years ago, we had similar problems with the Inspectors in Chatham County, and it took engineering from the State of North Carolina in Raleigh to resolve the situation.

The proposal was authorized by the state, which overruled the county inspectors.

Considering that I know individuals who are forced to spend $25,000.00 – $30,000.00 on systems today, $14K is not a terrible investment in today’s economy.

However, I still feel that an old-fashioned system is appropriate, consisting of a tank and a couple hundred feet of drain line in a ditch coated with crushed stone; however, I am not in charge of enforcing the laws.

Right now, I’m on the phone and responding to an email.

They have a lot of experience creating systems and getting them approved.

The state and county are frequently fast to rule out regions and do not take the time or energy to figure out a solution, which is why many developers rely on us to help them get their projects completed.

You engage an engineer to design the system, and all you have to do is tell the county that you are opting to go via the engineer option permit path rather than the county option permit route.

What would be the first place I’d look?

To be honest with you, finding an engineer who can accomplish it has proven to be a difficult task thus far, boomer.

Do you know anyone who works in the PE field?

I know of two, but they aren’t in your immediate vicinity.

Two tanks (one of which is a pump tank) and 320 feet of chambers are available.

$14000 seems like a lot of money to me.

I am not familiar with anyone in your region, but I am aware that a large number of engineer option permits have been awarded in Pender and Onslow Counties, so I would start looking in that area for a qualified engineer candidate.

In addition, some of them should be qualified to develop systems themselves.

After only a few minutes of talk, he introduced me to a gentleman from Richlands, who agreed to assist me.

The seller agreed to lower his asking price based on the results of the perk test.

I should be able to close on the property within a few days.

Two tanks (one of which is a pump tank) and 320 feet of chambers are available.

$14000 seems like a lot of money to me.

There will be some clearing of land required, but I will have to pump 75 to 100 yards of water.

I’m going to find out who is hungry.

Keep an eye out for danger.

More over half of the county’s population must depart to go to work!

If there is clearing being done, I recommend getting your perk test done first.

It makes sense, witler, especially if you’re dealing with a large, heavy mat to remove.

Because the majority of the site is comprised of massive old growth timber, there is minimal understory, and what is present will be managed by a forestry cutter.

I’d want to provide an update on the land/septic issues I’d been having.

I also engaged one of the soil scientist/consulting businesses from a list supplied by Soilman and seconded by dc bigdaddy, which was on the list provided by Soilman.

After inspecting the property, he came back with EXACTLY the same conclusions as Soilman, who had been gracious enough to come check it out before I made my original bid.

These two methods completely avoid the County agent, who would not even accept the concept of installing a security system close to the construction site.

The first option is a standard mound system that may be placed nearly anywhere on the homesite property.

Other options included digging four feet below earth, spreading a layer of sand, and burying the drain field completely below, with no apparent mound.

According to one of the installers I spoke with, I would require 25 loads of dirt just for the mound system.

The next step is to send out both of the suggested system blueprints to every qualified installer in the region and have them bid on the system as well as any land clearance that may be required by the project.

You most likely spared me from spending a significant amount of money that could have been better spent on improvements to my new house.

It’s good to know in case you need it in the future.

Tapatalk was used to send this message from my iPhone.

Glad to hear that you were able to get things worked out, longrifle.

You’ve done well, you two.

That’s a fantastic gesture on their part.

We’re happy he was able to assist you.

I’ve been hoping to hear some good news about this for quite some time.

Pleased to hear that things are finally falling into place for you.

Thank you very much, Soilman!

In the weeks following his visit, which included the perk test and an explanation of the engineering choices, I’ve attempted to contact the soil scientist I hired twice through text message.

To cancel the County’s permission, begin removing land, and instruct the Power Company to begin constructing underground lines, I must first get these documents in my possession.

Have never witnessed a procedure where you have to work so hard only to hand over your hard-earned money to someone else!

I’ve never seen anything like it before; it’s almost as if we’re on a date or something.

Well, I wish it were all sunshine and roses, but unfortunately, that is not the case.

So far, there has been no answer, and I’ve now been waiting for plans that were supposed to be ready the following day for a week.

I’m on hold once more, twiddling my thumbs impatiently.

Could it be that there’s anything about this business that I’m overlooking? I’ve never seen anything like it before; it’s almost as if we’re on a date or something. Hopefully, he was just on vacation when this happened.

Leave a Comment

Your email address will not be published. Required fields are marked *