How To Make A Septic Tank Out Of Square Plastic Containers? (Question)

  • Place the hole about 4–5 inches (10–13 cm) down from the top of the drum and make sure it lines up with the hole on top of the tank. Cut the hole with a saber saw or a hole saw. 4 Cut 2 holes in the side of the drum at 45-degree angles from the center of the hole on top.

Do plastic septic tanks last?

Poly septic tanks generally have a lower lifespan than concrete tanks. Plastic tanks usually have low effluent levels and will “float” when the water level is higher than usual. This “floating” can destroy your plumbing system and the septic tank itself.

How long do plastic septic tanks last?

A septic tank can last between 20 and 40 years. The lifespan depends on the tank’s material. A steel tank lasts 20 years, while a concrete tank lasts 40 years. Plastic tanks can last as long as 30 years.

Can you have a septic tank without a leach field?

The waste from most septic tanks flows to a soakaway system or a drainage field. If your septic tank doesn’t have a drainage field or soakaway system, the waste water will instead flow through a sealed pipe and empty straight into a ditch or a local water course.

What is the smallest septic tank available?

If you’re looking to install a septic system, the smallest tank size you’re likely to find is 750-gallon, which will accommodate one to two bedrooms. You can also opt for a 1,000-gallon system, which will handle two to four bedrooms.

What size septic tank do I need for a tiny house?

Tiny homes typically require a 500 to 1,000-gallon septic tank. Though, it’s not always possible to implement a tank of this size. In some states, for example, the minimum tank size is 1,000 gallons. There may be exceptions to this rule if your home is on wheels.

What is a holding tank septic system?

A holding tank, also called a waste water holding tank or black (water) tank, is a container for storing sewage in vehicles equipped with toilets. The contents are emptied into a dump station, which discharges the raw sewage into a sewage treatment system.

Can an IBC tote be used as a septic tank?

IBC Totes are large, tanks which are used to store and transport fluids and other bulk materials. Both the size and rigid structure of these caged tanks make them ideal for “repurposing”.

What is the cheapest septic tank?

Types of Septic Tank Systems These conventional septic systems are usually the most affordable, with an average cost of around $3,000.

What are plastic septic tanks made of?

Our plastic septic tank are designed for durability and quick, easy installation. Since our plastic septic tanks are made out of polyethylene, they are unaffected by soil chemicals and by the chemicals and gases present in sewage, so our plastic septic tanks will not rust or corrode.

How to Construct a Small Septic System

Documentation Download Documentation Download Documentation There are two main sections to most private septic systems: the holding and digesting tanks, and the dispersion field or leach field. As the liquid waste in the first holding tank fills up, it will be transferred to the second holding tank. Once the second tank is completely filled with liquid, the liquid will dissipate into the earth underneath it. The system displayed here is a modest system that is intended for limited use by two persons who do not need to do laundry.

When compared to a conventional house septic system, this system employs two 55 US gallon (210 L) drums, rather than the 1,000–2,000 US gallon (3,800–7,600 L) tanks that are utilized in a standard home septic system.

Property owners considering installing a system similar to this one should be advised that this system would fail inspections by any public health department in the United States, and that the owner may be liable to a fine if the system was discovered in operation by a health official.

Toilets that conserve water nowadays utilize less than two litres of water every flush.

It might be a lifeline for those who live in areas where septic treatment is not available.

Part 1 of 3: Cutting the Tanks

  1. 1Cut a hole in the center of the top of each drum that is the same size as the outer measurement of the toilet flange. Take the outside diameter of the toilet flange that you’re using and multiply it by two. Place the hole close to the edge of the drum so that you may simply connect them to pipes in the near future. Cut the drums using a saber saw to make them lighter
  2. 2 Each hole should be capped with a 4 in (10 cm) toilet flange. Push the flanges into the top of each tank until they are flush with the surface. As soon as the flanges are in position, tighten them down so they don’t move or shift once they are in place. Advertisement
  3. s3 Cut a hole in the first drum that is 4 in (10 cm) in diameter on the opposite side of the drum from the hole in the top. Placing the hole approximately 4–5 inches (10–13 cm) below the top of the drum and ensuring that it lines up with the hole on the top of the tank are the most important steps. 4 Make a hole in the wall with a saber saw or a hole saw. Cut two holes in the side of the drum at 45-degree angles to the center of the hole on the top, one on each side of the drum. The center line is the line that runs through the middle of the hole on the top of the drum. Make 45-degree angles from either side of the centerline, then mark them on the second drum using a permanent marker. Make your holes in the barrel by cutting through the side with a saber or a hole saw and drilling them out. Advertisement

Part 2 of 3: Placing the Tanks Underground

  1. 1 Dig a trench that is 4 ft 26 ft 3 ft (1.22 m 7.92 m 0.91 m) in length and width. Excavator or shovel are both good options for digging a hole in the ground where you wish to put your tank. Continue excavating until the hole measures 4 feet (1.2 m) in width, 26 feet (7.9 m) in length, and 3 feet (0.91 m) in depth.
  • Excavators for excavating are often available for hire from a heavy machinery supply company. Look for equipment rentals on the internet
  1. 2Place the drum at the end of the trench, with one side hole drilled in it. When you place the drum on the floor, make sure it is level. Check to see sure the drum’s top is at least 4 inches (10 cm) below the surface of the water. 3 Dig a hole that is one foot (30 cm) deeper than the first to accommodate the positioning of the second drum in front of the first. In order to ensure a tight fit and prevent the drum from shifting, make your hole the same diameter as the drum you’re inserting in it. 4 The hole should be leveled with gravel until a 90-degree bend can be made to connect the top drum’s hole on one side to the toilet flange on the other. Check the alignment of the holes in the 90-degree bend between the two drums by dry fitting it between the two drums. If you need to improve the alignment of the pipe line, dig the hole a little deeper. 5 To make the bend, cut 31 2in (8.9 cm) pieces of ABS pipe and adhere them to the bend with epoxy or hot glue. With a hacksaw, cut the ABSpipe parts, also known as nipples. 6 Insert the pieces into the bend and hold them in place using PVC adhesive. Check the fit between the two drums to ensure that they are in alignment. Insert the end of the 21 2in (6.4 cm) nipple into the side hole of the first drum and tighten the nut. 7Glue the end of the 31 2in (8.9 cm) nipple into the toilet flange on the second tank, making sure that the nipple on the other end aligns with the hole on the top of the second drum. To hold the bend in place, apply PVC glue to the inside of the bend. Don’t be concerned about the connection to the first drum just yet
  2. You’ll make that connection later. 8. Glue a Y-bend to a 31 2in (8.9 cm) nipple, and then bend the angled portion of the Y-bend at a 45-degree angle. Using your PVC glue, attach a nipple to the end of the Y-bend and let it dry. Align the angled pipe on the Y-bend so it meets the incoming waste line, and glue it into the toilet flange
  3. s9 Cut and glue21 ⁄ 2in (6.4 cm) nipples to one end of the 45-degree bends at and insert them in the side of the lower drum. Point the ends of the 45-degree bends so they’re perpendicular to the bottom of the trench. Advertisement

Part 3 of 3: Connecting the Drain Pipes

  1. Put a stake into the ground and level it with the bottom of each of the 45-degree bends. 2Put a stake into the ground and level it with the top of the 45-degree bends. It doesn’t matter what sort of stakes you use since they all work. Use a mallet or hammer to pound the stakes into the ground. Attach a one-inch-wide block to the end of a four-foot-long (1.2-meter-long) level using duct tape. This will assist you in ensuring that you create sloped drain pipes so that your tanks can empty
  2. 3Place another stake approximately 37 8ft (1.2 m) down the trench from the first one
  3. 4Place another stake approximately 37 8ft (1.2 m) down the trench from the first one
  4. 5Place another stake approximately 37 8ft (1.2 m) down the trench from the first one. Drive the stake down until it is the same height as the first one using your hammer or mallet
  5. 4 Place the end of the level without the block on the first stake and the block on the second stake to complete the level without the block. Continue to pound the second stake into the ground until the level is balanced. 1 inch (2.5 cm) lower than the previous post, or 1 inch (0.64 cm) lower per 1 foot (30 cm)
  6. 5Repeat this method until you have stakes running the whole length of the trench
  7. Continue to place stakes down the rest of the trench every 37 8feet (1.2 m) from the last one, ensuring that the stakes slope away from the drums
  8. 6Place gravel in the trench until the top of the gravel is level with the top of the stakes
  9. 7Place gravel in the trench until the top of the gravel is level with the top of the stakes The gravel will now slope away from the drums at a rate of 1 4 inch (0.64 cm) per 1 foot (30 cm) of horizontal distance
  10. 7Place 20 ft (6.1 m) of perforated drain pipe into each hole on the second drum
  11. 8Place 20 ft (6.1 m) of perforated drain pipe into each hole on the third drum
  12. 9Place 20 ft (6.1 m) of perforated drain pipe into each hole on the fourth drum
  13. 10P Insert the ends of the drain pipes into the 45-degree bends on the lower drum to complete the installation. 9Make certain that the perforations in the pipes are facing down so that liquids may soak back into the earth
  14. 8checking the pipes with a level to ensure that the 1 4in (0.64 cm) slope is consistent throughout the length of the pipe. Fill up any gaps in the slope by adding or removing gravel under the pipe. Seal the 45-degree and 90-degree bends that connect the lower and top drums, respectively, with silicone. For the greatest seal possible on your drain pipes, use a two-part epoxy or silicone caulk. For this purpose, consider utilizing flex pipe, which will yield a little bit if the ground changes. Tenth, fill the lower drum halfway with water to keep it from collapsing under the weight of all the gravel. Place the remaining gravel over the trench and into the bottom drum, covering it completely. 11Lay landscape fabric over the top of the gravel. As a result, the dirt will not be able to seep into the gravel and you will be able to keep proper drainage on your tanks
  15. 12Fill the remaining trench area with soil, compacting it to the original grade. When you have finished filling up the area with your dirt, check to see that the ground is level. 13Fill the upper drum with water, leaving the top pipe from the first tank exposed so that you can readily reach the tanks if you need to drain them later. 14Fill the lower drum with water. Fill the top drum with water and pour it directly down the exposed pipes on the bottom drum. Continue filling the drum until it is completely filled, then secure the top with a cap to keep out the elements. Advertisement

Community Q A

Put a stake into the ground and level it with the bottom of each of the 45-degree bends. 2Put a stake into the ground and level it with the top of the stake. The type of stakes you employ is completely irrelevant. 2Tape a 1 in (2.5 cm) broad block to the end of a 4 ft (1.2 m) level and drive the stakes into the ground with a mallet or a hammer. As a result, you will be able to create sloped drain pipes that will allow your tanks to empty properly; 3Place another stake approximately 37 8ft (1.2 m) down the trench from the first one; 4Place a third stake approximately 37 8ft (1.2 m) down the trench from the first one; 5Place a fourth stake approximately 37 8ft (1.2 m) down the trench from the first one; Drive the stake down until it is the same height as the first one, using your hammer or mallet.

Place the end of the level without the block on the first stake and the block on the second stake to complete the level without using the block.

The second stake is now 1 inch (2.5 cm) lower than the first, or 0.64 inch (0.64 cm) lower every 1 foot (30 cm); 5Repeat this process until you have stakes running the whole length of the trench; Place stakes every 37 8feet (1.2 m) down the rest of the trench so that the stakes slope away from the drums; 6Place gravel in the trench until the top of the gravel is level with or above the top of the stakes; 7Continue to place stakes every 37 8feet (1.2 m) down the rest of the trench so that the stakes slope away from or above the top of the drums As a result, the gravel will now slope away from the drums at a rate of 1 inch (0.64 cm) per 1 foot (30 cm) of horizontal distance; 7Place 20 ft (6.1 m) of perforated drain pipe into each hole on the second drum; and 8Place 1 foot (30 cm) of perforated drain pipe into each hole on the third drum; and 9Place 1 foot (30 cm) of perforated drain pipe into each hole on the fourth drum; and 10Place Slide the drain pipes’ ends into the 45-degree bends on the lower drum, ensuring that they are completely enclosed.

  1. 8Check the pipes using a level to verify if the 1 4in (0.64 cm) slope is consistent throughout the length of the pipe; 9Make sure the holes in the pipes face down so that liquids may soak back into the ground; 10 Fill in any gaps in the slope by adding or removing gravel under the pipe.
  2. For the finest seal on your drain pipes, use a 2-part epoxy or silicone caulk.
  3. 11 11Lay landscape fabric over the gravel and bury the trench up to the top of the bottom drum with the leftover gravel.
  4. 13Fill the higher drum halfway with water, leaving the top pipe from the first tank exposed so you may readily reach the tanks if you need to drain them later.

Directly from the top drum, pour the water down the exposed pipes. Pour in the remaining contents of the drum until it is completely filled, then secure the drum with a cap. Advertisement;

  • Question What is considered a low level of use? Low consumption is defined as less than 125 gallons per day. Question Was the ‘y’ elbow on the first tank’s tank for any particular reason? Is it left open or sealed when it has been completed? Isn’t it going to stink if it’s left open? The clean out requires a threaded cap or plug, which is provided. Question What kind of water do you use to fill it? “Fill” is the most important term here. Continue to fill the drum with water until the level does not rise any more
  • Question Suppose I neglected to attach a slip coupler to the perforated pipe and only had 10 feet of it. Is it still possible to use this? Yes, however you will need to raise the depth of the field in order to get the same cubic feet of capacity
  • Nevertheless Question What is the best way to find out if something is legal in my state? This is a quick and easy approach that is unlikely to be appropriate for long-term usage in the majority of states. It is possible that the property owner and/or the installation will be penalized if this is uncovered. Question Is it possible to utilize two or three 275-gallon water totes instead, or a water tote and barrel combination? It doesn’t matter either direction you go. It’s best to utilize a single tote and a barrel as a digestion tank and a distribution box if you have only one tote. Question What is the purpose of filling the higher barrel with water? You fill the top barrel with water so that when sewage waste is introduced into the barrel, it flows into a sufficient amount of water to initiate the anaerobic digestion process. Question What is the best way to clean up this system? If there is enough bacteria in it, it will clean itself with minimal effort. If it starts to fill up, you may call a septic service to have it emptied
  • If it doesn’t, you can do it yourself. Question What is the correct grade slope of the drain field for every ten feet of length of the drain field? It is possible for the field’s bottom to be level. When running away from the drums, the pipe system should be sloped at 2 percent, or 2.5 inches every 10 feet. Question Is it possible for this system to freeze in the winter? And might I use antifreeze in the mix as well? Antifreeze will destroy the beneficial bacteria that are required for the process to function properly. The process is biological, and it will generate some of its own heat as part of the process. It’s always possible to dig a little deeper to gain a little extra insulation above it.
See also:  How To Lock Lid For Septic Tank? (Solution)

More information on the replies Inquire about something There are 200 characters remaining. Include your email address so that you may be notified when this question has been resolved. SubmitAdvertisement

VideoBy using this service, some information may be shared with YouTube.

  • The horizontal side of the “Y” links to the waste source, and it should be fitted with a connector that is compatible with the source supply line
  • Instead of using a 90° elbow, you should join two of them together to produce a U-shaped connection. In this manner, the end that is in the first barrel will be pointed towards the bottom of the tank, rather than the top. This should be reinforced with a short segment of straight pipe that is several inches deeper towards the bottom. Solids either float or sink depending on their density. They don’t seem to congregate in the middle. As a result, only the broken down liquid waste makes it to the second tank, and the solids are never seen again. The same procedure should be followed for each of the drainage pipes that originate from the second barrel. Just to be completely certain that no solids find their way into the global drain field, the waste is dumped into the first tank, with the solids settling to the bottom of the first tank. Whenever the liquid level exceeds the outfall to the second tank, it is drained into the tank below it. If there are any solids present, they will sink to the bottom. Whenever the liquid from the second tank reaches one of the two outfalls, it is transported to the gravel leaching field for dispersion. Over time, the vast majority of the solids will liquefy and disperse. Solids may accumulate at the top of the tank after many years, necessitating the removal of the solids. Thirty percent of the waste is absorbed into the earth, with the remaining seventy percent being dissipated by sunshine. It is important not to compress the soil since this would interfere with the evaporation process
  • The vertical side of the “Y” will be used to pump out the tank after it is entirely filled with solids
  • The depth of the trench should be proportional to the depth of the waste source line. If the line is deeper or higher than the one depicted, you will need to dig the trench deeper or shallower to suit the new line depth or height. It’s not that difficult to find out. In the event that you have a septic system that is too shallow, it may be more susceptible to damage. After a period, you may discover that the ground has sunk below the trench’s location. Fill it in with extra dirt and compact it
  • It is assumed that you are familiar with working with ABS plastic pipe. In addition, you must have the necessary tools to dig the trench (or be ready to put in a lot of effort).

Send in a Suggestion All tip entries are thoroughly scrutinized before being published on this website. Thank you for submitting a suggestion for consideration! Advertisement

Warnings

  • This is a system with a relatively limited capacity. This is not intended to suit the demands of a big family or group of people. It is intended for use with a modest travel trailer and two individuals. In order to extend the life of this little septic system, it is recommended that you do not place anything else in it but water, trash, and toilet paper. You may have to pump the upper drum once or twice a year if you don’t do so. During the course of five years, the system depicted here will only require pumping twice. Do not drive through the area where the drums are located. When establishing a septic system, make sure to adhere to all applicable municipal regulations. It is against the law to establish a septic system without first obtaining a permission. In the permission, you can find information on the local regulations for installing a septic system. You should avoid situating a septic system too close to trees since tree roots will grow into your lines, block them, and eventually cause damage to your system.

Advertisement

Things You’ll Need

  • 3/4 or 1 1/2 crushed rock or blue metal
  • 80 square feet (7.4 m 2) of landscape fabric
  • 9 cubic yards (6.9 m3) of 3/4 or 1 1/2 crushed rock or blue metal 55 US gal (210 L) plastic drums
  • 10 feet (3.0 m) of ABS plastic pipe with a diameter of 4 in (10 cm)
  • 4 in (10 cm) ABS 90-degree bend
  • 4 in (10 cm) ABS Y-bend
  • 3 ABS 45-degree bends with sizes of 4 in (10 cm)
  • 2 55 US gal (210 L) plastic drums A total of 40 feet (12 meters) of 4 inch (10 cm) perforated drain pipe
  • Two 4 inch (10 cm) diameter drain pipe couplers
  • And two toilet flanges with 4 inch (10 cm) diameters are included. PVC glue, two-part epoxy or silicone sealant, a level, and ten wood stakes are all required. 1 in (2.5 cm) thick wood block
  • Duct tape
  • 4 in (10 cm) ABS detachable cap
  • 1 in (2.5 cm) thick wood block

About This Article

wikiHow Staff Writer contributed to this article. This article was written in part by members of the wikiHow Staff. Our highly skilled staff of editors and researchers checks articles for correctness and completeness before publishing them. The work of our editorial staff is regularly monitored by wikiHow’sContent Management Team to ensure that each article is supported by reliable research and fulfills our high quality standards. This article has been viewed 2,325,557 times since it was published.

Views:2,325,557 The writers of this page have together authored a page that has been read 2,325,557 times.

Did this article help you?

Plastic septic tanks are only one important component of a home’s wastewater management system. There are several other components as well. When you are preparing for your plastic septic tank installation, it is critical to recognize and remember that there are several critical steps to take when installing a new septic system, and if you do not complete each of them carefully, you may be faced with some very expensive consequences down the road.

Step 1: Design Your System

The first step is to take your time and properly design your complete system. There is some critical information that you will need to investigate and get in order to complete this task. You will require a site survey to assist you in determining the borders of your land so that your septic system can be installed in accordance with local restrictions about how near to your neighbor’s property wastewater may be discharged underground. The following are the most crucial pieces of information to look for during the site survey:

  • In addition to the quantity of space available, the land’s topography should be considered as well as the purpose and estimated usage of water based on the size of your home, so you know how much water your septic system will have to treat on a regular basis the position of any wells on your property or on the properties of your neighbors

In addition, you will need to conduct a percolation test on the soils in the region where your plastic septic tank installation will take place. Performing this test is critical because it will determine whether or not the ground is suitable for a plastic septic tank, as well as what type of structural precautions you will need to take to ensure that the plastic septic tank does not fracture or crack under the pressure exerted by the surrounding ground. The following parameters will be measured by the soil test:

  • The kind of soil and the composition of the soil (sand, clay, rock, etc.)
  • Layering (in which different soil types are found at different depths)
  • The capacity of the earth to drain and filter effluent

Once you have completed these tests, you will have the information necessary to build a septic system that is appropriate for your home.

Step 2: Seek Permits

The second stage in the installation process is to submit your plans and applications to your local government in order to obtain the permissions and approvals that are necessary.

In order to gain clearance for these designs, you must ensure that they are in compliance with all applicable plumbing and construction requirements. It is possible that you may be punished and compelled to remove your equipment if you do not obtain these critical permissions.

Step 3: Gather Equipment

Bring together all of the items that will be needed for your plastic septic tank installation. The following is a list of the equipment and parts that you will require:

  • Backhoe – this is by far the most effective method of digging the holes that will be required to install your septic system in the earth. In order to conduct some more accurate digging in the holes you dig with your backhoe, you’ll need a shovel. In order to assure exact measurements for digging, a laser transit surveying equipment is used. A grade pole is a surveying equipment that is used to accurately measure the depth of a hole while digging. (1) – 4′′ Sch. 40 PVC pipe – this is the input pipe from your house, and it may also require fittings
  • And (2) – 4′′ Sch. 40 PVC pipe – this is the output pipe from your home, and it may also require fittings
  • (1) – 4′′ perforated pipe in accordance with ASTM D2729 – output pipe for dispersing effluent into draining field
  • (1) – 4′′ASTM D3034 pipe with suitable fittings
  • (2) – 4′′ASTM D3034 pipe with appropriate fittings
  • – 4′′ Sch. 40 vent caps and test caps – to disperse gas buildup resulting from the degradation of waste in the septic tank
  • – 4′′ Sch. 40 test caps – to ensure that the tank is functioning properly. To join PVC pipes together, PVC primer and PVC adhesive are used. Cutting PVC pipe to the required length requires the use of a manual hand saw or an electric hand saw. The usage of a hammer drill and bits is required if you need to drill through the wall of your house in order to install the septic system. If you drill a hole through a PVC pipe, you may use hydraulic cement to seal the gap between the pipe and the wall of your home. The stone should be 1 12 inches in thickness and should be put below your septic system to guarantee proper drainage. Small and big tape measures – you will need at least 100 feet of tape, therefore it may be beneficial to have both a small and a large tape measure on hand
  • Septic fabric — You will need roughly 3 feet of fabric cut from a roll. Plastic septic tank and risers – check with your local rules to ensure that plastic septic tanks are permitted. Silicone caulk is used to seal the risers of the stairwell. If a septic filter is necessary, it should be installed. Check out the plumbing codes in your area. Distribution box made of plastic – this is utilized when running a system with many laterals to the draining field.
See also:  What Should You Do To Maintain Septic Tank? (Perfect answer)

Step 4: Install Intake Pipe

Choose one of the sides of your home or structure from which you want the septic tank to take in waste water for treatment. It is necessary to dig down at least 2 feet and either make a hole in the wall or dig further into the footing of the home or structure at that location. If you have a gravity-fed system, you should design the flow such that it flows downhill, rather than uphill, because gravity-fed systems do not require mechanical techniques to transport waste from a tank to a drain field.

  • Install the 4 inch Sch.
  • It has to be level at the wall and slope down about 1/8 inch per foot toward the plastic septic tank, according to the manufacturer’s specifications.
  • In the event that you swap pipes, make certain that you utilize the proper adaptor while connecting it to the plastic septic tank.
  • If you decide to drill a hole in the wall, you must use hydraulic cement to seal the area around the hole, both on the inside of the building and on the outside as well as the inside.
  • If the pitch is excessively steep, the wastewater will flow too quickly through the system, causing the particles to become caught in the pipe.

Step 5: Install Plastic Septic Tank

Excavate a huge hole deep enough to accommodate your plastic septic tank below the surface of the ground. Make use of your laser transit to identify the top of the intake pipe and measure the distance between the top of the intake pipe and the bottom of the tank with your tape measure. In order to get the depth you want, double that amount by 1 12 inches and add it to the measurement taken from your laser transit to your grade pole. Continue digging until you reach the desired depth. Afterwards, you must dig out your draining field (also known as a leach field) in accordance with the parameters of your survey results as well as any applicable local restrictions.

Make certain that you maintain a sufficient slope to ensure that outward flow from your plastic septic tank installation to your draining field is maintained.

Step 6: Install Draining Field

Generally, a 12 inch coating of washed drain rock will be required surrounding the pipe in order to keep it stable while it is transporting stuff. According to your local health criteria, the size of the gravel and the depth of this layer will be determined. If you are placing perforated pipe in a gravity septic system drain field, keep in mind that the pipe has no slope on either end and is capped on both ends.

Step 7: Inspection and Filling In

Following the permission of your local health inspector, it is time to cover everything with dirt and finish the job. To cover your cleaned drain rock before covering it with soil, you will most likely need a specific cloth that functions as a filter, untreated construction paper, or four inches of straw to cover the drainage region.

Bonus for Pump Plastic Septic Tank Installations:

If you have a pumped plastic septic tank installation, there will only be a few variations in the process you will go through. Before you can connect your plastic septic tank to your draining field, you must first construct a pump chamber in your home. The pump chamber is constructed in a manner similar to that of the septic tank, but the electrical aspects of the pump will necessitate the services of a certified electrician to ensure that you are in compliance with state standards. Those who live in areas with a lot of groundwater may find that their pump chamber is mostly empty most of the time, and others may find that they need to add more weight to the floatation mechanism that switches the pump on and off.

Not until you have obtained your permits and asked for assistance from local septic specialists at the first indication of problems, not after you have put everything together, filled it in, and discovered evidence of sewage leakage when you first turn on the water, should you begin digging.

Early involvement with the specialists will save you a great deal of time, money, and the frustration of having to repair a septic system that was badly constructed.

What size of septic tank do I need?

Probably one of the last things on your mind when you are constructing a new house is the location of your septic system. After all, shopping for tanks isn’t nearly as entertaining as shopping for cabinetry, appliances, and floor coverings. Although you would never brag about it, your guests will be aware if you do not have the proper septic tank placed in your home or business.

septic tanks for new home construction

The exact size of the septic tank is determined mostly by the square footage of the house and the number of people who will be living in it. The majority of home septic tanks have capacities ranging from 750 to 1,250 gallons. A 1000 gallon tank will most likely be required for a typical 3-bedroom home that is smaller than 2500 square feet in size. Of course, all of this is dependent on the number of people who live in the house as well as the amount of water and waste that will be disposed of through the plumbing system.

For the most accurate assessment of your septic tank needs, you should speak with an experienced and trustworthy sewer business representative. They can assist you in planning the intricacies of your septic system, including which sort of septic system will be most beneficial to you.

planning your drainfield

Here are some helpful hints for deciding where to locate your drainfield when you’re designing it.

  • Vehicles should not be allowed on or around the drainfield. Planting trees or anything else with deep roots along the bed of the drain field is not recommended. The roots jam the pipes on a regular basis. Downspouts and sump pumps should not be discharged into the septic system. Do not tamper with or change natural drainage features without first researching and evaluating the consequences of your actions on the drainage field. Do not construct extensions on top of the drain field or cover it with concrete, asphalt, or other materials. Create easy access to your septic tank cover by placing it near the entrance. Easy maintenance and inspection are made possible as a result. To aid with evaporation and erosion prevention, plant grass in the area.

a home addition may mean a new septic tank

Do not make any big additions or renovations to your house or company until you have had the size of your septic system assessed. If you want to build a house addition that is more than 10% of your total floor space, increases the number of rooms, or necessitates the installation of new plumbing, you will almost certainly need to expand your septic tank.

  • For a home addition that will result in increased use of your septic system, your local health department will require a letter from you that has been signed and authorized by a representative of your local health department confirming that your new septic system is capable of accommodating the increase in wastewater. It is not recommended that you replace your septic system without the assistance of a certified and competent contractor.

how to maintain your new septic system

For a home addition that will result in increased use of your septic system, your local health department will require a letter from you that has been signed and authorized by a representative of your local health department confirming that your new septic system is capable of accommodating the increased wastewater. It is not recommended that you replace your septic system without the assistance of a certified and qualified expert.

  • Make use of the services of a qualified specialist to develop a maintenance strategy. Make an appointment for an annual examination of your septic system. Utilize the services of an effluent filter to limit the amount of particles that exit the tank, so extending the life of your septic system. Waste items should be disposed of properly, and energy-efficient appliances should be used. Make sure you get your septic system professionally cleaned every 2 to 3 years, or more frequently if necessary, by an experienced and qualified expert
  • If you have any reason to believe that there is an issue with your system, contact a professional. It is far preferable to catch anything early than than pay the price later. Maintain a record of all septic system repairs, inspections, and other activities

common septic questions

Here are some of the most frequently asked questions by our septic customers.

How do I determine the size of my septic tank?

If you have a rectangular tank, multiply the inner height by the length to get the overall height of the tank. In order to find out how many gallons your septic tank contains, divide the number by.1337.1337

How many bedrooms does a 500-gallon septic tank support?

The exact size of the septic tank is determined mostly by the square footage of the house and the number of people who will be living in it. The majority of home septic tanks have capacities ranging from 750 to 1,250 gallons. A 1000 gallon tank will most likely be required for a typical 3-bedroom home that is smaller than 2500 square feet in size.

How deep in the ground is a septic tank?

Your septic system is normally buried between four inches and four feet underground, depending on the climate.

What do I do if My Septic Alarm is Going Off?

In the event that your septic alarm goes off, it may surely create some anxiety and uncertainty; and if you happen to be experiencing this right now, then you’ve arrived to the correct location! Don’t be concerned; it does not necessitate urgent action. Instead, take your time to go through this full essay so that you will be prepared to act now or in the future if the situation arises. What Septic Systems Are and How They Work The alarm works in conjunction with the septic system to alert you when the water level within the pump tank has increased to an unsafe level or has decreased to an unsafe level.

The timer is in charge of regulating the time intervals during which the pump is permitted to pump wastewater into the drainage system.

Thus, during periods of excessive water use, the drain field is kept from getting overflowing, which might cause damage to the drainage system.

A large amount of water is injected into the system in between pumping cycles for whatever cause, and the water has nowhere else to go but back into the system’s pump tank.

Depending on how much water was and continues to be put into the system and how the pump is set up to operate on a timer, it may take many pumping cycles until the water levels are returned to normal. Causes of the alarm going off in the first place

  1. There is an excessive amount of water being put into the septic system. This is the result of excessive water use, which might be caused by multiple loads of laundry, an excessive quantity of dishwashing, or a disproportionate number of long showers.
  1. Somehow, groundwater is making its way into the system. If there is an excessive amount of standing water surrounding the septic tanks, whether generated by rain or another source, the water may seep into the tanks and cause the internal water level to rise.
  1. It’s possible that one of the components of the septic system is malfunctioning. If anything goes wrong with your system — including the pump and floats — the alarm and timer will go off and the septic system will stop working correctly.

The Best Thing to Do If Your Alarm Goes Off Alternatively, if you hear an alert, you should press the red button or turn on the alarm box. The alarm will be turned off as a result of this action. There should be a red light and a green light on the alarm box, which should be situated someplace on the unit. The green light indicates that the alarm is operational and should be left on at all times. It is shown by a red light if the alarm is getting a signal from the pump tank indicating that the water level is increasing above or decreasing below what is expected.

  • If the breaker occurs to be tripped, look around the septic tanks to see if there is any standing water.
  • It is possible that the red light on the alarm box will go out on its own after allowing the septic system to operate for a couple of pump cycles (which should take approximately 10-15 hours).
  • If the red light turns off, it signifies that the system is operating properly and that it only needs to catch up with the extra water that has overflowed into the storage tank.
  • To be clear, an alarm signal from the septic system does not always imply that sewage is about to back up into the house right away.
  • Do you require septic system repair on a regular basis or emergency service?
  • Want to learn more about septic systems?

Florida Department of Health in Volusia

  • How can a new business determine whether or not it need an examination of its septic system? In order to add a room to my house, why do I need to get the current septic tank system authorized first? Who determines whether or not I require a mound septic system
  • What exactly do I need to do in order to fix my drainfield? Does the government offer any help programs for septic system repairs?

1. What is the reason for an inspection of the septic tank system for a new business?

A shop in the appropriate size and location has been discovered for my new business, which I want to launch shortly after. When I went to receive my Business Tax Receipt (BTR), (formerly known as an occupational license), they informed me that I needed to get the septic tank system certified by the Florida Department of Health in Volusia County. I agreed to this. A: According to Florida Statute 381.0065, any change in the ownership, kind of company, or tenant of a business that uses a septic tank system for sewage disposal must be approved by the local health department.

Modifications to company activities may result in an increase in sewage flow or a change in sewage characteristics.

Who is in charge of completing and submitting the application? It is possible for the owner or renter to apply and pay for the existing Commercial Inspection of Septic System Application.Top of Section

2.What is the reason to have the existing septic tank system approved before I add a room onto my home?

I intend to expand my current residence by adding a room. The building department informed me that they would not grant a building permit unless the current septic tank system had been authorized by the department. I believe that I will not be required to have an existing septic system inspection because the addition will not be air conditioned.If you are planning to add on to your existing home, you will be required to have an existing septic system inspection.This inspection procedure is required to determine if the existing septic system is large enough to accommodate the addition.Garages, carports, exterior storage sheds, open or screened patios or decks are excluded from this requirement.Air conditioning or heating of the addition is irrelevant to

See also:  Plant Shrub How Close To Septic Tank? (Best solution)

3. Who determines if I need a mound septic system?

I possess a piece of land on which I intend to build a house. According to a buddy of mine, I will most likely require a mounded septic system in order to properly dispose of waste. My lot is high and dry, and it never flooded during the recent torrential rains, thus I do not want a mound built on top of it. The Florida Administrative Code, Chapter 64E-6, mandates a 24 inch buffer between the wet season water table and the bottom of the drainfield during the rainy season. It is possible for water tables to change dramatically between wet and dry seasons.

As soon as the water table has been determined, a permit is drafted in accordance with state law requirements.

If sod is to be used on the slopes, a 2:1 slope is necessary for mounds up to 36 inches in height, and a 3:1 slope is required for mounds higher than 36 inches in height; if hay and seed is to be used on the slopes, a 5:1 slope is required regardless of the height of the mound.

Application for a New Septic System Construction Permit, as well as instructions on how to complete the application

4. What do I need to do to fix my drainfield?

My drainfield isn’t performing as expected. A septic system repair permit must be obtained before any work on your septic drainfield may be done.

5. Are assistance programs for septic system repairs available?

If you qualify, the Volusia County Community Assistance Division may have cash available to you. Contact them for more information. Please email [email protected] or call 386-736-5955 for further information. Section 1: Introduction

Plastic Septic Tanks

Ace, Norwesco, and Snyder Industries brand septic tanks are available at Tank Depot at competitive prices. Norway-based Norwesco has been manufacturing polyethylene septic tanks since 1980. Norwesco is the world’s biggest maker of polyethylene tanks. Norwesco has a wealth of knowledge and expertise to give you goods that have been tested and proved to provide years of dependable, trouble-free service. State and municipal health officials from coast to coast have certified Norwesco septic tanks, which are covered by a three-year warranty and have been in use for decades.

  1. Any Norwesco septic tank may be delivered to the project site in a pickup truck and handled by just two persons, depending on the model.
  2. Norwesco’s stringent quality control measures ensure that your septic tank is safe for the environment.Single or Double CompartmentOur 750, 1000, 1250, and 1500 gallon tanks are available as single compartment or double compartment tanks (2/3 – 1/3) depending on the size of your tank.
  3. Before installing any septic tank, you should check with your local health authority to see if there are any unique criteria that your county or state may impose.
  4. Tees are measured and cut to meet the requirements of each state code, ensuring that the tank you get is ready for installation.Watertight LidNorwesco septic tanks are equipped with a domed lid that is watertight.
  5. When the tank leaves our facility, the lid is secured to the tank with four stainless steel screws and is equipped with a foamed polyethylene gasket between the lid and the tank as a standard feature.

An optional gasket is offered to ensure a watertight seal around the lid area.Accessories are also available, including manhole extensions and lid-riser combinations that bring tank access up to grade and comply with code requirements.

Title: Appendix 75-A.6 – Septic tanks and Enhanced Treatment Units

Septic tanks and Enhanced Treatment Units are covered under Section 75-A.6. (a) Overarching information. (1) The capacity of a septic tank is determined by the number of bedrooms in a family. (2) An extension attic will be treated as if it were a second bedroom in the house. Table 3 outlines the minimum septic tank capacities as well as the minimum liquid surface areas for a septic tank. NOTE: For households with more than six bedrooms, the tank size requirements should be determined by multiplying the number of bedrooms by 250 gallons and seven square feet of surface area for each additional bedroom.

  1. (2) Septic tank lids must be easily accessible at all times.
  2. Extending collars must not be brought flush with the ground surface unless the cover can be fastened in place to prevent tampering with the installation.
  3. (b) Conceptualization and implementation.
  4. The following is applicable to all septic tanks, regardless of their construction material.
  5. The maximum depth for determining the authorized design capacity of a tank should be 60 inches in height and width combined.
  6. (ii) There must be a minimum of six feet between the input and outflow of the system.
  7. The effective length of rectangular tanks should not be less than two times the effective width, nor should it be higher than four times.

Following installation, all septic tanks must be capable of supporting at least 300 pounds per square foot of ground surface (psf).

If the liquid depth of the tank does not exceed 48 inches, the tank’s top opening must be at least 12 inches in the shortest dimension to meet the requirements of this section.

In all tanks, outlet designs such as gas deflection baffles are strongly suggested.

The distance between the outlet baffle and the outlet must not be more than six inches in either direction.

For the purpose of allowing for the venting of tank gases, there should be at least one inch clearance between the bottom of the tank’s top and the top of all baffles, partitions, and/or tees.

(vii) Tanks must be set on a bed of sand or pea gravel that is at least three inches deep.

It is also necessary to adhere to any additional instructions supplied by the manufacturer.

(ix) Garbage grinders are machines that grind garbage.

In addition, a gas deflection baffle or other suitable outlet modification, as well as a dual compartment tank or two tanks in series, are required.

I Dual compartments are suggested for all tanks and shall be needed on all tanks having an interior length of ten feet or more.

A minimum of 60 – 75 percent of the total design capacity must be accounted for by the first compartment or tank (on the intake side).

A four-inch vertical slot at least 18 inches wide, a six-inch elbow, or two 4-inch elbows positioned below the liquid level at a distance equal to one-third the distance between the invert of the outlet and the bottom of the tank should be used to link the compartments.

A single pipe with a minimum diameter of four inches should be used to link tanks that are connected in series.

(3) Tanks made of concrete.

If the design has been verified by a New York licensed professional engineer as meeting with all necessary standards for thin-wall construction, the wall thickness must be at least three inches in thickness.

For watertightness, all joints below the liquid level must be checked before backfilling; joints above the liquid level must be examined after backfilling for watertightness before backfilling.

Tanks made of fiberglass and polyethylene are also available.

I (ii) Special care must be taken during the installation, bedding, and backfilling of these units to ensure that the tank walls are not damaged.

(3) All tanks should be sold by the manufacturer entirely built, unless the manufacturer specifies otherwise.

(5) Tanks made of steel.

Standard UL-70 or a similar standard.

ETUs must be labeled to indicate that they meet the requirements for a Class I unit as defined in the National Sanitation Foundation (NSF) International Standard 40 or an equivalent testing procedure.

(b) ETUs should include an effluent filtering mechanism as part of the produced product or an effluent filter with a marking indicating conformity with NSF Standard 46 or an equivalent placed on the system outlet prior to discharge to the absorption area, whichever is the case.

(d) When one of the following scenarios exists, absorption areas receiving ETU effluent may be built with a 33 percent decrease in the total absorption trench length given in Table 4A or as computed from Table 4B.

It is only permissible to utilize the trench length reduction method for traditional absorption trench systems and shallow absorption trench systems, respectively.

When a property is located inside the New York City Watershed, the trench length decrease indicated in clause 75A.6(b)(6)(ii)(d) above is not applicable.

Section 905

TITLE 77:PUBLIC HEALTHCHAPTER I:DEPARTMENT OF PUBLIC HEALTH SUBCHAPTER r:WATER AND SEWAGE TITLE 77:PUBLIC HEALTH Part 905: Private Sewage Disposal Codes Section 905.40: Septic Tanks PART 905: Private Sewage Disposal Codes The approval of a septic tank is covered under Section 905.40 Septic Tanksa). Manufacturers of prefabricated septic tanks are required to submit to the Department for approval a set of blueprints for each size and configuration of septic tank that they produce. Plans must be drawn to scale and must include all measurements, baffles, tees, cleanouts, and material requirements, among other information.

In order to identify each manufacturer and series of certified septic tanks, the Department will assign an approval number to each manufacturer and will keep a list of the authorized manufacturers and approved septic tank series.

The tank shall be marked with the manufacturer’s approval number and the liquid capacity of the tank, in gallons, which shall be prominently displayed on the outside end wall of the tank above, or next to, the outlet pipe so that this information is readily visible after installation and before covering the tank with a cover.

3) All persons who manufacture, sell, offer for sale, or deliver septic tanks or aerobic treatment plants in or into the State of Illinois are required to keep a record of the following information about each septic tank or aerobic treatment plant sold or delivered: manufacturer, date of manufacture, date of sale, date of offer for sale, date of delivery.

A) The name of the purchaser or the property owner (if different); B) The location of delivery (county and address, legal description, or driving instructions); C) The date of the sale and delivery; and D) The size of the septic tank or the model of the aerobic unit.

It is necessary to design and install septic tanks in line with the following standards: 1) A septic tank must be watertight and constructed of sound and durable materials that are not subject to excessive corrosion, decay, frost damage, or cracking as a result of settling or backfilling.

2) Engineering Specifications (also known as technical specifications).

B) The tank must be able to support a top-dead load of not less than 500 pounds per square foot (psi).

To certify to the Department that the tank is planned and constructed in accordance with the requirements of this Part, the manufacturer, design engineer, or structural engineer must provide a written certification to the Department.

3) Substances (materials).

B) Precast reinforced concrete (also known as precast concrete).

D) Reinforced plastic is another option.

F) Thermoplastics are a kind of plastic.

It is required that the tank’s liquid depth be 42 inches at its lowest point and 72 inches at its highest point (see illustration).

The invert height of the entrance should be at least 2 inches above the liquid level in the tank (see Figure 1).

6) Baffles are a type of trapdoor.

B) Inlet baffles must be situated no more than 12 inches from the inlet orifice to ensure proper operation.

D) Outlet baffles must be supplied, and they must extend to a depth of 40 percent of the liquid’s total depth.

This is the minimum distance required.

In the case of “V” or semicircular baffles, the sides of the baffles must be fitted securely against the end wall of the tank.

I) In lieu of baffles, submerged pipe T-branches or sanitary tees may be utilized at the inlets and outlets, provided that all of the above-mentioned distances and depths are preserved.

The diameter of the outlet baffles must be 4 inches.

L) When submerged pipe T-branches or sanitary tees are used as baffles, it is the septic tank manufacturer’s obligation to ensure that the components are installed in the right place during the first installation.

This baffle must be manufactured of a long-lasting material that is not susceptible to corrosion or degradation.

The septic tank filter baffle must be fitted in such a way that it extends or suspends to a depth equivalent to 40 percent of the liquid level in the tank while in use.

7) The ability to get access.

a fitting lid with a minimum dimension of 12 inches (width or diameter).

Risers manufactured of a waterproof and durable material.

There must be no water seeping through the junction between the septic tank and the risers.

c) Capacity is the number of people that can fit into a space.

For any establishment other than a residence, septic tanks must be sized in accordance with the estimated flow provided in Appendix A, Illustration A, and as specified in subsection (c) below (2).

For flows larger than 500 gallons per day, the volume must be at least one-hundredth the expected daily sewage flow, whichever is greater.

d)�������� Multiple Tanks or Compartments.

� Two-compartment tanks shall also comply with the following: 1)�������� The wall separating the first and second compartments shall be tight-fitting and designed to handle the differential in pressure if one side is pumped.

3)�������� The center of the opening between compartments shall be in line with the center of the inlet and outlet openings.

5)�������� A gas deflection baffle shall be provided below the outlet baffle of the tank configured to deflect rising gas bubbles away from the outlet structure and toward the interior of the tank.

The gas deflector baffle may be replaced with another type of septic tank filter that complies with NSF International/ANSI Standard 46, Section 10.

The tank access over the filter shall be provided with an access riser that extends to 3 inches or more above the ground surface.

e)�������� Septic Tank Installation 1)�������� The septic tank should be positioned level and backfilled to avoid floating or drifting of the tank.

2) If the inlet, outlet, or access holes are to be located at or below the seasonal high water table, all tank openings must be sealed waterproof with mastic, tar, silicone caulk, or other suitable material.

f) Treatment Units that have been abandoned.

A break or crumble in the floor and walls of the tank will prevent it from holding water, and the tank will be filled with sand or dirt to prevent it from holding water.

Upon removal of the tank from the ground, the excavation area must be completely filled with soil. (Source: Amended at 37 Illinois Regulation 14994, which became effective on August 28, 2013)

Leave a Comment

Your email address will not be published. Required fields are marked *