What You Need To Run A New Septic Tank Line?

  • You will need to dig either four two-foot long trenches or two 50-foot trenches for a 1,000-gallon septic tank. Each trench should be three to four feet wide and equally deep. Make your trenches so they tilt downward slightly, but no more than a 1/4-inch incline for every eight feet you have.

How do you run a new sewer line?

Here are the procedures to follow when installing a new sewer line.

  1. Determine the Pipe’s Depth. Always begin by deciding the elevation of each pipe.
  2. Compute the Slope.
  3. Dig the trench and Lay the Bleeding.
  4. Install the Pipe.
  5. Back Fill the Trench.

How much field line do I need for a septic tank?

A typical septic drainfield trench is 18 to 30 inches in depth, with a maximum soil cover over the disposal field of 36″; or per the USDA, 2 feet to 5 feet in depth.

What kind of pipe is used for septic drain field?

Corrugated pipe is typically used for drain fields. Septic systems use drain fields to treat the septic tank effluent for the removal of impurities and contaminants. The field is made up of trenches typically containing washed “drainrock” or gravel.

Can you have a septic tank without a leach field?

The waste from most septic tanks flows to a soakaway system or a drainage field. If your septic tank doesn’t have a drainage field or soakaway system, the waste water will instead flow through a sealed pipe and empty straight into a ditch or a local water course.

Can I install my own leach field?

You may also need to pull a permit to put in a new leach field. A leach field is an important part of a septic system. It disperses fluid from the septic system over a large area of soil adjacent to the building it services. Building your own leach field is physically difficult, but it can save you lots of money.

What is code for sewer pipe?

According to the California Plumbing Code, underground water pipes must be buried at least 12 inches, and any solder used to connect pipes must be lead-free in water systems for potable, or drinking, water.

Which pipe is best for sewer line?

PVC. The leading choice in residential drain lines over the past four decades, PVC is a light-colored, highly durable plastic that resists the elements and appears to outlast all other piping materials. PVC is made in several different grades: schedules 40 and 80 and chlorinated polyvinyl chloride (CPVC).

How long do leach lines need to be?

A standard leach line is considered to be three (3) feet wide and three (3) feet deep with a length as required. A non-standard leach line is wider, narrower, and/or deeper than three (3) feet with a length as required.

How deep should septic drain field be?

A typical drainfield trench is 18 to 30 inches in depth, with a maximum soil cover over the disposal field of 36 inches.

What is the slope for septic lines?

A typical septic tank has a 4-inch inlet located at the top. The pipe that connects to it must maintain a 1/4-inch-per-foot slope toward it from the house. This means that for every 10 feet of distance between the tank and the house, the inlet must be 2 1/2 inches below the point at which the pipe exits the house.

What size pipe do you use for a leach field?

Leach Fields are trenches (or rectangular beds) dug in yard and filled with a foot of 3/4″ to 1-1/2″ gravel and a four inch diameter perforated pipe.

Can you use corrugated pipe for septic drain field?

You should use a four-inch pipe made of rigid PVC that has appropriate drainage holes. Never use corrugated flexible piping as these can’t be cleaned without damaging the pipe. Once you’ve dug down to the original pipe, remove it carefully. Ensure there’s a layer of gravel still in place for proper drainage.

How to Run a Septic Tank Line From Your House

A septic system is made up of two lengths of pipe that are connected together. Initially, it runs from the house, where the system services are located, to a tank, where the waste is separated and solids settle out. The second section runs from the tank to the drainage field, where fluids from the tank are dispersed into the earth underneath the tank. The process of installing the first run of pipe is quite similar to that of installing a traditional sewage line. It is necessary to maintain a downhill slope to the storage tank.

Locating the Septic Tank

The tank serves as the nerve center of the septic system. It is required to be situated between the residence and the drainage field. Each and every septic installation must begin with a soil test, and depending on the results, soil conditions may necessitate the placement of the tank in a less-than-ideal site for digging sewer lines. Also required are minimum setback distances from property borders, functioning wells, surface water and other obstructions to provide a safe working environment.

Tank Depth

A standard septic tank has a 4-inch intake at the top, which is positioned towards the bottom. Ideally, a 1/4-inch-per-foot slope toward the pipe from the house should be maintained by the pipe connecting to it. To put it another way, for every 10 feet of distance between a tank and a home, the inlet must be 2 1/2 inches lower than where the pipe departs the house at its lowest point. The pipe usually exits at ground level, although it may need to pass beneath a foundation footing or concrete pad in rare cases.

Digging the Trench

The trench for the septic pipe should be dug before the hole for the tank since you will need a backhoe to complete the work and the tank will get in your way if it is already in the ground. To allow rainfall to drain properly, the pipe should be placed on a 2- or 3-inch bed of drain rock, so remember to account for this extra depth when digging. It is normal to use a four-inch pipe, and it should be installed far enough down to link with the main soil stack, which is a three-inch pipe that runs vertically past the main bathroom and through the roof of the home.

Precautions

Local building and health agencies will demand permits for a septic tank installation. You will also be required to submit a design plan before the permits will be provided, so prepare ahead of time. This layout should be developed in collaboration with a local builder who is familiar with the unique characteristics of the topography in your neighborhood. Stay away from planting trees or plants near the tank, drainage field, or any of the pipe systems.

They will be drawn to the pipes in their hunt for nutrition, and their roots will be able to successfully block them. You will be unable to use your septic system until the roots have been removed from the pipe. Removal may be both expensive and time-consuming.

placing the septic or sewer pipe in the trench

  • In this section, you can ask questions or express your opinions about trenching for Septic or Sewer Pipes.

InspectAPedia does not allow any form of conflict of interest. The sponsors, goods, and services described on this website are not affiliated with us in any way. Replacement of a sewer or septic line entails inserting a new pipe into an existing trench. When a sewer pipe, often known as a “drain line,” has to be changed, this article discusses how to install a new sewer line. Using real-world examples and photographs, we demonstrate how to diagnose and replace a clogged sewage line in an actual case study.

Use the SEARCH BOX to discover the information you’re looking for quickly.

Guide to installing the replacement sewer pipe line

This article on sewage line replacement discusses how to install the new sewer pipe and link it to the existing system.

  • Precautions should be taken during the excavation of sewage lines or septic lines. The maximum permitted slope for sewer or septic line pipe is recommended. Specifications for sewer or septic line trenches include homogeneity, soil compaction, and breadth. specifications for installing sewer or septic pipe into the trenches that have been excavated Size (diameter) and slope of the sewage line that should be used
  • Avoiding rocks and voids, using sand, and shielding the new septic or sewage system from damage are all important considerations.

Safety of occupants and neighbors during excavation for sewer line repairs

When the plumbers finished their work, they left a hole in the ground that was a tripping hazard for anyone who happened to walk over it. Our quick impromptu danger indications (a few wood fence pieces and a laundry basket in the vicinity) were amateurish and unsecure, but at the very least we had a visual indication that there was something to be cautious of. We next proceeded on a quest for more durable materials to use to conceal the hole until the rest of the repair work could be completed.

Safety during sewer line trench excavation

In addition, when excavators were required to leave the site between project phases, the site was marked off with yellow danger tape connected to sticks during the excavation process. People who are at risk of falling into a ditch are also warned in this way, albeit in an amateurish manner. Do not leave any site excavations open and unattended; the dangers include harm as a result of someone falling in, as well as the possibility of pipe freezing in colder climes.

What is the proper slope for sewer lines between house and septic tank or sewer main?

It is preferable for sewage line trenches to have a constant slope, with a grade ranging between 2 percent and 10 percent grade – that is, the sewer line slope can drop anywhere between two and ten feet every hundred feet of run – rather than a steep slope. You can see that the slope of the sewer line down this hillside is far too steep. A problem (which is less prevalent in plastic pvc pipes than in cast iron pipes) is that the water and particles in the sewage do not remain together, resulting in solids remaining in the piping and clogging it.

Sewer Line Trench Details: uniformity, soil compaction

Ideally, the sewage line trench bottom should be appropriately and consistently sloped and compacted in order to prevent sewer line pipes from drooping or breaking, clogging, or piping failure. A virgin soil layer should be present at the bottom of the sewage line trench – it should not have been over-excavated. However, because trenching is a sloppy craft, certain trench portions may be irregular and deeper in some places than others. To minimize future sags, it is necessary to compress the dirt used as fill beneath the sewer piping in this situation.

In addition, if trenches are not dug below the frost line, wastewater resting in a low pipe sag in a cold region may freeze, causing the system to become completely inoperable.

The Alaska Septic Installation Manual recommends that sewage line trenches be as shallow as feasible in width and that plumbing be installed on undisturbed soil or compacted backfill dirt, according to the Alaska Septic Installation Manual.

Installing the replacement sewer line

In most jurisdictions (with the exception of Alaska), the minimum diameter sewage line piping authorized is four inches in diameter. Clogging is more likely to occur in smaller lines. We’re talking about gravity-flow sewage lines in this context. Typically, sewerage is transported by a pumped or forced sewer main after having passed through an impervious surface, which allows for smaller diameter pipework to be used in residential applications. Sections of the new drain were put down the trench for installation, trimmed to length at each end, and then linked together with the existing drain system.

We connected the new drain line to the existing stub of cast iron sewer line that was located outside the house foundation wall at the house end that was higher up the hill.

The rubber connection that was used to connect the two drains developed a leak and had to be replaced, therefore it was necessary to reconnect them.

An askewpipe connection has a higher chance of leaking.

Question:

(2nd of February, 2012) Someone asked: What is the minimum size sewage drain line required by the International Building Code, and are 90-degree bends allowed under the code? Is there a limit to how many 90’s are acceptable? for example, 2 or 3?

Reply:

Whenever possible, plumbers avoid 90-degree angles on sewer lines because they tend to clog. Use a 45-degree angle, or two 45-degree angles if you need to make a 90-degree turn. More bends than are absolutely necessary also increases the likelihood of blockage.

Question:

(5th of September, 2012) The following question was submitted by [email protected]: “What is the proper diameter of the new PVC drainage pipe to connect to the side entrance of a concrete septic tank that measures 5 3/4″ inner diameter and 7 1/2″ exterior diameter?” Moreover, what should I use to plug the entrance in an area where there is a severe root problem?

Question: connecting the new sewer line to a septic tank that was connected to terra-cotta piping

29th of March, 2015 joh hymanexplained: The terra cotta pipe that goes into the septic tank is 4 inches in diameter; how do you get it out of the tank? Is it possible to reduce the pipe size to three inches at the point where it enters the tank?

Reply:

Joh There is a good chance that an ancient portion of terra-cotta sewage line that enters the septic tank has been sealed with concrete. Terracotta, on the other hand, is fairly soft. You’ll need to take the following steps to get started: 1. After you have dug the tank to the point where you have enough working space, and ALWAYS WORKING ALONE since falling into a septic tank is typically fatal, you will chip off the old terra-cotta line using a hammer and a mason’s chisel. Of course, you should use goggles and other safety gear.

you will need to install a baffle or pipe tee in the tank (from the inside walll of the tank) (DO NOT ENTER A SEPTIC TANK OR LEAN OVER IT AS THIS CAN BE FATAL) The tank tee may protrude through the opened wall of the septic tank to provide a 3.

You’ll need to use a masonry sealer or cement to seal the area surrounding the pipe passageway.

Question: find the sepic tank cleanout port

Asked by Anonymous: How do you locate the inspection holes in order to get the tank pumped?

Reply:

Beginning with SEPTIC TANK, HOW TO FIND THEM, we will explain how to locate the septic tank in an ongoing series of articles. At that point, you just lift it up to reveal the cleanout port(s) in the tank’s top, and you’re done. If the tank is deep, discuss with your septic contractor the possibility of installing septic tank risers before re-burying it again to make the next cleanup simpler. Reading at BED the SEWER LINE in SAND Alternatively, choose a topic from the closely related articles listed below, or browse the entireARTICLE INDEX.

Article Series

  • DESCRIBE HOW TO DIAGNOSE A BLOCKED DRAIN
  • WHEN TO CALL A PLUMBER
  • DISCOVER THE MAIN BUILDING DRAIN
  • HOW TO USE A POWER SNAKE TO CLEAR A BLOCKED DRAIN
  • WHEN NOT TO CALL A PLUMBER MAKE OTHER SEPTIC REPAIRS AND DETERMINE THE DISTANCE TO DRAIN BLOCKAGE
  • DETERMINE THE NECESSITY OF DRAIN LIP REPLACEMENT
  • REPLACE THE SEWER LINE, STEP BY STEP
  • THE INSTALLATION OF A NEW SEWER LINE
  • BEDDING THE SEWER LINE WITH SAND
  • TRENCH FOR THE FINAL BACKFILL SEWER LINE
  • LOCATION OF DOCUMENT BURIED COMPONENTS
  • FINAL SEEDING AND RESTORATION
  • SEWER / SEPTIC LINES ON STEEP SITES
See also:  How To Tell If Gour Septic Tank Needs To Be Emptied? (Solution found)

Suggested citation for this web page

At Inspect A pedia.com, an online encyclopedia of building environmental inspection, testing, diagnosis, repair, and issue preventive guidance is available: INSTALLING THE NEW SEWER LINE Alternatively, have a look at this.

INDEX to RELATED ARTICLES:ARTICLE INDEX to DRAIN SEPTIC SEWER PIPES

Alternatives include asking a question or searching InspectApedia using the SEARCH BOXfound below.

Ask a Question or Search InspectApedia

We encourage you to use the search box just below, or if you prefer, you may make a question or remark in theCommentsbox below and we will get back to you as soon as possible. InspectApedia is a website that allows you to search for things. Please keep in mind that the publication of your remark below may be delayed if it contains an image, a web link, or text that seems to the program to be a web link. Your submission will appear when it has been reviewed by a moderator. We sincerely apologize for the inconvenience.

Technical ReviewersReferences

Citations can be shown or hidden by selecting Show or Hide Citations. InspectApedia.com is a publisher that provides references. Daniel Friedman is an American journalist and author.

How to Tie Into an Existing Septic Tank

Adding more input lines to your current septic tank is a viable option if your tank is working properly and is much below its maximum capacity for consumption. If you want to do this, you will need to integrate the new addition into the old system without causing any disruptions or changes to the existing system. The difficulty of this work will be greatly influenced by the location of the new addition as well as the technique of installation employed for your existing systems.

Step 1

Determine the location of the drain pipe that runs from the present residence to the septic tank. This may be accomplished by locating the main drain line beneath your property and recording the locations where it passes beneath or through the foundation. Move along this line outside the house until you are roughly eight feet away from the house, then turn around. Continue digging until you reach the drain line. There should be no more than 24 inches in depth below the surface of the ground for the line, which should be a 4-inch pipe.

Step 2

You should dig until you have exposed roughly three feet of the drainpipe once you have found it and marked it with chalk. In addition, you will need to dig down a little bit to provide access all the way around the pipeline. To get to the start point of the new field line, dig a ditch from this point onward.

This ditch should be constructed in a straight line and at a small gradient from the current drain to the starting point of the new drain system. Remove any big boulders or roots that may have accumulated in this ditch.

Step 3

PVC pipe sections of four inches in diameter should be laid from the new drain point to the old drain line. Before applying PVC cement, make sure that all pipe ends and fittings have been cleaned using PVC pipe cleaner. Connect the drain line to the new drain point, ensuring sure that all of the fittings are securely fastened to the pipe. Once you have verified that there are no appliances running in the house, use the hacksaw to cut through the current drain line. Using a sharp knife, make two incisions roughly six inches apart.

Step 4

Insert the tee fitting into the hole that you just made in the wall with your fingers. Because the drainpipe and fitting will be a very tight fit, you will need to flex the drainpipe and wedge the fitting into position. Before installing the fitting, thoroughly clean the fitting and pipe ends. You will need to move rapidly once the cement has been applied in order to get the fitting in place since the cement will harden very quickly. Make the necessary adjustments to the fitting so that the new intake is directly in line with the new pipe.

Check that all of the fittings are in place before back-filling all of the ditches.

Septic Tank Installation and Pricing

To process and dispose of waste, a septic system has an underground septic tank constructed of plastic, concrete, fiberglass, or other material that is located beneath the earth. Designed to provide a customized wastewater treatment solution for business and residential locations, this system may be installed anywhere. Although it is possible to construct a septic tank on your own, we recommend that you hire a professional to do it owing to the amount of skill and specific equipment required.

Who Needs a Septic Tank?

For the most part, in densely populated areas of the nation, a home’s plumbing system is directly connected to the municipal sewer system. Because municipal sewer lines are not readily available in more rural regions, sewage must be treated in a septic tank. If you’re moving into a newly constructed house or onto land that doesn’t already have a septic tank, you’ll be responsible for putting in a septic system on your own.

How to Prepare for Your Septic Tank Installation

Here are a few pointers to keep in mind to make sure your septic tank installation goes as smoothly as possible.

Receive Multiple Estimates

Receiving quotations from licensed septic tank installers and reading reviews about each firm using trustworthy, third-party customer evaluations should be done before any excavation or signing of any paperwork is done.

Examine your options for a contractor and make sure they have the appropriate insurance and license, as well as the ability to include critical preparations such as excavation and drain field testing in their quotation.

Test the Soil and Obtain a Permit

For septic systems to function properly, permeable soil surrounding the tank must absorb and naturally handle liquid waste, ensuring that it does not pollute runoff water or seep into the groundwater. The drain or leach field is the name given to this region. Before establishing a septic tank, you are required by law to do a percolation test, sometimes known as a “perc” test. This test indicates that the soil fits the specifications established by the city and the local health agency. In most cases, suitable levels of permeable materials, such as sand or gravel, are necessary in a soil’s composition.

Note: If you wish to install a septic tank on your property, you must first ensure that the ground passes the percolation test.

Plan for Excavation

Excavation of the vast quantity of land required for a septic tank necessitates the use of heavy machinery. If you are presently residing on the property, be careful to account for landscaping fees to repair any damage that may have occurred during the excavation process. Plan the excavation for your new home at a period when it will have the least influence on the construction process if you are constructing a new home. Typically, this occurs before to the paving of roads and walkways, but after the basic structure of the home has been constructed and erected.

The Cost of Installing a Septic Tank

There are a few installation charges and additional expenditures connected with constructing a new septic system, ranging from a percolation test to emptying the septic tank and everything in between.

Percolation Test

A percolation test can range in price from $250 to $1,000, depending on the area of the property and the soil characteristics that are being tested. Ordinarily, specialists will only excavate a small number of holes in the intended leach field region; however, if a land study is required to identify where to excavate, the cost of your test may rise.

Building Permit Application

A permit will be required if you want to install a septic tank on your property. State-by-state variations in permit prices exist, however they are normally priced around $200 and must be renewed every few years on average.

Excavation and Installation

When you have passed a percolation test and obtained a building permit, your septic tank is ready to be professionally placed. The cost of a new septic system is determined by the size of your home, the kind of system you choose, and the material used in your septic tank. The following is a list of the many treatment methods and storage tanks that are now available, as well as the normal pricing associated with each.

Types of Septic Tank Systems

Septic system that is used in the traditional sense Traditionally, a septic system relies on gravity to transport waste from the home into the septic tank. Solid trash settles at the bottom of the sewage treatment plant, while liquid sewage rises to the top. Whenever the amount of liquid sewage increases over the outflow pipe, the liquid waste is discharged into the drain field, where it continues to disintegrate. This type of traditional septic system is generally the most economical, with an average cost of roughly $3,000 on the market today.

Drain fields for alternative systems often demand less land and emit cleaner effluent.

Septic system that has been engineered A poorly developed soil or a property placed on an uphill slope need the installation of an engineered septic system, which is the most difficult to install.

It is necessary to pump the liquid waste onto a leach field, rather than depending on gravity to drain it, in order to ensure that it is equally dispersed across the land. The average cost of these systems is around $8,000.

Types of Septic Tanks

  • Concrete septic tanks are long-lasting and rust-proof, but they are difficult to repair if they are damaged. It is possible that concrete tanks will cost up to $2,000 depending on their size. Plastic —While plastic tanks are cost-effective, they are also susceptible to damage. They are around $1,200 in price. Fiberglass —While fiberglass septic tanks are more durable than their plastic counterparts, they are susceptible to shifting or displacement if the water table rises to an excessive level. Depending on the model, these tanks may cost up to $2,000

More information may be found at: Septic Warranty Coverage and Costs.

Using Your Septic Tank

It is important to maintain the area around your new septic tank’s drain field and to frequently check your tank using the lids included with it. Never use a trash disposal in conjunction with your septic tank since it might cause the system to clog. Additionally, avoid driving over the land where your septic tank is located or putting heavy gear on top of your septic tank or drain field to prevent damage. Most of the time, after five years of septic system use, you’ll need to arrange a cleaning and pumping of the system.

Send an email to our Reviews Team [email protected] if you have any comments or questions regarding this post.

How to Install a Septic System

Documentation Download Documentation Download Documentation In rural regions of the nation where waste water treatment is not accessible, private on-site wastewater treatment systems (POWTS), also known as septic systems, are utilized largely to treat waste water. Gravity fed/conventional systems are divided into two broad categories: 1. gravity fed/conventional systems and 2. alternative (pump) systems, which include aerobic treatment units (ATUs.) In most cases, electric pumps are used in alternative systems.

However, in many health jurisdictions across the United States, it is still feasible for an individual property owner with heavy equipment operation skills to utilize a backhoe to establish a septic system on their land.

Steps

  1. 1 Make a plan and design for your system. Performing a site survey and conducting a percolation (soil) test on the area where the POWTS is to be placed are both required initial steps in any septic system installation. In order to create a system, it is necessary to first gather information from surveyors and conduct a soil test. After this, the proper permissions and approvals may be requested for
  • The following are some of the conclusions from the site survey that have an impact on the design:
  • Available space
  • Terrain
  • Intended purpose and projected water demand depending on the size of the residence or building that the system will serve
  • Location of the well and/or nearby wells
  • And other factors.
  • The following are examples of soil test findings that have an impact on the design:
  • The soil type and layering (sand, clay, rock, and where it is placed in relation to depth)
  • The soil’s ability to drain and filter wastewater
  • And the soil’s ability to drain and filter wastewater
  1. 2Wait for clearance before proceeding. The system may be deployed once all of the relevant permissions and approvals have been obtained. Make certain that all of the steps listed below are carried out in accordance with all applicable laws, plumbing rules, and building codes. Advertisement

Please keep in mind that the following procedure assumes that the system is being installed for the first time and not as a replacement.

  1. 1 Assemble the equipment and tools that will be used throughout the dig. You will require the following items:
  • Backhoe, laser transit, and grade pole are all included. A 4″ Sch. 40 PVC pipe (and fittings, if necessary)
  • A 4″ ASTM D2729 perforated pipe
  • A 4″ASTM D3034 pipe and fittings
  • A 4″ Sch. 40 vent cap and test cap
  • PVC primer and adhesive
  • A 4″ Sch. 40 vent cap and test cap The following tools will be required: Saw (either hand saw or cordless reciprocating saw)
  • Hammer drill and bits (for drilling through walls if necessary)
  • The following items are required: hydraulic cement (to seal surrounding pipe if pipe is going through wall)
  • Shovel
  • Stone measuring an inch and a half and cleaned (amount varies depending on system size)
  • Tape measurements (both ordinary and at least a 100-foot-long tape)
  • Septic fabric (cut to 3′ length or less from a roll)
  • Septic tank and risers (concrete or plastic if allowed)
  • Riser sealant such as Con-Seal (for concrete) or silicone caulk (for plastic)
  • A septic filter (such as a Zoeller 170 or similar) if one is necessary
  • A distribution box (either concrete or plastic, if more than two laterals are being run)
  • And a septic tank.
  • 2 Determine the location of the entrance to the building in relation to the location of the septic tank. Make an excavation at least 2 feet deep and drill a hole through the wall, or go deeper and drill a hole beneath the footing, depending on your preference or the need. Because this is precisely what a gravity-fed system is designed to accomplish, expect the flow to continue to flow downhill from here. When transferring waste from the tank to the drain field, it does not employ any mechanical methods other than gravity.
  • The pipe should be 4″ Sch. 40 and should extend at least five feet outside the structure toward the tank, either through the wall or beneath it. Set it level where it will pass through a wall or under a footing, and from there, run it with approximately 1/8″ of pitch (slope) every foot of length toward the septic tank until it reaches the tank. If necessary, go even farther into the tank or all the way into the tank. If this is the case, switch to 4″ 3034 with the appropriate adaptor and pipe 3034 toward the tank.
  • Make sure you use a test cap on the end that will be entering the building. It is recommended that if you are going through a wall, you seal the area around the hole with hydraulic cement both inside and outside
  • Do not run too much pitch out to the tank. If there is an excessive amount, the water will run away quicker than the sediments, resulting in the solids remaining in the pipe. Additionally, depending on the depth of your drain field and how close it will be to the tank’s outflow, there may not be enough pitch to get to the drain field.
  • 3 Dig a hole large enough to accommodate the installation of the concrete aerobic tank below ground. Make use of the laser transit to “shoot” the top of the pipe that leads out to the tank with the laser. The distance between the top of the intake and the bottom of the tank is measured in feet and inches. To the number you fired off the top of the pipe, add this (go up on the grade pole) + 1 1/2″ to get the total. The depth of the grade pole has now been adjusted to the desired depth. Using this, continue to drill the hole to the desired depth
  • Prepare your leech field by laying it out and excavating it according to the results of the test performed during the permit application procedure. Maintaining a good flow between the tank and the drain field should be considered when planning out and digging the tank.
  1. 4Use “inch-and-a-half cleaned drain rock” from a neighboring gravel dump to surround the pipe, which is required in most areas. This is necessary in order to keep the pipe stable. For further information on the size of embedment and gravel required, check with your local health department. Five-inch perforated pipe in a gravity drain field does not have a slope from one end to another and has capped ends
  2. Once you have received a green sticker from the health inspector, you must cover the pipe and tank. All places, subject to the restrictions of the local health authority, will be required to cover the drain rock with a specific filter fabric, newspaper, four inches of straw, or untreated construction paper before backfilling. Advertisement
  1. A pump chamber after the septic tank should be installed The pump chamber, also known as a pressure tank or dosing tank, is where the electric pump is housed, which is responsible for transporting wastewater from one location to another and finally into the drain field for final disposal.
  • Set up the pump chamber in the same manner as you would a septic tank. The effluent pump and floats are housed in the pump chamber, and they are responsible for pumping the effluent out to the drain field at predetermined or scheduled intervals. This is a hermetically sealed system. To ensure that the electrical installation complies with state standards, it is frequently necessary to hire a qualified electrician. It is important to remember that in places with high groundwater, the pump chamber or additional ATUs may remain essentially empty for long periods of time, and that these tanks may need to be safeguarded from floating by the installation of additional weight or other protective features.
  1. Secondly, all construction details, including the layout of all sewers outside of the home, the location and depth of all tanks, the routing and depth of pressurized effluent lines, and other system components, such as the drain field and any additional ATUs, must be consistent with the septic system plans approved by the local county health department. Cover the tank and pressurized lines once the inspector has given his final clearance and the system has been turned on. Advertisement
See also:  Septic Tank What You Need To Know? (Best solution)

Create a new question

  • Question I had a tank put, but it isn’t level with the ground. What will be the ramifications of this, and should it be leveled? It is necessary to keep the tank level. It is difficult to predict what it will have an impact on because we do not know which direction it is off level. Question Is it necessary to be concerned about tree roots growing into the drainage area when using a gravity flow kind of tank? Whether or whether you have lateral lines is dependent on the kind of trees that are growing close or above them. Tree species that tend to extend roots into the lateral lines and obstruct them are known as ramifications. Due to the fact that they are buried deep in the ground and surrounded by a pocket of gravel that allows waste water to drain out, they are rarely affected by grass, weeds, and shrubs. Question What is the maximum depth that a pipe may be lowered into the leech bed? The majority of systems require 12 volts “in the form of rock The perforated pipe should be suspended in the top area of the rock
  • It should not be touching the rock. Question Maintaining a lush green grass on or above your pitch is it safe, or is it a good practice? According to what I’ve heard, brown or dead grass is preferred so that your field can breathe more easily. It is necessary for your field to take a breath. The presence of green grass across your field indicates that it is functioning well. With lush grass covering your field, it will be able to breathe. There should be no planting of woody shrubs or trees over the leach field. Question What is the recommended distance between the septic tank and the house/boundary? A minimum of fifty feet is required. States have different laws, but this is the most common distance
  • Nonetheless, other states have stricter laws. Question What is the average amount of soil that goes into a residential leach field? It is dependent on how chilly it becomes. There are no less than 12 in the northern United States “in the leach field’s surface
  • Question Is it possible to build a septic system during the cold months? What you should do will depend on whether or not you reside in a place where the ground freezes. Question What amount of water should I put in the tank to get it going? None. A typical tank holds 1,000 gallons and will fill up quite quickly if used on a regular basis. When liquid effluent is discharged to the drain field, the goal is to catch and pre-treat particles that have accumulated. It is possible that a pump system will require water to prime the pump. Question There is a misalignment between my septic field’s underground line and the pipe on the tank. Is it OK to utilize a 90-degree elbow on my septic tank? As long as you have decent downhill flow, you should be fine. Instead of using a 90, I would use two 45s. Question If I’m installing a septic system, when should I contact an inspector? Immediately following system installation but before earth is used to cover the system in place Always check with the inspector ahead of time to verify that they can satisfy your inspection needs

More information on the replies Inquire about something There are 200 characters remaining. Include your email address so that you may be notified when this question has been resolved. SubmitAdvertisement

  • The use of aerobic bacterial additions (which are available at most DIY stores) to maintain a healthy and well functioning system, as suggested by producers on a periodic basis, is contentious. The septic tank is an anaerobic (wet) environment in which the majority of yeasts and other additions will have little or no effect on the sewage being processed. When it comes to installing septic tanks, some old school installers believe that placing an additive, a shovel of muck, or even a dead cat in an empty tank will “start” the process. What naturally enters the tank serves as the only thing that is necessary. The aerobic (wet or dry) component of the system consists of hundreds of square feet of drain field, where additives will do little help even if they make it all the way to the end of the system. The use of chemicals in septic systems has not been the subject of an independent research that has been published in a respectable scientific publication anywhere in the world, including this nation. This will mostly certainly be confirmed by your local health department. Each phase of the building process will almost certainly include an examination by a health inspector before the work can be completed or covered up. On pressurized lines, the use of a sand embedment is recommended in order to reduce the amount of damage caused by moving soil that has a high concentration of clay. When pumps are turned on and off, pressurized lines might move as well. Four inches (10.2 cm) of sand bedding on all four sides of the lines will prevent sharp pebbles from the ground or backfill from wearing holes in the pipe over time
  • And

Thank you for submitting a suggestion for consideration! Advertisement

  • Keep the perforated pipe for the leech field in a vertical position while installing it to avoid having the holes in the pipe turn downward. It is necessary to lay the perforated drain field pipe ASTM 2729 dead level, so that the printed line on the pipe is facing up. The perforations on both sides of the pipe are on both sides of the pipe. All of the sections of perforated pipe are cemented together, and the ends of each leach line are capped to complete the installation. So, when waste water enters the pipe, it will fill the pipe to the height of the perforations and overflow from ALL of the holes, utilising the whole leach field as a means of treatment. In certain health authorities, you can utilize waste water to water grass or decorative plants, trees, vegetable gardens, and fruit trees if you place the perforated pipe on a slope. However, the water must first be cleaned by the system (tertiary treatment includes disinfection) in order to prevent pathogens (germs) from the septic system from being discharged into the environment throughout the process. Make sure to check with your local health authority to verify if the practice known as “reuse” is permitted in your community.

Advertisement

Things You’ll Need

  • The following tools are required: backhoe tractor, trencher, shovel, contractor’s laser level and rod, or a surveyor’s transit. Septic tanks
  • PVC pipe with perforations
  • Material for embedding
  • PVC adhesive, PVC fittings, and a septic tank outlet filter are all included. Hand saw
  • Course file
  • Sandpaper If necessary, effluent pumps and floats are installed. If an alternate system is used, a control panel is installed.

About This Article

The writers of this page have together authored a page that has been read 499,072 times.

Did this article help you?

Underground wastewater treatment facilities, known as septic systems, are often employed in rural regions where there are no centralized sewage lines. They clean wastewater from residential plumbing, such as that produced by bathrooms, kitchen drains, and laundry, by combining natural processes with well-established technology. A conventional septic system is comprised of two components: a septic tank and a drainfield, often known as a soil absorption field. It is the septic tank’s job to decompose organic matter and to remove floatable stuff (such as oils and grease) and solids from wastewater.

Alternate treatment systems rely on pumps or gravity to assist septic tank effluent in trickling through a variety of media such as sand, organic matter (e.g., peat and sawdust), constructed wetlands, or other media to remove or neutralize pollutants such as pathogens that cause disease, nitrogen, phosphorus, and other contaminants.

Prior to discharging wastewater into the environment, several alternative systems are designed to evaporate or disinfect the effluent.

Specifically, this is how a typical conventional septic system works:

  1. All of the water that leaves your home drains down a single main drainage pipe and into a septic tank. An underground, water-tight container, often composed of concrete, fiberglass, or polyethylene, serves as a septic system’s holding tank. Its function is to retain wastewater for a long enough period of time to allow particles to sink to the bottom and form sludge, while oil and grease float to the surface and produce scum. Sludge and scum are prevented from exiting the tank and moving into the drainfield region by compartments and a T-shaped outlet. After that, the liquid wastewater (effluent) exits the tank and flows into the drainfield. The drainfield is a shallow, covered hole dug in unsaturated soil that serves as a drainage system. Porous surfaces are used to release pretreated wastewater because they allow the wastewater to pass through the soil and into the groundwater. In the process of percolating through the soil, wastewater is accepted, treated, and dispersed by the soil, finally discharging into groundwater. Finally, if the drainfield becomes overburdened with too much liquid, it can flood, causing sewage to flow to the ground surface or resulting in toilet backups and sink backups. Finally, wastewater percolates into the soil, where it is naturally removed of harmful coliform bacteria, viruses, and nutrients. Coliform bacteria are a kind of bacteria that may be found in the intestines of humans and other warm-blooded animals, with humans being the most common host. As a result of human fecal contamination, it is a sign of this.

The Guadalupe-Blanco River Authority has built an animated, interactive model of how a residential septic system works, which you can view here.

Do you have a septic system?

It’s possible that you’re already aware that you have a septic system. If you are not sure, here are some tell-tale symptoms that you most likely are:

  • If you have a septic system, you may already be aware of this fact. Here are some tell-tale indicators that you most likely do, if you don’t already know:

How to find your septic system

You can locate your septic system once you have confirmed that you have one by following these steps:

  • The following are some methods for determining whether or not your home has a septic system.

Failure symptoms: Mind the signs!

A bad odor is not necessarily the first indicator of a septic system that is failing to work properly. Any of the following signs should prompt you to seek expert assistance:

  • Water backing up into the drains of homes and businesses
  • It is especially noticeable in dry weather that the drainfield grass is bright green and spongy. The presence of standing water or muddy soil near your septic system or in your basement
  • A strong stench emanating from the area surrounding the septic tank and drainfield

How to Care for Your Septic System

Septic system maintenance is neither difficult or expensive, and it does not have to be done frequently. The maintenance of a vehicle is comprised of four major components:

  • Inspect and pump your drainfield on a regular basis
  • Conserve water
  • Dispose of waste properly
  • And keep your drainfield in good condition.

Inspect and Pump Frequently

Inspection of the ordinary residential septic system should be performed by a septic service specialist at least once every three years. Household septic tanks are normally pumped every three to five years, depending on how often they are used. Alternative systems that use electrical float switches, pumps, or mechanical components should be examined more frequently, typically once a year, to ensure that they are in proper working order. Because alternative systems contain mechanical components, it is essential to have a service contract.

  • The size of the household
  • The total amount of wastewater produced
  • The amount of solids present in wastewater
  • The size of the septic tank

Service provider coming? Here is what you need to know.

• The total amount of wastewater produced by a household The amount of solids in wastewater is measured in cubic meters. a measure of the size of the septic tank

See also:  How Locate Septic Tank? (Solution found)

Use Water Efficiently

In a normal single-family house, the average indoor water consumption is about 70 gallons per person, per day, on average. A single leaking or running toilet can waste as much as 200 gallons of water each day, depending on the situation. The septic system is responsible for disposing of all of the water that a residence sends down its pipes. The more water that is conserved in a household, the less water that enters the sewage system. A septic system that is operated efficiently will operate more efficiently and will have a lower chance of failure.

  • Toilets with a high level of efficiency. The usage of toilets accounts for 25 to 30% of total home water use. Many older homes have toilets with reservoirs that hold 3.5 to 5 gallons of water, but contemporary, high-efficiency toilets consume 1.6 gallons or less of water for each flush. Changing out your old toilets for high-efficiency versions is a simple approach to lessen the amount of household water that gets into your septic system. Aerators for faucets and high-efficiency showerheads are also available. Reduce water use and the volume of water entering your septic system by using faucet aerators, high-efficiency showerheads, and shower flow restriction devices. Machines for washing clothes. Water and energy are wasted when little loads of laundry are washed on the large-load cycle of your washing machine. By selecting the appropriate load size, you may limit the amount of water wasted. If you are unable to specify a load size, only complete loads of washing should be performed. Washing machine use should be spread throughout the week if at all possible. Doing all of your household laundry in one day may appear to be a time-saving strategy
  • Nevertheless, it can cause damage to your septic system by denying your septic tank adequate time to handle waste and may even cause your drainfield to overflow. Machines that have earned theENERGY STARlabel consume 35 percent less energy and 50 percent less water than ordinary ones, according to the Environmental Protection Agency. Other Energy Star appliances can save you a lot of money on your energy and water bills.

Properly Dispose of Waste

Everything that goes down your drains, whether it’s flushed down the toilet, ground up in the trash disposal, or poured down the sink, shower, or bath, ends up in your septic system, which is where it belongs. What you flush down the toilet has an impact on how effectively your septic system functions.

Toilets aren’t trash cans!

Your septic system is not a garbage disposal system. A simple rule of thumb is to never flush anything other than human waste and toilet paper down the toilet. Never flush a toilet:

  • Cooking grease or oil
  • Wipes that are not flushable, such as baby wipes or other wet wipes
  • Photographic solutions
  • Feminine hygiene items Condoms
  • Medical supplies such as dental floss and disposable diapers, cigarette butts and coffee grounds, cat litter and paper towels, pharmaceuticals, and household chemicals such as gasoline and oil, insecticides, antifreeze, and paint or paint thinners

Toilet Paper Needs to Be Flushed! Check out this video, which demonstrates why the only item you should flush down your toilet are toilet paper rolls.

Think at the sink!

Your septic system is made up of a collection of living organisms that digest and treat the waste generated by your household.

Pouring pollutants down your drain can kill these organisms and cause damage to your septic system as well as other things. Whether you’re at the kitchen sink, the bathtub, or the utility sink, remember the following:

  • If you have a clogged drain, avoid using chemical drain openers. To prevent this from happening, use hot water or a drain snake
  • Never dump cooking oil or grease down the sink or toilet. It is never a good idea to flush oil-based paints, solvents, or huge quantities of harmful cleansers down the toilet. Even latex paint waste should be kept to a bare minimum. Disposal of rubbish should be avoided or limited to a minimum. Fats, grease, and particles will be considerably reduced in your septic tank, reducing the likelihood of your drainfield being clogged.

Own a recreational vehicle (RV), boat or mobile home?

If you have ever spent any time in an RV or boat, you are undoubtedly familiar with the issue of aromas emanating from sewage holding tanks.

  • The National Small Flows Clearinghouse’s Septic System Care hotline, which may be reached toll-free at 800-624-8301, has a factsheet on safe wastewater disposal for RV, boat, and mobile home owners and operators.

Maintain Your Drainfield

It is critical that you maintain the integrity of your drainfield, which is a component of your septic system that filters impurities from the liquid that emerges from your septic tank once it has been installed. Here are some things you should do to keep it in good condition:

  • Parking: Do not park or drive on your drainfield at any time. Plan your tree plantings so that their roots do not grow into your drainfield or septic system. An experienced septic service provider can recommend the appropriate distance for your septic tank and surrounding landscaping, based on your specific situation. Locating Your Drainfield: Keep any roof drains, sump pumps, and other rainfall drainage systems away from the drainfield area. Excess water causes the wastewater treatment process to slow down or halt completely.

How to Install Drain Pipes for a Septic Tank Yourself

Home-Diy Installing a septic tank is often done by a professional who has access to the necessary equipment. A concrete septic tank can weigh several thousand pounds, and the ordinary homeowner does not have the necessary tools to safely install it in the ground. if (sources.length) then this.parentNode.removeChild(sources); else this.onerror = null; this.src = fallback; if (sources.length) then this.parentNode.removeChild(sources); else if (sources.length) then this.parentNode.removeChild(sources); else if (sources.length) then this.parentNode.remove ‘/public/images/logo-fallback.png’) is a fallback logo image.

A concrete septic tank can weigh several thousand pounds, and the ordinary homeowner does not have the necessary tools to safely install it in the ground.

  • The following items are required: Shovel (backhoe is recommended)
  • Tape measure
  • Gravel
  • Rake PVC perforated pipe
  • PVC pipe cleaner
  • PVC pipe cement PVC pipe cleaner
  • Geotextile material
  • Hacksaw

Warning

Large bushes or trees should not be planted directly over drain lines.

  1. Inspect your property and get a percolation test performed. In most cases, you will need a copy of the perc test results in order to acquire a permit to build a septic system in your home. In order to assess how quickly the soil absorbs water, a perc test will be performed on your site by a licensed specialist on your behalf. The results of this test will be used to calculate the quantity of drain line that will be required for your system. Drain lines should be measured and marked out before installation. You can divide this down into many lines, but each line must be the same length, and there must be a minimum of six feet between each line in order to be considered complete. Prior to digging, mark the beginning and ending locations of each line, double-checking all measurements to ensure they are accurate. Dig each drain line to a depth of 30 inches and a width of 24 inches. However, while a pick and shovel may be used to do the task, a backhoe can complete it in a fraction of the time and with less strain on your back. To make the trenches as flat as possible, remove any large boulders or roots that may have accumulated in them. Each of these lines will be served by a pipe that will go from the distribution box to it. This is the location where the pipe from the distribution box enters the ditch and marks the beginning point of your drain line. Fill each drain line with gravel until it reaches a depth of 12 inches. Spread gravel over the area to be covered with drain pipes and smooth it up with your rake. Install a 4 inch PVC perforated pipe on top of the gravel to provide drainage. This pipe will be connected to the pipe that comes from the distribution box and will run the whole length of the drain line to connect to the drain. Pipe cleaner should be used to clean each pipe junction before applying pipe cement. Before continuing, double-check that all of the fittings are in place. To finish covering the drain lines, continue to pour additional gravel into the system until the pipes are covered by roughly 1 to 2 inches of material. Using a rake, smooth out the gravel. A layer of geotextile material should be rolled out to cover the whole length and width of the drain line in order to prevent dirt from filtering into the drain lines and to aid in keeping roots out of the drainage system. The drain lines should be backfilled somewhat to allow for some small mounding to compensate for the settling that will occur. Grass seed should be planted on top of drain lines to aid in the absorption process and to avoid erosion.

The Drip Cap

  • Installing a septic tank is often done by a professional who has access to the necessary equipment. A concrete septic tank can weigh several thousand pounds, and the ordinary homeowner does not have the necessary tools to safely install it in the ground. Dig each drain line to a depth of 30 inches and a width of 24 inches. Ensure that any large rocks or roots are removed from the trenches, and that the foundation is as level as possible
  • Fill each drain line with gravel until it reaches a depth of 12 inches. In addition, this pipe will link to the pipe that comes from the distribution box and will run the whole length of the drain line.

What Are Leach Lines and When Should They Be Replaced?

If your house is equipped with an aseptic system, it will have leach lines or an aleach field. It is necessary to have leach lines as part of any onsite wastewater system since they are the final stage in a process that begins at your sink or toilet and finishes with the wastewater being disposed of in the ground. When the leach lines stop working, the entire system fails as a result. Knowing how to recognize failing or failed leach lines may assist you in catching the problem early and limiting the amount of money spent on replacement.

How a Septic System Works

In order to separate them from municipal or public waste systems, septic systems are also referred to as onsite wastewater management systems. The usage of the phrase “onsite” is important because a home’s septic system and a municipal system perform substantially the same functions. Both systems are designed to treat liquid waste or sewage (also known as effluent) and render it harmless by eliminating the pathogens that are present in it.

  1. It is through the sewer line that the greywater (water collected from sinks and showers, but not baths) as well as toilet liquid and solid waste leave the residence. It is the sewage line that transports the waste down to the septic tank. The trash begins its journey through the septic tank in the first compartment. Heavy waste items sink to the bottom of the tank, while lighter waste materials such as oils and greases float to the surface, forming a layer of scum. Effluent is sent to the rear compartment by baffles and screens. In order to sink into the earth, wastewater must first pass through an effluent filter and then via leach lines.

Tip

Millions of bacteria live in septic tanks and drains. The bacteria are responsible for the breakdown of waste in the systems. As a result, a septic system that is excessively clean will be unable to perform correctly. Even two liters of bleach are sufficient to prevent or significantly inhibit the bacteria’s ability to digest waste.

What Are Leach Lines?

Leach lines are referred to by a variety of names, including leach field, leach bed, filter bed, and percolation bed. After passing through the septic tank, leach lines are used to distribute septic effluent into the surrounding soil. Leach pipes are laid out across an open area, generally a backyard, in order to disperse the effluent across the greatest feasible area as quickly as possible. Following its exit from the septic tank, the effluent travels into the leach pipes, trickles out of pores in the pipes, then percolates downhill via gravel and sand, and finally into the surrounding soil.

PVC pipe with perforations is commonly used for leach pipelines. In order to encourage the final product to seep into the soil, the pipes are either bedded in gravel and sand or covered with plastic septic chambers, depending on the situation.

Signs of Failing or Failed Leach Lines

Sometimes it might be tough to figure out which element of a septic system has failed when one is experiencing problems. Any of the following symptoms can assist you in determining whether or not leach line failure is the source of the problem:

  • Identifying which element of a sewage system has broken when a septic system fails can be challenging. It is possible to detect leach line failure as the root cause by looking for any of the indications listed below.

Why Leach Lines Fail

It is theoretically possible to construct an intelligent self-contained system that returns water to the soil and disinfects it biologically. However, in practice, this is not the case. In actuality, because a septic system has so many moving components, anything may go wrong, and leach lines are frequently the cause of these mishaps. If the septic tank was not correctly handled, it is possible that an excessive amount of solid waste was permitted to flow into the leach lines, clogging holes in the pipe or the surrounding ground.

Even if there is no catastrophic occurrence, it is possible that your leach field has simply reached the end of its normal life cycle.

How to Replace Leach Lines

It is recommended that you hire a professional to handle the replacement of leach lines, as is the case with the majority of septic tank tasks and concerns.

  1. The present leach field must be completely demolished in order to prevent contamination. A large amount of heavy equipment is required for this phase since leach fields are widely distributed. A distribution box is put near the septic tank for the purpose of distributing waste. The wastewater from the septic tank is delivered to the distribution box by a single big pipe. The leach field is formed by lateral pipes that radiate outward in trenches from the distribution box. There are between four and nine lateral pipes in total. Because this is a gravity-based system, the lateral pipes must be installed on a downward slope to be effective. Plastic septic chambers are installed over the leach line pipes to collect the wastewater. The trenches are filled with at least 6 inches of earth, or to the depth specified in your location, depending on the conditions. For the time being, only some parts, such as the ends of the pipes and the distribution box, are visible. The local permitting agency conducts an inspection of the septic system. Following a successful inspection, the remaining trenches are filled up
  2. Otherwise, they are left unfilled.

Leave a Comment

Your email address will not be published. Required fields are marked *