  • Fill trenches with gravel so that the drain pipe (which is usually 4″ in diameter and perforated) has a 1/8″ per foot. The gravity will send the effluents (clean water) from the septic tank into the drain pipe and then into the gravel. Cover the drain pipe with a 4″ layer of gravel and make sure the surface is even.

How long are septic lateral lines?

A typical drainfield trench is 18 to 30 inches in depth, with a maximum soil cover over the disposal field of 36 inches.

When installing a drain line piping should be installed?

Install each pipe starting with the lower end of the line and run towards the high elevation. The bell end of each pipe section should be installed facing up the hills to reduce leakages. At the house ends’ use of at least two cleanouts for easier access of the pipe during cleaning with sewer auger or during scoping.

How deep is the main sewer line?

How Deep Is a Sewer Line? Sewer lines on private property can be as shallow as 18–30 inches deep or as much as 5–6 feet deep. In areas with cold climates, the pipe will be buried deeper to prevent freezing in the winter. Pipe depth is not always a matter of climate.

How do I find my septic tank outlet pipe?

The outlet pipe should be approximately 3 inches below the inlet pipe. Inlet Baffle: The inlet baffle is installed on the inlet pipe inside the tank.

Should you fill a new septic tank with water?

2 Answers. Yes the system should be filled with water and the installer should have done that. There is a good chance the tanks can float out of the hole if it rains heavy when they are first put in if you do not put water in them.

What size pipe goes into septic tank?

Four-inch pipe is standard, and it should extend far enough under the house to connect with the main soil stack, which is a 3-inch pipe that extends vertically past the main bathroom and through the roof.

Can you drive over lateral lines?

In sum, driving over the leach field in any vehicle larger than a child’s bicycle is a bad idea. Heavy vehicles may actually crush buried leach field lines, or they may compress the soils around the leach field, either of which leads to failure. Driving on or parking on leach fields will destroy them.

How deep should a septic tank be dug?

Septic tanks are typically rectangular in shape and measure approximately 5 feet by 8 feet. In most cases, septic tank components including the lid, are buried between 4 inches and 4 feet underground.

How big of a drain field do I need?

The size of the drainfield is based on the number of bedrooms and soil characteristics, and is given as square feet. For example, the minimum required for a three bedroom house with a mid range percolation rate of 25 minutes per inch is 750 square feet.

How to Install Drain Pipes for a Septic Tank Yourself

Home-Diy Installing a septic tank is often done by a professional who has access to the necessary equipment. A concrete septic tank can weigh several thousand pounds, and the ordinary homeowner does not have the necessary tools to safely install it in the ground. if (sources.length) then this.parentNode.removeChild(sources); else this.onerror = null; this.src = fallback; if (sources.length) then this.parentNode.removeChild(sources); else if (sources.length) then this.parentNode.removeChild(sources); else if (sources.length) then this.parentNode.remove ‘/public/images/logo-fallback.png’) is a fallback logo image.

A concrete septic tank can weigh several thousand pounds, and the ordinary homeowner does not have the necessary tools to safely install it in the ground.

  • The following items are required: Shovel (backhoe is recommended)
  • Tape measure
  • Gravel
  • Rake PVC perforated pipe
  • PVC pipe cleaner
  • PVC pipe cement PVC pipe cleaner
  • Geotextile material
  • Hacksaw

Warning

Large bushes or trees should not be planted directly over drain lines.

  1. Inspect your property and get a percolation test performed. In most cases, you will need a copy of the perc test results in order to acquire a permit to build a septic system in your home. In order to assess how quickly the soil absorbs water, a perc test will be performed on your site by a licensed specialist on your behalf. The results of this test will be used to calculate the quantity of drain line that will be required for your system. Drain lines should be measured and marked out before installation. You can divide this down into many lines, but each line must be the same length, and there must be a minimum of six feet between each line in order to be considered complete. Prior to digging, mark the beginning and ending locations of each line, double-checking all measurements to ensure they are accurate. Dig each drain line to a depth of 30 inches and a width of 24 inches. However, while a pick and shovel may be used to do the task, a backhoe can complete it in a fraction of the time and with less strain on your back. To make the trenches as flat as possible, remove any large boulders or roots that may have accumulated in them. Each of these lines will be served by a pipe that will go from the distribution box to it. This is the location where the pipe from the distribution box enters the ditch and marks the beginning point of your drain line. Fill each drain line with gravel until it reaches a depth of 12 inches. Spread gravel over the area to be covered with drain pipes and smooth it up with your rake. Install a 4 inch PVC perforated pipe on top of the gravel to provide drainage. This pipe will be connected to the pipe that comes from the distribution box and will run the whole length of the drain line to connect to the drain. Pipe cleaner should be used to clean each pipe junction before applying pipe cement. Before continuing, double-check that all of the fittings are in place. To finish covering the drain lines, continue to pour additional gravel into the system until the pipes are covered by roughly 1 to 2 inches of material. Using a rake, smooth out the gravel. A layer of geotextile material should be rolled out to cover the whole length and width of the drain line in order to prevent dirt from filtering into the drain lines and to aid in keeping roots out of the drainage system. The drain lines should be backfilled somewhat to allow for some small mounding to compensate for the settling that will occur. Grass seed should be planted on top of drain lines to aid in the absorption process and to avoid erosion.

The Drip Cap

  • Installing a septic tank is often done by a professional who has access to the necessary equipment. A concrete septic tank can weigh several thousand pounds, and the ordinary homeowner does not have the necessary tools to safely install it in the ground. Dig each drain line to a depth of 30 inches and a width of 24 inches. Ensure that any large rocks or roots are removed from the trenches, and that the foundation is as level as possible
  • Fill each drain line with gravel until it reaches a depth of 12 inches. In addition, this pipe will link to the pipe that comes from the distribution box and will run the whole length of the drain line.

placing the septic or sewer pipe in the trench

  • In this section, you may ask questions or express your opinions regarding trenching for Septic or Sewer Pipes.

In this section, you may ask questions or express your opinions regarding trenching for Septic or Sewer lines.

Guide to installing the replacement sewer pipe line

This article on sewage line replacement discusses how to install the new sewer pipe and link it to the existing system.

  • Precautions should be taken during the excavation of sewage lines or septic lines. The maximum permitted slope for sewer or septic line pipe is recommended. Specifications for sewer or septic line trenches include homogeneity, soil compaction, and breadth. specifications for installing sewer or septic pipe into the trenches that have been excavated Size (diameter) and slope of the sewage line that should be used
  • Avoiding rocks and voids, using sand, and shielding the new septic or sewage system from damage are all important considerations.

Safety of occupants and neighbors during excavation for sewer line repairs

The protection of workers when digging a sewage line or a septic line Allowable slope for sewage or septic line piping as recommended by the manufacturer. uniformity, soil compaction, and width requirements for sewer or septic line trenches specifications for installing sewer or septic pipe in the trenches that have been excavated Size (diameter) and slope of sewage line recommended; Stay away from rocks and voids, and fill up any gaps with sand or gravel to prevent damage to the new septic or sewage line.

Safety during sewer line trench excavation

In addition, when excavators were required to leave the site between project phases, the site was marked off with yellow danger tape connected to sticks during the excavation process. People who are at risk of falling into a ditch are also warned in this way, albeit in an amateurish manner. Do not leave any site excavations open and unattended; the dangers include harm as a result of someone falling in, as well as the possibility of pipe freezing in colder climes.

What is the proper slope for sewer lines between house and septic tank or sewer main?

It is preferable for sewage line trenches to have a constant slope, with a grade ranging between 2 percent and 10 percent grade – that is, the sewer line slope can drop anywhere between two and ten feet every hundred feet of run – rather than a steep slope. You can see that the slope of the sewer line down this hillside is far too steep. A problem (which is less prevalent in plastic pvc pipes than in cast iron pipes) is that the water and particles in the sewage do not remain together, resulting in solids remaining in the piping and clogging it.

In addition, the wastewater running into the septic tank at the foot of the slope is moving at a breakneck pace, making the quality of the septic tank intake baffle even more critical.

Sewer Line Trench Details: uniformity, soil compaction

Ideally, the sewage line trench bottom should be appropriately and consistently sloped and compacted in order to prevent sewer line pipes from drooping or breaking, clogging, or piping failure. A virgin soil layer should be present at the bottom of the sewage line trench – it should not have been over-excavated. However, because trenching is a sloppy craft, certain trench portions may be irregular and deeper in some places than others. To minimize future sags, it is necessary to compress the dirt used as fill beneath the sewer piping in this situation.

In addition, if trenches are not dug below the frost line, wastewater resting in a low pipe sag in a cold region may freeze, causing the system to become completely inoperable.

Installing the replacement sewer line

In most jurisdictions (with the exception of Alaska), the minimum diameter sewage line piping authorized is four inches in diameter. Clogging is more likely to occur in smaller lines. We’re talking about gravity-flow sewage lines in this context. Typically, sewerage is transported by a pumped or forced sewer main after having passed through an impervious surface, which allows for smaller diameter pipework to be used in residential applications. Sections of the new drain were put down the trench for installation, trimmed to length at each end, and then linked together with the existing drain system.

We connected the new drain line to the existing stub of cast iron sewage pipe that was located outside the house foundation wall at the home end that was higher up the hill.

The rubber connection that was used to connect the two drains developed a leak and had to be replaced, therefore it was necessary to reconnect them.

An askewpipe connection has a higher chance of leaking.

Question:

In most jurisdictions (with the exception of Alaska), the minimum diameter sewage line piping authorized is four inches in size. Clogging is more common in smaller lines. We’re talking about gravity-flow sewage pipes in this context, so bear with us. Typically, sewerage is transported by a pumped or forced sewer main after having passed through an impervious surface, which allows for lower diameter pipework to be utilized in residential applications. To prepare for installation, sections of the new drain were put down the trench, trimmed to length at either end, and then joined together.

We connected the new drain line to an existing stub of cast iron sewage pipe that was located outside the house foundation wall at the home end that was higher up the hill.

This occurred because the rubber connection that was used to connect the two drains began to leak and needed to be replaced.

Leakage is more likely to occur when a pipe connection is crooked. As well as clogged drains, see SEPTIC BACKUP AND SYSTEM FAILURE DIAGNOSIS AND REPAIR for diagnosing septic system issues vs obstructed drains.

Reply:

4 inches is the smallest diameter sewage line piping that is permitted in most jurisdictions (including Alaska). Smaller lines are more susceptible to blockage. Here, we’re talking about gravity-flow sewage pipes. A pumped or forced sewer main is typically used to transport sewage that has already been processed by a grinder pump; as a result, lower diameter pipe may be used in residential applications. To prepare for installation, sections of the new drain were put down the trench, trimmed to length at either end, and then linked together.

We connected the new drain line to the old stub of cast iron sewage pipe that was outside the home foundation wall at the house end that was higher up the hill.

The rubber connection that was utilized to connect the two drains developed a leak and needed to be replaced.

An askewpipe connection has a higher likelihood of leaking.

Question:

The smallest diameter sewage line piping permitted in most jurisdictions (including Alaska) is four inches in diameter. Smaller lines are more prone to clogging. We’re talking about gravity-flow sewage pipes here. A pumped or forced sewer main is typically used to transport sewage that has already been processed by a grinder pump; as a consequence, in residential applications, lower diameter pipe may be permitted. Sections of the new drain were put down the trench for installation, trimmed to length at each end, and then linked together.

We connected the new drain line to the old stub of cast iron sewage pipe outside the home foundation wall at the house end that was higher up the hill.

The rubber connection that was utilized to connect the two drains developed a leak and had to be replaced.

An askewpipe connection has a greater chance of leaking.

Question: connecting the new sewer line to a septic tank that was connected to terra-cotta piping

29th of March, 2015 joh hymanexplained: The terra cotta pipe that goes into the septic tank is 4 inches in diameter; how do you get it out of the tank?

Is it possible to reduce the pipe size to three inches at the point where it enters the tank?

Reply:

Joh There is a good chance that an ancient portion of terra-cotta sewage line that enters the septic tank has been sealed with concrete. Terracotta, on the other hand, is fairly soft. You’ll need to take the following steps to get started: 1. After you have dug the tank to the point where you have enough working space, and ALWAYS WORKING ALONE since falling into a septic tank is typically fatal, you will chip off the old terra-cotta line using a hammer and a mason’s chisel. Of course, you should use goggles and other safety gear.

See also:  What Is Used To Pump Septic Tank? (Solved)

you will need to install a baffle or pipe tee in the tank (from the inside walll of the tank) (DO NOT ENTER A SEPTIC TANK OR LEAN OVER IT AS THIS CAN BE FATAL) The tank tee may protrude through the opened wall of the septic tank to provide a 3.

Question: find the sepic tank cleanout port

Asked by Anonymous: How do you locate the inspection holes in order to get the tank pumped?

Reply:

Beginning with SEPTIC TANK, HOW TO FIND THEM, we will explain how to locate the septic tank in an ongoing series of articles. At that point, you just lift it up to reveal the cleanout port(s) in the tank’s top, and you’re done. If the tank is deep, discuss with your septic contractor the possibility of installing septic tank risers before re-burying it again to make the next cleanup simpler. Reading at BED the SEWER LINE in SAND Alternatively, choose a topic from the closely related articles listed below, or browse the entireARTICLE INDEX.

Article Series

  • DESCRIBE HOW TO DIAGNOSE A BLOCKED DRAIN
  • WHEN TO CALL A PLUMBER
  • DISCOVER THE MAIN BUILDING DRAIN
  • HOW TO USE A POWER SNAKE TO CLEAR A BLOCKED DRAIN
  • WHEN NOT TO CALL A PLUMBER MAKE OTHER SEPTIC REPAIRS AND DETERMINE THE DISTANCE TO DRAIN BLOCKAGE
  • DETERMINE THE NECESSITY OF DRAIN LIP REPLACEMENT
  • REPLACE THE SEWER LINE, STEP BY STEP
  • THE INSTALLATION OF A NEW SEWER LINE
  • BEDDING THE SEWER LINE WITH SAND
  • TRENCH FOR THE FINAL BACKFILL SEWER LINE
  • LOCATION OF DOCUMENT BURIED COMPONENTS
  • FINAL SEEDING AND RESTORATION
  • SEWER / SEPTIC LINES ON STEEP SITES

Suggested citation for this web page

At Inspect A pedia.com, an online encyclopedia of building environmental inspection, testing, diagnosis, repair, and issue preventive guidance is available: INSTALLING THE NEW SEWER LINE Alternatively, have a look at this.

INDEX to RELATED ARTICLES:ARTICLE INDEX to DRAIN SEPTIC SEWER PIPES

Alternatives include asking a question or searching InspectApedia using the SEARCH BOXfound below.

Ask a Question or Search InspectApedia

We encourage you to use the search box just below, or if you prefer, you may make a question or remark in theCommentsbox below and we will get back to you as soon as possible. InspectApedia is a website that allows you to search for things. Please keep in mind that the publication of your remark below may be delayed if it contains an image, a web link, or text that seems to the program to be a web link. Your submission will appear when it has been reviewed by a moderator. We sincerely apologize for the inconvenience.

Technical ReviewersReferences

Please use the search box just below, or, if you prefer, you may make a question or remark in theCommentsbox below and we will react as soon as we can. Thanks for visiting! InspectApedia is a website that allows you to search for information.

Please keep in mind that the publication of your Comment below may be delayed if it contains an image, a web link, or text that seems to the program to be a web link. Your posting will appear when it has been reviewed by a moderator. Excuse the delay in getting back to you!

How to Tie Into an Existing Septic Tank

Adding more input lines to your current septic tank is a viable option if your tank is working properly and is much below its maximum capacity for consumption. If you want to do this, you will need to integrate the new addition into the old system without causing any disruptions or changes to the existing system. The difficulty of this work will be greatly influenced by the location of the new addition as well as the technique of installation employed for your existing systems.

Step 1

Determine the location of the drain pipe that runs from the present residence to the septic tank. This may be accomplished by locating the main drain line beneath your property and recording the locations where it passes beneath or through the foundation. Move along this line outside the house until you are roughly eight feet away from the house, then turn around. Continue digging until you reach the drain line. There should be no more than 24 inches in depth below the surface of the ground for the line, which should be a 4-inch pipe.

Step 2

You should dig until you have exposed roughly three feet of the drainpipe once you have found it and marked it with chalk. In addition, you will need to dig down a little bit to provide access all the way around the pipeline. To get to the start point of the new field line, dig a ditch from this point onward. This ditch should be constructed in a straight line and at a small gradient from the current drain to the starting point of the new drain system. Remove any big boulders or roots that may have accumulated in this ditch.

Step 3

Digging should continue until you have uncovered around three feet of the drainpipe after you have located it. To gain access all the way around the pipe, you will also need to dig a little hole a little deeper. To get to the starting point of the new field line, dig a ditch from this point onward. In order for the new drain to be effective, it must follow a direct path and be slightly inclined in relation to the previous drain. Ensure that this ditch is completely free of huge rocks and roots.

Step 4

Insert the tee fitting into the hole that you just made in the wall with your fingers. Because the drainpipe and fitting will be a very tight fit, you will need to flex the drainpipe and wedge the fitting into position. Before installing the fitting, thoroughly clean the fitting and pipe ends. You will need to move rapidly once the cement has been applied in order to get the fitting in place since the cement will harden very quickly. Make the necessary adjustments to the fitting so that the new intake is directly in line with the new pipe.

Check that all of the fittings are in place before back-filling all of the ditches.

How to Run a Septic Tank Line From Your House

A septic system is made up of two lengths of pipe that are connected together. Initially, it runs from the house, where the system services are located, to a tank, where the waste is separated and solids settle out. The second section runs from the tank to the drainage field, where fluids from the tank are dispersed into the earth underneath the tank.

The process of installing the first run of pipe is quite similar to that of installing a traditional sewage line. It is necessary to maintain a downhill slope to the storage tank.

Locating the Septic Tank

The tank serves as the nerve center of the septic system. It is required to be situated between the residence and the drainage field. Each and every septic installation must begin with a soil test, and depending on the results, soil conditions may necessitate the placement of the tank in a less-than-ideal site for digging sewer lines. Also required are minimum setback distances from property borders, functioning wells, surface water and other obstructions to provide a safe working environment.

Tank Depth

A standard septic tank has a 4-inch intake at the top, which is positioned towards the bottom. Ideally, a 1/4-inch-per-foot slope toward the pipe from the house should be maintained by the pipe connecting to it. To put it another way, for every 10 feet of distance between a tank and a home, the inlet must be 2 1/2 inches lower than where the pipe departs the house at its lowest point. The pipe usually exits at ground level, although it may need to pass beneath a foundation footing or concrete pad in rare cases.

Digging the Trench

The trench for the septic pipe should be dug before the hole for the tank since you will need a backhoe to complete the work and the tank will get in your way if it is already in the ground. To allow rainfall to drain properly, the pipe should be placed on a 2- or 3-inch bed of drain rock, so remember to account for this extra depth when digging. It is normal to use a four-inch pipe, and it should be installed far enough down to link with the main soil stack, which is a three-inch pipe that runs vertically past the main bathroom and through the roof of the home.

Precautions

Since you’ll need a backhoe for the task and the tank will get in the way of your work if it’s already in the ground, it’s usually best to build the trench for the septic line before digging a hole for it. Take into consideration that the pipe should be placed on a 2- or 3-inch layer of drain rock in order to allow rainfall to drain properly. It is typical to use a four-inch pipe, and it should be installed far enough underground to link with the main soil stack, which is a three-inch pipe that runs vertically past the main bathroom and through the roof of your home.

How to Install a Perforated Sewer Drain Pipe

The trench for the septic pipe should be dug before the hole for the tank since you’ll need a backhoe for the work and the tank will get in your way if it’s already in the ground. In order for rainfall to drain properly, the pipe should be placed on a 2- or 3-inch bed of drain rock, so remember to account for this extra depth when digging.

Four-inch pipe is common, and it should reach far enough beneath the house to connect with the main soil stack, which is a 3-inch pipe that goes vertically beyond the main bathroom and through the roof.

  1. Excavate the dirt in trenches of the depth, breadth, and design specified on your approved plan, then fill up the trenches with water. Every plan is tailored to the exact land on which it will be installed and is dependent on factors like as the size, shape, natural slope, and soil composition of the site, as well as the rate at which water percolates through the soil and the size of the residence that the system will serve. To ensure that wastewater is distributed uniformly throughout the system, the trenches’ floors should be as level as possible when they are constructed. For this work, a backhoe or equivalent excavating equipment should be used. Fill the trench with 6 to 12 inches of gravel to prevent it from collapsing. Select gravel that has a bigger diameter than the holes in the perforated pipe to avoid clogging the perforations. There may be special requirements set forth by your municipality regarding the type of gravel that must be used and the depth of gravel on which the perforated pipe must rest. Lay down the perforated pipe pieces on top of the gravel, with the bulk of the holes pointing downward, and glue them together with PVC self-priming adhesive to secure them in place. The pipe sections are constructed with coupling flanges on one end of each pipe, allowing the next pipe in line to move inside the pipe that came before it in the assembly. Using PVC glue, apply it to the inside of the female flange and the outside of the male end and slide them together quickly, before the glue has a time to dry
  2. Make sure that all of the perforation holes are pointing in the same direction throughout. Pipe terminal ends should be protected with PVC covers that have been glued on. There are not always terminal ends on the pipes in leach field plans
  3. Place a level on the long runs of PVC and adjust the levelness of the pipe by wriggling and pushing high parts against the gravel until the bubble is in the middle of the glass on the level
  4. Repeat for the other long lines. It is possible to place gravel under sections of pipe that are too low. Additionally, you may use a transit level or laser level to position your pipes, and some towns even demand you to do so. Glue the perforated pipe’s entering ends into the couplings on the nonperforated PVC pipe that comes out of the system distribution box, making sure the pipe is completely sealed. In order for wastewater to be distributed uniformly into various lengths of perforated pipe, a distribution box must be installed. Place roughly 6 inches of gravel over the pipe, taking care not to damage the pipe’s original location during the process. Before you do this, you may be required to undergo an inspection by your local government. In order to prevent dirt from entering the gravel, cover it with a single layer of geo-textile fabric. Then, backfill the trench with soil to the desired depth.

Things You Will Need

  • Excavate the dirt in trenches that are the depth, breadth, and configuration specified on your approved plan, then fill up the trenches with water. Every plan is tailored to the specific property on which it will be installed and is dependent on factors such as the size, shape, natural slope, and soil composition of the property, as well as the rate at which water percolates through the soil and the size of the home that the system is intended to service. To ensure that wastewater is distributed uniformly throughout the system, the trenches’ floors should be as level as possible when they are built. For this task, a backhoe or other excavating equipment should be utilized. Fill the bottom of the trench with 6 to 12 inches of gravel. Select gravel that has a bigger diameter than the holes in the perforated pipe to avoid clogging the perforations. Depending on your municipality, you may be required to use a certain type of gravel and to use a specific depth of gravel to support the perforated pipe. Assemble the perforated pipe pieces on top of the gravel, making sure that the bulk of the holes are pointing downward, then bind them together with PVC self-priming adhesive. Coupling flanges are installed on one end of each pipe segment, allowing the following pipe in line to move inside of its predecessor, as seen in the image below: Using PVC glue, apply it to the inside of the female flange and the outside of the male end and slide them together quickly, before the glue has a time to dry. Check that all of the perforation holes are pointing in the same direction. Glue PVC caps on the ends of any pipes that have terminals that need to be protected. There are not always terminal ends on the pipes in leach field designs
  • Place a level on the long runs of PVC and adjust the levelness of the pipe by wriggling and pushing high parts against the gravel until the bubble is in the middle of the glass on the level
  • Repeat for the other long lines. When pipe is too low, gravel can be used to fill up the gaps. Another option is properly position your pipes using a transit level or a laser level
  • In fact, some towns may compel you to do so. The perforated pipe’s entering ends should be glued together with the couplings on the nonperforated PVC pipe that is going out of the system distribution box, if applicable. In order for wastewater to be distributed uniformly into various lengths of perforated pipe, a distribution box must be used. Place roughly 6 inches of gravel over the pipe, taking care not to damage the pipe’s original positioning as much as possible. Your local government may mandate that you get this done first. In order to prevent dirt from penetrating the gravel, cover the gravel with a single layer of geo-textile fabric, and then backfill the trench with soil to the desired depth.
See also:  Septic Tank Cause What Kind Of Gas? (Perfect answer)

Warning

  1. Avoid deviating from the plan that has been accepted by your permitting authority. If you do not adhere to the plan during the installation process, the county or city will not accept the finished product and may even order you to knock it down and start again. Planting trees or other plants with invasive roots on or near your drain field is not recommended. A tree’s roots can grow through perforated piping and follow it all the way up to your septic tank, causing the entire system to fail.

How to Install a Septic Tank with Drain Line

It is discussed in this article how to set up a septic tank with a drain line. A three-compartment septic tank is covered in detail in this project, which includes all of the processes required to complete the installation. This septic tank has adequate capacity to accommodate 4-6 people, making it an excellent choice for most households. Even if the installation is straightforward, you will need to rent a mini-excavator or, ideally, a backhoe digger to do the job properly. It is important to exercise caution when using detergents, disinfectants, or other acid cleansers since they will interfere with the operation of the bacteria that decompose the waste materials.

A simple explanation for how the system works is that the majority of the trash is transformed into sewage water.

Every two years, you will be required to remove the solids from the system.

The water will then be able to seep into the soil through the gravel layer.

Made from this plan

The construction of the sewage lines from the home to the site of the septic tank is the first step in the project’s development. Excavate the trenches such that the pipes have a 1/8 inch dip each foot of excavation. The pipes must be placed on a bed of sand and then completely covered with sand. The sand will protect the pipes, and it will also serve as an excellent marker for future operations, should it be necessary to dig further trenches. Decide on the position of the septic tank and mark the area with a marker.

  • Furthermore, the depth of the hole will be decided by the size and placement of the septic tank as well as the location of the sewage line.
  • We also employed a dumper truck to remove the soil from the site.
  • Make certain that the sewer pipe has a 1.5 percent slope when it is installed.
  • We relocated the septic tank with the help of a backhoe digger after securing it with a heavy-duty strap and moving it.
  • Check to verify that the septic tank intake is compatible with the sewer pipe.
  • We used a spirit level to ensure that the tank was upright during the installation.
  • Sand should be poured around the tank.

If you do not fill the tank with water, it will collapse due to the weight of the earth on top of the container.

We will not be constructing a drain field for this project, but rather an 80-foot-long trench.

You may either construct two 40-foot-long trenches or a wide surface area and install three 25-foot-long drain pipes on it.

We connected the header pipe to the septic tank, ensuring that it had a 2 percent slope to prevent backflow.

Because it will move quite swiftly, using a backhoe digger is highly recommendable.

Trenches should be filled with gravel to the point where the drain pipe (which is normally 4′′ in diameter and perforated) has a 1/8′′ per foot slope.

Using a 4′′ layer of gravel, cover the drain pipe and make sure the surface is level.

Geothextile cloth should be used to cover the trench.

Because the fabric prevents the pebbles from becoming mixed with the soil and clogging the drain pipe, it is effective.

At the end of the drain pipe, you must add a vent pipe to provide for proper ventilation.

This also allows for simple access to the drain pipe in the event that it has to be cleaned.

We moved the earth that we had dug back into the trenches with the use of the backhoe’s front loader bucket and a rake.

First and foremost, you must connect the riser to the septic tank.

In order to have easy access to the tank for maintenance and inspection, the top of the riser should be slightly above the level of the surrounding ground.

These sheets are thin and rather stiff, despite their small weight.

As a result, you must first cover the tank with these sheets, followed by a 4′′ layer of dirt on top of that.

The polystyrene sheets must be covered with dirt once they have been laid out on the ground.

Work carefully so that you do not harm the tank.

On the blog, you can also get a comprehensive guide on how to construct a concrete pump house.

Make sure to read the previous articles in the Brick House Construction Series to see what more is in store for you!

We appreciate you taking the time to read our article on how to construct a septic tank with drain line, and we encourage you to go through the rest of our projects. Please spread the word about our articles to your friends by using the social media sharing buttons.

Related Posts

Your bathroom drains may be running slowly, and you may be thinking pouring some chemical drain cleaner down the drain to clear the clog. However, in these situations, rather than relying on potentially harmful drugs, it is always preferable to consult with medical specialists for a diagnosis. Instead of a simple clogged drain, you may be dealing with a plumbing vent problem, a sewer line problem, or a septic system problem instead. Learn about three septic issues that might manifest themselves in ways that are similar to drain obstructions.

  • An entrance baffle and an output baffle are standard features of a septic tank.
  • The intake baffle assists in the smooth entry of wastewater into the tank.
  • This form of obstruction, like a drain clog, will cause drains to slow down or stop completely.
  • 2.
  • In addition, there is the pipe that runs from your house to the septic system.
  • In addition to blockages, this main line is subject to earthquake damage, damage from huge machinery being driven over the region, and tree root damage, no matter what material it is constructed of.
  • Failure of the Drainfield It is possible that some homeowners are unaware that septic systems have a limited lifespan.

For this reason, you must have a reserve leach field site set aside when installing your sewer system, as mandated by federal laws.

One occurs when a large amount of solid waste is introduced into your system, causing them to get clogged to the point where they must be replaced.

Compaction is another issue that can cause a leach field to fail prematurely if it is not addressed.

Due to the fact that the field’s functioning is dependent in part on bacteria that require air in the soil to survive, this might render the region unusable.

Some of the symptoms of these three septic illnesses might be mistaken for those of a normal plugged drain in some cases.

Consequently, if you feel your drains are slowing down, get a professional to come out and take care of the problem.

Contact Upstate Septic Tank, LLC as soon as possible if you are in need of a diagnostic visit, sewer line cleaning, or a septic system cleaning and pumping. We’ll be pleased to assist you in keeping your septic system in the best possible condition.

Sewer Line Repair and Replacement

As a homeowner, dealing with a sewer line blockage or leak may be a difficult experience. In addition to the unpleasant smell and sloppy cleanup that can result from a clogged sewer line, it can be difficult to identify the source of your sewage problem and resolve it. Know what the major sources of sewage line damage are in order to help prevent damage or minimize an issue when it does occur in order to help avoid or mitigate an issue when it does occur. Find out what causes a broken sewage line, what indications to watch for, and what you can do to repair or replace your sewer system in this article.

Causes of Sewer Line Damage

Here are a few of the most common causes of sewage line damage, ranging from blocked pipes to regular wear and tear.

Tree Roots

The growth of tree roots is one of the most prevalent causes of sewage line damage. The roots of a tree grow towards the direction of the source of water. Because sewage lines transport liquid waste, roots are naturally drawn to the source—particularly if there is already a tiny breach in the piping—and can cause significant damage. As soon as tree roots come into touch with a sewage pipe, they begin to wrap around and break through the pipe’s structure, obstructing, weakening, and even destroying the pipe’s structure.

Corroded Pipes

Despite the fact that steel and cast iron pipes are galvanized to avoid rusting, these pipes are at a significant risk of corroding as a result of calcium and magnesium buildup from normal wear and use. If corrosion is allowed to progress unchecked, it can make the pipe vulnerable to leaks and cracking.

Clogged Pipes Due to Debris and Foreign Objects

Human feces and toilet paper are the only things that your home’s sewage systems are capable of handling. If possible, avoid dumping waste such as wrappers and paper towels down the toilet since they are unable to completely decompose and can develop clogs that drain cleaning products cannot clear. Cooking oil and grease may also block pipes in the kitchen if they are spilled down the drain or into the sink. Pour these liquids into a container and allow them to cool before disposing of them in a trash bin.

Extreme Temperatures

When temperatures are extremely high or low, frozen pipes can burst as a result of the growing ice. But it is not only cold weather that may cause pipes to break; although improbable, excessive heat can also cause pipes to burst in some cases.

Signs of Sewer Line Damage

Frozen pipes can burst as a result of the growing ice when temperatures are extremely high or low. While extreme cold weather can cause pipes to break, it is also possible for pipes to burst under excessive heat, but this is less frequent.

Flooded or Foul-Smelling Yard

The presence of standing water in your yard might indicate that your sewage line has burst. Sewer lines can be buried anywhere from a few feet to six feet below the surface of the earth, with deeper pipes required in colder regions.

The water from a broken pipe can soon pool in sewage lines that are near to the surface and become visible on the surface. Because sewage gas may infiltrate through your yard’s soil, you may be able to detect the presence of sewage before it manifests itself.

Draining Difficulties

While some blockages are caused by a pipe that runs straight from a faucet or shower, a blockage in the main sewage line can be detected if many draining sites in the home are clogged at the same time, as is the case with a clogged toilet. When air is forced back up the tube, weird gurgling sounds can be heard in the toilet, which can be a warning sign of a major blockage.

Water Damage in the Home

If a drain pipe in your home leaks or breaks, it can cause significant water damage. Mold growing on the floors or walls is one of the first symptoms of a problem. This might be indicative of a clogged sewage line within the home, in which case you should contact a plumbing company immediately for assistance. Adobe Licensed (Adobe Licensed)

Sewer Line Repair and Replacement

There are two alternatives available to you if your sewage line develops a leak or breaks and has to be repaired: Trace the sewer pipe’s perimeter with a shovel, or choose for trenchless sewer line repairs. Trenchless sewage repair saves time and money by needing little to no digging. It is also environmentally friendly. Technicians utilize a video camera to enter the sewage pipe and provide recommendations for repairs to get the procedure underway. Then, one of two types of plumbing repairs is typically suggested: When there is just little damage to your sewage pipe, you can utilize pipe lining to put an inflated tube coated with epoxy into your sewer line.

  • It cures and hardens as it is in contact with the existing sewage line, allowing the leak to be sealed permanently.
  • The second method, pipe bursting, is used when a sewage line has been damaged beyond repair using the pipe lining approach.
  • Technicians put a cone-shaped bit through your current line, destroying the pipe and replacing it with a new one as soon as the old one is destroyed.
  • Depending on the extent of the damage to your pipes, you may be forced to use typical sewage line replacement procedures.
  • Excavation, on the other hand, may be required if the sewage system in your home has sustained significant damage.

How to Protect Your Sewer Lines

Despite the fact that not all sewer line damage is avoidable, there are three actions you can take to ensure the health of your sewage system. 1. Schedule sewer line inspections once a year—To ensure that your sewage system is in proper operating order, engage a professional to do an examination once a year at the least. Camera inspection is available from certain plumbing firms, which allows them to look inside your sewage line for corrosion or clogs. This service is charged separately. 2 — Removing trees that are harming the sewage line is still recommended, even if a root invasion in your sewer line is generally caused by an already-existing break or leak in the pipe, in order to prevent the problem from reoccurring in the future.

3. Make correct use of your sewage system—Keep in mind that only human waste and toilet paper should be disposed of in the sewer pipes; any other items that enter the system might cause clogs.

Sewer Line Repair FAQ

The material of your sewage line has an impact on the length of time it will last. Cast iron pipes have a lifespan of 75–100 years, clay and cement pipes can last up to 100 years, orangeburg pipes have a lifespan of 50–100 years, and PVC pipes have a lifespan of more than a hundred years.

Does homeowners insurance cover sewer line damage?

Unless your sewage line was damaged by another party, it is doubtful that your homeowner’s insurance will pay the costs of the repair or replacement. Fortunately, many home warranty providers offer the option of include septic system coverage in your policy, which can safeguard your sewage lines.

How long does trenchless sewer line repair last?

It’s doubtful that your homeowner’s insurance will pay the costs of repairs unless your sewage line was damaged by someone else. In most cases, septic system coverage is available from home warranty organizations, which gives you the option to safeguard your sewage lines from damage.

See also:  How To Septic Tank Works? (Question)

How to Install a Septic System

Documentation Download Documentation Download Documentation In rural regions of the nation where waste water treatment is not accessible, private on-site wastewater treatment systems (POWTS), also known as septic systems, are utilized largely to treat waste water. Gravity fed/conventional systems are divided into two broad categories: 1. gravity fed/conventional systems and 2. alternative (pump) systems, which include aerobic treatment units (ATUs.) In most cases, electric pumps are used in alternative systems.

However, in many health jurisdictions across the United States, it is still feasible for an individual property owner with heavy equipment operation skills to utilize a backhoe to establish a septic system on their land.

Steps

  1. Read More About ItRead More About It In rural regions of the nation where waste water treatment is not accessible, private on-site wastewater treatment systems (POWTS), also known as septic systems, are utilized largely to treat wastewater. Gravity fed/conventional systems are divided into two broad categories: 1. gravity fed/conventional systems and 2. alternative (pump) systems, which include aerobic treatment units and other components (ATUs.) Electric pumps are commonly used in alternative systems. Because of the possible harm to the environment posed by contamination of the watershed, this project is advised for a professional with relevant experience. However, in many health jurisdictions around the United States, it is still possible for an individual property owner with heavy equipment operation skills to build a septic system with a backhoe.
  • The following are some of the conclusions from the site survey that have an impact on the design:
  • Available space
  • Terrain
  • Intended purpose and projected water demand depending on the size of the residence or building that the system will serve
  • Location of the well and/or nearby wells
  • And other factors.

The following are examples of soil test findings that have an impact on the design:

  • The soil type and layering (sand, clay, rock, and where it is placed in relation to depth)
  • The soil’s ability to drain and filter wastewater
  • And the soil’s ability to drain and filter wastewater

2Wait for clearance before proceeding. The system may be deployed once all of the relevant permissions and approvals have been obtained. Make certain that all of the steps listed below are carried out in accordance with all applicable laws, plumbing rules, and building codes. Advertisement Please keep in mind that the following procedure assumes that the system is being installed for the first time and not as a replacement.

  1. 1 Assemble all of the equipment and tools that will be used in the dig. You will require the following materials:
  • Backhoe, laser transit, and grade pole are all included. A 4″ Sch. 40 PVC pipe (and fittings, if necessary)
  • A 4″ ASTM D2729 perforated pipe
  • A 4″ASTM D3034 pipe and fittings
  • A 4″ Sch. 40 vent cap and test cap
  • PVC primer and adhesive
  • A 4″ Sch. 40 vent cap and test cap The following tools will be required: Saw (either hand saw or cordless reciprocating saw)
  • Hammer drill and bits (for drilling through walls if necessary)
  • The following items are required: hydraulic cement (to seal surrounding pipe if pipe is going through wall)
  • Shovel
  • Stone measuring an inch and a half and cleaned (amount varies depending on system size)
  • Tape measurements (both ordinary and at least a 100-foot-long tape)
  • Septic fabric (cut to 3′ length or less from a roll)
  • Septic tank and risers (concrete or plastic if allowed)
  • Riser sealant such as Con-Seal (for concrete) or silicone caulk (for plastic)
  • A septic filter (such as a Zoeller 170 or similar) if one is necessary
  • A distribution box (either concrete or plastic, if more than two laterals are being run)
  • And a septic tank.

2 Determine the location of where you want to enter the building in relation to where you want to install the septic tank. Make an excavation at least 2 feet deep and drill a hole through the wall, or go deeper and drill a hole beneath the footing, depending on your preference or the need. Because this is precisely what a gravity-fed system is designed to accomplish, expect the flow to continue to flow downhill from here. When transferring waste from the tank to the drain field, it does not employ any mechanical methods other than gravity.

  • The pipe should be 4″ Sch. 40 and should extend at least five feet outside the structure toward the tank, either through the wall or beneath it. Set it level where it will pass through a wall or under a footing, and from there, run it with approximately 1/8″ of pitch (slope) every foot of length toward the septic tank until it reaches the tank. If necessary, go even farther into the tank or all the way into the tank. If this is the case, switch to 4″ 3034 with the necessary adaptor and pipe toward the tank with 3034 instead.
  • The pipe should be 4″ Sch. 40 and should extend at least five feet outside the structure toward the tank, either through the wall or under the footing. Start at the lowest point possible, such as where it will pass through a wall or under a footing, then work your way uphill with a 1/8″ pitch each foot of pipe toward the septic tank. If necessary, continue to the bottom of the tank or all the way to the bottom. If this is the case, switch to 4″ 3034 with the appropriate adaptor and pipe 3034 toward the tank.

3 Dig a hole large enough to accommodate the installation of the concrete aerobic tank below ground. Make use of the laser transit to “shoot” the top of the pipe that leads out to the tank with the laser. The distance between the top of the intake and the bottom of the tank is measured in feet and inches.

To the number you fired off the top of the pipe, add this (go up on the grade pole) + 1 1/2″ to get the total. The depth of the grade pole has now been adjusted to the desired depth. Using this, dig the hole to the desired depth.

  • Prepare your leech field by laying it out and excavating it according to the results of the test performed during the permit application procedure. Maintaining a good flow between the tank and the drain field should be considered when planning out and digging the tank.

4Use “inch-and-a-half cleaned drain rock” from a neighboring gravel dump to surround the pipe, which is required in most areas. This is necessary in order to keep the pipe stable. For further information on the size of embedment and gravel required, check with your local health department. There is no slope from one end of the perforated pipe to the other in a gravity drain field, and the pipe has capped ends. 5 Once you have received a green sticker from the health inspector, you must cover the pipe and tank.

Advertisement

  1. A pump chamber after the septic tank should be installed The pump chamber, also known as a pressure tank, dosing tank, or dosing tank, is where the electric pump is housed, which is responsible for transporting effluent from one location to another and finally into the drain field for disposal.
  • Set up the pump chamber in the same manner as you would a septic tank. The effluent pump and floats are housed in the pump chamber, and they are responsible for pumping the effluent out to the drain field at predetermined or scheduled intervals. This is a hermetically sealed system. To ensure that the electrical installation complies with state standards, it is frequently necessary to hire a qualified electrician. It is important to remember that in places with high groundwater, the pump chamber or additional ATUs may remain essentially empty for long periods of time, and that these tanks may need to be safeguarded from floating by the installation of additional weight or other protective features.

All construction details, including the layout of all sewers outside the home, the location and depth of all tanks, the routing and depth of pressurized effluent lines, and other system components such as the drain field and any additional ATUs, must be consistent with the septic system plans approved by the county health department. 3 Once the inspector has given his final permission and the system has been started, cover the tank and pressurized lines with plastic sheeting. Advertisement Create a new question

  • Question I had a tank put, but it isn’t level with the ground. What will be the ramifications of this, and should it be leveled? It is necessary to keep the tank level. It is difficult to predict what it will have an impact on because we do not know which direction it is off level. Question Is it necessary to be concerned about tree roots growing into the drainage area when using a gravity flow kind of tank? Whether or whether you have lateral lines is dependent on the kind of trees that are growing close or above them. Tree species that tend to extend roots into the lateral lines and obstruct them are known as ramifications. Due to the fact that they are buried deep in the ground and surrounded by a pocket of gravel that allows waste water to drain out, they are rarely affected by grass, weeds, and shrubs. Question What is the maximum depth that a pipe may be lowered into the leech bed? The majority of systems require 12 volts “in the form of rock The perforated pipe should be suspended in the top area of the rock
  • It should not be touching the rock. Question Maintaining a lush green grass on or above your pitch is it safe, or is it a good practice? According to what I’ve heard, brown or dead grass is preferred so that your field can breathe more easily. It is necessary for your field to take a breath. The presence of green grass across your field indicates that it is functioning well. With lush grass covering your field, it will be able to breathe. There should be no planting of woody shrubs or trees over the leach field. Question What is the recommended distance between the septic tank and the house/boundary? A minimum of fifty feet is required. States have different laws, but this is the most common distance
  • Nonetheless, other states have stricter laws. Question What is the average amount of soil that goes into a residential leach field? It is dependent on how chilly it becomes. There are no less than 12 in the northern United States “in the leach field’s surface
  • Question Is it possible to build a septic system during the cold months? What you should do will depend on whether or not you reside in a place where the ground freezes. Question What amount of water should I put in the tank to get it going? None. A typical tank holds 1,000 gallons and will fill up quite quickly if used on a regular basis. When liquid effluent is discharged to the drain field, the goal is to catch and pre-treat particles that have accumulated. It is possible that a pump system will require water to prime the pump. Question There is a misalignment between my septic field’s underground line and the pipe on the tank. Is it OK to utilize a 90-degree elbow on my septic tank? As long as you have decent downhill flow, you should be fine. Instead of using a 90, I would use two 45s. Question If I’m installing a septic system, when should I contact an inspector? Immediately following system installation but before earth is used to cover the system in place Always check with the inspector ahead of time to verify that they can satisfy your inspection needs

More information on the replies Inquire about something There are 200 characters remaining. Include your email address so that you may be notified when this question has been resolved. SubmitAdvertisement

  • The use of aerobic bacterial additions (which are available at most DIY stores) to maintain a healthy and well functioning system, as suggested by producers on a periodic basis, is contentious. The septic tank is an anaerobic (wet) environment in which the majority of yeasts and other additions will have little or no effect on the sewage being processed. When it comes to installing septic tanks, some old school installers believe that placing an additive, a shovel of muck, or even a dead cat in an empty tank will “start” the process. What naturally enters the tank serves as the only thing that is necessary. The aerobic (wet or dry) component of the system consists of hundreds of square feet of drain field, where additives will do little help even if they make it all the way to the end of the system. The use of chemicals in septic systems has not been the subject of an independent research that has been published in a respectable scientific publication anywhere in the world, including this nation. This will mostly certainly be confirmed by your local health department. Each phase of the building process will almost certainly include an examination by a health inspector before the work can be completed or covered up. On pressurized lines, the use of a sand embedment is recommended in order to reduce the amount of damage caused by moving soil that has a high concentration of clay. When pumps are turned on and off, pressurized lines might move as well. Four inches (10.2 cm) of sand bedding on all four sides of the lines will prevent sharp pebbles from the ground or backfill from wearing holes in the pipe over time
  • And

Thank you for submitting a suggestion for consideration! Advertisement

  • Keep the perforated pipe for the leech field in a vertical position while installing it to avoid having the holes in the pipe turn downward. It is necessary to lay the perforated drain field pipe ASTM 2729 dead level, so that the printed line on the pipe is facing up. The perforations on both sides of the pipe are on both sides of the pipe. All of the sections of perforated pipe are cemented together, and the ends of each leach line are capped to complete the installation. So, when waste water enters the pipe, it will fill the pipe to the height of the perforations and overflow from ALL of the holes, utilising the whole leach field as a means of treatment. In certain health authorities, you can utilize waste water to water grass or decorative plants, trees, vegetable gardens, and fruit trees if you place the perforated pipe on a slope. However, the water must first be cleaned by the system (tertiary treatment includes disinfection) in order to prevent pathogens (germs) from the septic system from being discharged into the environment throughout the process. Make sure to check with your local health authority to verify if the practice known as “reuse” is permitted in your community.

Advertisement

Things You’ll Need

  • The following tools are required: backhoe tractor, trencher, shovel, contractor’s laser level and rod, or a surveyor’s transit. Septic tanks
  • PVC pipe with perforations
  • Material for embedding
  • PVC adhesive, PVC fittings, and a septic tank outlet filter are all included. Hand saw
  • Course file
  • Sandpaper If necessary, effluent pumps and floats are installed. If an alternate system is used, a control panel is installed.

About This Article

The writers of this page have together authored a page that has been read 499,453 times.

Did this article help you?

Leave a Comment

Your email address will not be published. Required fields are marked *