  • Attach a rope or cable to septic effluent pump and lower the pump into the tank. Secure the rope or cable to a nearby post. Connect the top portion of the drainage pipe to the section of drainage pipe going to the distribution tank, and allow pipe dope to fully dry before operating the system.

How does a septic pump chamber work?

The pump chamber contains a pump that is capable of pumping the solids or grinding them into a slurry as it pumps. The need for raw sewage pumping may be due to the distance between the building and a suitable location for the septic system.

Should both chambers of a septic tank be pumped?

Thus it is important that every septic tank be pumped periodically to remove these captured, partially decomposed organic particles. The two-chamber tank provides enhanced removal of solids by holding the wastewater in each of the two tank chambers.

Does a septic tank need a breather?

The bacteria active in a septic tank are anaerobic. Anaerobic means the bacteria operate without oxygen from the air. There is not a great deal of gas generated in a septic tank, but the gas must be released so pressure does not build up in the tank. If the septic tank has inlet and outlet baffles, they must be vented.

How often pump septic tank?

Inspect and Pump Frequently The average household septic system should be inspected at least every three years by a septic service professional. Household septic tanks are typically pumped every three to five years.

How do you tell if a septic pump is working?

To test if the pump is working, first turn the pump on by turning the second from the bottom float upside down. While holding that float upside down, turn the next float up (that would be the second from the top), upside down. You should hear the pump turn on.

How does septic tank overflow work?

Naturally occurring bacteria in a septic tank help to break down waste and allow it to pass through to the drainage field. If bacteria levels are low, solids won’t break down, and will build up much more quickly than usual. This can cause the tank to overflow, or lead to clogs in drainage pipes or trenches.

Can you pump a septic tank yourself?

Technically, you can clean a septic tank yourself. However, professionals do not recommend that you do so. A professional has the tools needed to properly pump your tank. A professional also has the knowledge and training to remove all of the waste from your tank and dispose of it properly.

How long should a septic pump run?

Next, check the septic breaker to ensure the system has power. If the breaker happens to be on, check to see if there is any standing water surrounding the septic tanks. Let the septic system run a couple of pump cycles (should last about 10-15 hours ) and the red light on the alarm box may go out on its own.

Can you flush the toilet when the septic is being pumped?

You can save time and money by taking a few daily precautions that reduce the frequency of pump-outs your system will need: To flush or not to flush — Aside from wastewater, toilet paper is the only other thing that should be flushed.

How do I prepare my septic tank for pumping?

3 Ways to Prepare for Septic Tank Pumping

  1. Keep a Record of Septic Tank Maintenance. We recommend you keep track of all septic tank maintenance, service, and repairs that have been conducted since you’ve lived in the home.
  2. Locate System Components.
  3. Clear Away All Debris.
  4. Choose Curt & Jerry for Septic Tank Pumping.

Should I stir my septic tank?

Septic Stirring This solution typically works best for minor buildups. If done regularly, it can prevent your septic sludge from settling in too comfortably, but you have to be devoted.

Can I cut my septic vent pipe in yard?

They shouldn’t be removed but they can be cut down, level with the ground. Other white pipes may be standing above your septic tank, pump tank or close to your foundation. Those are available for maintenance, if needed, and shouldn’t be removed. Again, they can all be cut down close to the ground surface and recapped.

Where do you vent a septic tank?

The Role of the Vent As the septic tank fills with waste and water, the air has to go somewhere or the pressure will stop the flow and back up into the structure. To solve this problem a vent is connected to the top of the tank to release the waste gases and air outside.

How far away can vent be from toilet?

According to the UPC, the distance between your trap and the vent should be no more than 6 feet. In other words, for the vent to work properly, it needs to feed into the drain line within 6 feet of the trapways that connect to it.

Septic pump installation guide

  • INSTALLATION PROCEDURES FOR SEPTIC PUMPS, SEPTIC EJECTORS, AND GRINDER PUMPS

InspectAPedia does not allow any form of conflict of interest. The sponsors, goods, and services described on this website are not affiliated with us in any way. Installation instructions for a septic pump or sewage ejector pump: This article discusses sewage ejector pumps and domestic or light commercial-use sewage grinder pumps, which are used to transport wastewater from low-lying regions to a septic tank or a municipal sewer system, respectively. This septic pump or sewage pump article series will assist you in diagnosing and repairing issues with sewage pumps, performing routine sewage ejector pump maintenance, and, if necessary, selecting and purchasing a sewage pump for your home or business.

Allowable uses of this content include making a reference to this website and providing a brief quotation for the sole purpose of review.

Use the SEARCH BOX to discover the information you’re looking for quickly.

Guide to Sewage Grinder Pump Installation PartsProcedures

Waste from the bathroom or other plumbing fixtures it serves is collected and processed by the sewage grinder pump, which is contained in a plastic or steel reservoir. When a float within the reservoir shows that the amount of sewage in the reservoir has reached a dangerously high level, the float activates the grinder pump, which grinds and pumps the waste out. It is a sewage grinder pump, as seen at the top of this page, that grinds the waste and pumps the solid/liquid mixture to the building’s main drain.

  1. Pumping station for the sewage grinder(this is an Environment One Grinder Pump System)
  2. Lifting the eyes in preparation for dismantling the assembly (the circles at the mid-tank seam)
  3. Leads for electrical wiring for the grinder pump and the septic pump alarm
  4. Disconnect box for the grinder pump system’s electrical power
  5. The pump’s drain intake is a 4-inch PVC tank inlet that connects to the building’s drains that are supplied by the pump. Vent for the sewage pump tank. Septic grinder tanks must be vented directly or through the inflow pipe to a building plumbing vent stack located within 4 feet of the tank, whichever is most convenient. In this line, wastewater is drawn into the tank by gravity, rather than by force of the pump. 900 pounds, or approximately 6 cubic feet, of concrete to prevent the tank from floating up out of the ground
  6. 6″ deep of rounded pea gravel for the septic pumping tank bedding
  7. 1 1/4″ male pipe thread discharge outlet (the small diameter pipe leaving the tank at top right and passing through the foundation wall)
  8. Concrete septic pumping tank ancho r (900 pounds, or approximately 6 cu.ft. of concrete to prevent the tank from floating up out of the ground)
  9. Sewage Pumping Tank bedding

sewage grinder tank (this is an Environment One Grinder Pump System); sewage grinder pump system Remove the assembly (the circles at the mid-tank seam) by lifting the eyes. Leads for electrical wiring for the grinder pump and the septic pump alarm disconnect switch for the grinder pump system’s electrical supply; The pump’s drain intake is a 4-inch PVC tank inlet that connects to the building’s drains. Septic tank venting using a sewage pump Septic grinder tanks must be vented directly or through the inflow pipe to a building plumbing vent stack that is within 4 feet of the tank, whichever is most convenient.

Sewage Pumping Tank Ancho r (900 pounds, or approximately 6 cu.ft.

of concrete to prevent the tank from floating up out of the ground); Sewage Tank Ancho r (900 pounds, or approximately 6 cu.ft. of concrete

Sewage Pump Installation Details

  • Septic tank with a sewage grinder (this is an Environment One Grinder Pump System). detaching the assembly (the circles at the mid-tank seam) by lifting the eyes
  • Wiring connectors for the grinder pump and the septic pump alarm
  • Disconnect box for the grinder pump system’s electrical supply
  • The pump’s drain intake is a 4″ PVC tank inlet that connects to the building’s drains that are supplied by the pump. Vent for a sewage pump tank. Septic grinder tanks must be vented directly or through the intake line to a building plumbing vent stack located within 4 feet of the tank. In this line, wastewater is drawn into the tank by gravity from the drain input
  • 900 pounds, or approximately 6 cubic feet, of concrete to prevent the tank from floating up out of the ground
  • 6″ deep of rounded pea gravel for the septic pumping tank bedding
  • 1 1/4″ male pipe thread discharge outlet (the small diameter pipe leaving the tank at top right and passing through the foundation wall)
  • Concrete septic pumping tank ancho r (900 pounds, or approximately 6 cubic feet, of concrete to prevent the tank from floating up out of the ground)
  • Sewage Pumping Tank bedding gravel,
  • Before handling or installing the grinder pump, be sure that the electrical power to the circuit has been turned off. The electrical circuit for the pump should be correctly grounded, with no splices in the pump wire that connects to the pump. It is not necessary to utilize an extension cable to supply electricity to the pump. It is necessary to ensure that the pump basin or well has a big enough diameter to allow free movement of the float assembly without it becoming stuck. It is not permissible to raise the pump by its power cable. Waterproof junction boxes must be used for electrical circuit splices in a damp or wet environment. If your facility is susceptible to power interruptions, consider installing a battery-backed pumping system. Maintain a safe distance between the pump’s power cable and the discharge line, avoiding contact with the float assembly, sharp edges, and moving parts. Confirm that the electrical ground for the pump circuit is in fact connected and functioning by conducting electrical testing (DMM/VOM) on the ground. The pump motor should be connected to the electrical receptacle using the three-prong connector provided by the manufacturer, and the electrical receptacle should be grounded.
  • The sewage or septic pumping basin, well, or chamber is located here.
  • Check for material in the well or basin of the grinder pump
  • Remove tiny stones, sticks and other solid debris from the bottom of the well or basin. Make certain that the pump base can be supported on a stable, flat, and level foundation. If you need to put a concrete block or other type of support below the pump, you should deepen the well to accommodate this. For the pumping chamber, install a tight, child-proof basin cover.
  • The discharge pipe’s diameter must not be less than the diameter of the sewage pump’s discharge pipe connection opening
  • Otherwise, the discharge pipe will fail. If a check valve is not put in the pump’s discharge line, the pump will pump the same wastewater over and over again with each pumping cycle. The discharge line should be equipped with a check valve vent that is positioned at the right level. For more information, seeSEPTIC / SEWAGE PUMP DISCHARGE VENT. The installation of a gate valve or a ball valve before a Unicheck or a union on the pump discharge line is recommended to allow for service of the pump assembly.
  • In order to test the pump’s performance, turn on the electricity and fill the pumping chamber halfway with clean water.

Sewage, Grinder, SepticEfflulent Pump or Sump Pump Vent Opening RequirementsTurbulence

The weep hole, also known as the sewage / effluent / ejector pump discharge line vent hole, is designed to allow air held in the discharge line to be released at the start of a pump-on cycle. This vent helps to prevent clogging of the discharge line and failure of the pump seal. It is important to note that certain grinder pumps have a vent aperture located directly in the pump housing, opposite the float control. In spite of this, the vent in the discharge line is still necessary. The position of the weep hole vent for a typical grinder or effluent discharge pump discharge line is highlighted and circled in blue at the bottom left of our figure.

  • Zoeller points out that when this valve is installed, the installer will need to drill a 3/16-inch hole “(5mm) vent orifice in the discharge line at a height that is equal to or higher than the pump’s top.
  • When the pump is functioning, you should be able to see water squirting out of this aperture.
  • If a check valve is used in the installation, a vent hole (about 3/16 inch) must be provided “For the unit to be completely purge of trapped air, a hole must be bored into the discharge pipe below the check valve and pit cover.
  • Clogging of the vent opening should be examined on a regular basis.
  • Keep an eye out for: As a further precaution, Zoeller advises against the installation of vent holes on high-head sump or ejector pump installations: The presence of a vent hole in a High Head application may result in excessive turbulence.
  • If you decide not to drill a vent hole, be certain that the pump case and impeller are completely submerged in liquid before connecting the pipe to the check valve and that no air is being drawn into the pump intake through the inlet.
  • – Zoeller’s etymology (2009)

Set the Sewage Ejector Pump Float Control Switch

During the commencement of a pump-on cycle, air held in the discharge line can be released by the weep hole or sewage / effluent / ejector pump discharge line vent hole. Using this vent, you may avoid clogging of the discharge line and failure of the pump seal. It is important to note that certain grinder pumps have a vent aperture located directly in the pump casing, opposite the float switch. Despite this, the vent in the discharge line is still necessary to function properly and safely. The weep hole vent position for a typical grinder or effluent discharge pump discharge line is highlighted and circled in blue in our figure, which may be seen at the bottom left.

  • Because of the way this valve is positioned, Zoeller states that an additional 3/16-inch hole must be drilled during installation “The discharge line has a vent aperture (5mm) at a height that is equal to or higher than the top of the pump.
  • When the pump is functioning, you should be able to see water squirting out of this hole.
  • The installation of a check valve will need the creation of a vent hole (about 3/16 inch diameter) “The discharge pipe below the check valve and pit cover must be drilled in order to purge the unit of any trapped air.
  • Checking the vent hole for blockage should be done on a regular basis.
  • Attention, please: As a further precaution, Zoeller advises against using vent holes in high-head sump or ejector pump installations: For High Head applications, the vent hole could create an excessive amount of turbulence.
  • You should make certain that the pump case and impeller are completely submerged in liquid before connecting the pipe to the check valve and that no air is being drawn into the pump intake through the inlet valve.

REMEMBER: THE HOLE MUST ALSO BE BELOW THE BASIN COVER AND MUST BE CLEANED ON A REGULAR BASIS During the pump operation period, the waterstream will be visible via this hole. “Zeller” is an abbreviation for Zoeller’s last name (2009)

Guide to Non-Clogging Sewer Pumps

Grinders and non-clogging sewage pumps, sometimes known as “non-clogs,” work in a similar way to the grinder pumps outlined above, but they have a larger capacity and may transfer materials as large as 4 inches in diameter to a sewer main or waste management system. Pumps that do not clog are utilized in certain home installations, although they are more commonly found in business or community systems, as well as at SEWAGE PUMPING STATIONS.

See also:  How To Locate Septic Tank In Suffolk County Ny? (Best solution)

Reader CommentsQ A

John You are accurate in that you should not be able to smell sewer gas at that point since the sewage ejector station event that you are referring to is normally an air input valve rather than an air output valve. When determining if the sewage stench that you are noticing is flowing down from the rooftop vent is greater outside or whether you are smelling it more inside, it would be helpful to check whether there is a leak in a vent pipe or drain system in the building. I have a tiny holding tank in my basement that is below grade.

  • The tank has a little vent pipe on the side that leads into the basement, which is convenient.
  • However, anytime we take a shower anyplace in the home, we can smell the sewage coming from the rooftop ventilation pipe.
  • What could possibly go wrong?
  • Alternatively, is the grinder pump put directly on the basin bottom or is it hung a few inches above the basin floor?
  • Bob In a home plumbing drain system that is linked to a private septic tank and absorption field, a septic pump, which is most likely a sewage ejector pump assuming the proper pump was selected, pushes waste out of the drain system and into the septic tank and absorption field.

In the event that you don’t know whether or not your graywater is being directed to a separate location, and if you don’t have access to a septic/graywater system drawing and plan and can’t find one at your local building and zoning department, you’ll have to follow the pipes, which can be a difficult task if the pipes and the ground are frozen.

  • Is the second of the two “It is routed through the tank or through a conduit containing gray water that is pushed straight to the field.
  • See AIR ADMITTANCE VALVES (AAVs) for further information.
  • It is believed that he need the pump since the soil line is too close to the top of the crawl space for a Studor valve to be put at the minimum required height, according to him.
  • Does this seem realistic to you?
  • I’m not responsible for any of this, but I do want to provide the best advise I can in this situation.
  • dm It is not necessary to put the unit into the ground as long as it is securely supported against tipping and the elevations operate effectively in terms of drainage into the unit.
  • Is it necessary for the basin to be buried in the ground or may it be placed on the concrete floor?

Continue reading at theSEWAGE PUMP BUYERS GUIDEMANUAL website. Select a topic from the closely-related articles listed below, or browse the entireARTICLE INDEX for more information. Alternatively, consider the following:

SepticSewage Pump Articles

  • SEPTIC SYSTEM PUMPS
  • SEPTIC PUMP ALARM SYSTEMS
  • SEPTIC PUMP DUPLEX DESIGNS
  • SEPTIC PUMP INSPECTIONMAINTENANCE
  • SEPTIC PUMP INSTALLATION
  • SEWAGE PUMP BUYERS GUIDEMANUALS
  • SEWAGE PUMP DAMAGEREPAIR
  • SEWAGE ODOR SOURCE LOCATION
  • SEWA PUMPING STATIONS

Suggested citation for this web page

AT INSPECT A pedia.com, an online encyclopedia of building and environmental inspection, testing, diagnosis, repair, and issue avoidance guidance is available. Alternatively, have a look at this.

INDEX to RELATED ARTICLES:ARTICLE INDEX to SEPTIC SYSTEMS

Alternatives include asking a question or searching InspectApedia using the SEARCH BOXfound below.

Ask a Question or Search InspectApedia

We encourage you to use the search box just below, or if you prefer, you may make a question or remark in theCommentsbox below and we will get back to you as soon as possible. InspectApedia is a website that allows you to search for things. Please keep in mind that the publication of your remark below may be delayed if it contains an image, a web link, or text that seems to the program to be a web link. Your submission will appear when it has been reviewed by a moderator. We sincerely apologize for the inconvenience.

Technical ReviewersReferences

Citations can be shown or hidden by selecting Show or Hide Citations. InspectApedia.com is a publisher that provides references. Daniel Friedman is an American journalist and author.

How to Install a Septic Pump System

Septic tanks are used to process and dispose of waste products by homeowners who do not have access to municipal sewage systems. Maintenance and management of the septic system are the responsibility of the homeowner, which may include the installation of the system in some cases. There are some geographical situations where it may be required to place a septic tank at an elevation that is higher than the drainage basin in order to prevent sewage from backing up. During these occasions, an effluent pump is also required to pump sewage from one chamber of a septic tank to another chamber of the septic tank in order to verify that the septic system is functioning correctly.

  • 12-gauge electrical wire
  • High-water alarm
  • Conduit
  • Junction box
  • 15-amp standard breaker
  • Septic effluent pump, shovel, 20-amp Gfi breaker, pipe cleaner, plumber pipe dope, drainage pipe

Installing Circuit Breakers

Turn off the main breakers in the electrical panel by pressing the “Off” button on the main breakers. Ensure that the main disconnect at the meter is turned off, as well. When installing the circuit breakers, use a flashlight or a headlamp to see where you’re going.

Step 2

Install the GFI circuit breakers (20-amp) and normal circuit breakers (15-amp) in the existing breaker box. Take note of a black circuit wire that is secured in place with a screw. Loosen the screw and connect the black circuit wire to the circuit breaker, then tighten the screw back into place to complete the installation. In addition to the black circuit wire, there is a white neutral wire that is interlaced with the black circuit wire that should be connected to the GFI breaker.

Step 3

You may install circuit breakers on your own, without the assistance of an electrician, if you take the necessary safety precautions. Using a breaker box, insert the circuit breakers by holding them at an angle with the notched side towards the metal bar and pressing them into position.

Each circuit breaker’s notched side will slip into its respective opening. The contacts on the rear of the breaker make contact with the metal bus bars that are located in each breaker slot on the circuit breaker.

Underground Wiring and Outlet Installation

Install a junction box and a 20-amp outlet on a 4×4 post near the septic tank to keep it from overflowing. The septic pump is connected to the outlet, and the float wires for the high water alert are connected to the junction box. Ensure that the post is buried at least 16 inches deep and that it is secured with a little amount of concrete.

Step 2

For underground wiring, dig a 2-foot trench from the septic tank all the way back to the breaker panel. Depending on the distance, you may need to use a shovel or heavy gear. If you want to dig trenches, you can hire a contractor to do it.

Step 3

Run 12 gauge wire to the 20-amp outlet and 14 gauge wire to the junction box located on the post before connecting the two together. The other ends of the two wires are connected to the breaker boxes on either side of the breaker panel. Both wires should be routed through conduit. When the 12-gauge wire from the sump pump output is connected to the 20-amp GFI breaker, the sump pump is activated. The standard breaker is connected to the 14-gauge wire that was utilized for the alarm float wiring.

Pump and Alarm Setup

Secure the float switch for the high water alert inside the septic tank using a tie strap or the supplies provided. Set the float switch to the appropriate water level height and secure it. The wiring for the float switch will be routed to a junction box on the post and connected to a 14-gauge wire that will be routed back to the breaker box. Install the remaining components of the high water alarm system in accordance with the manufacturer’s instructions.

Step 2

Connect the discharge line to the pump’s outlet on the submersible septic tank. Pipe cleaner should be used to clean the pipe should, and it should be allowed to dry fully before being connected to the pump. To connect the pipe to the pump, use pipe dope and fittings to secure the connection. If possible, the pipe should be cut to the same length as the height of the septic tank, with one end of the pipe connecting to the drainage pipe that will carry waste water to the distribution tank after the pump is in place.

Step 3

Lower the septic effluent pump into the tank with the help of a rope or a cable attached to it. Attach the rope or cable to a nearby post using a bungee cord. Connect the top piece of the drainage pipe to the segment of drainage pipe that leads to the distribution tank, and allow the pipe dope to dry completely before turning on the system to drain the water.

Tip

Silicone should be used to seal off all junction boxes and couplings throughout the conduit run to avoid corrosion, water damage, and insect damage. Construct a conduit from the ground up to the outlet and junction box for the pump and float cables in order to make the area completely watertight. Consult with a building or plumbing inspector to ensure that the installation is sound before turning on the system.

Warning

The breakers should not be turned back on until the entire septic pump installation is complete. When installing circuit breakers, make sure that they do not come into touch with the main circuit bus bar that is located within the electrical circuit.

Even if the power is turned off, this bar will maintain its energy. When there is any concern regarding the safety of a person, electrical and plumbing repairs should be performed by professional professionals.

Septic System Pump Chamber Basics!

Buying or selling a home and discovering that your septic system is experiencing difficulties pumping trash to the septic tank? Is it necessary for your new system to have a pumping system? What is the operation of a septic pumping system? In order to address your inquiries, All-Clear SepticWastewater Services has compiled some basic information for your convenience. It is necessary to install a septic pumping system when a typical gravity feed system will not function properly owing to the condition of the soil surrounding the property or because the accessible space is located uphill from the septic tank.

  1. It is essential that the suitable pump is used in each case and that it is sturdy enough to handle the projected volume of material to be transported.
  2. It might be that raw sewage must be pushed directly to the septic tank, that processed wastewater must be piped directly to the leaching region, or that a pressured system must be installed in which the effluent is pumped substantially above the tank’s level.
  3. To do this, any raw sewage particles should be kept from blocking the pump or moving into the leaching zones.
  4. After the pumping system has been appropriately placed in the tank, the issue of pipe heights and slopes, as well as the length between the pump and the “drop box,” must be addressed.
  5. There are various approaches that may be used to accomplish this.
  6. The soil composition must be known by the engineer in order to eliminate any possibility of erosion, pollution, or flow back onto the land.
  7. The engineer, in consultation with local inspectors and regulators, will make the final decision on whether or not to incorporate a pump system in the design.

If you have any concerns or would like additional information about your septic system, or if you would like to read the whole white paper on this subject, please contact All Clear SepticWastewater Services at 508-763-4433 or [email protected]. This blog was first published on July 22, 2015.

How to Install a Septic System

Documentation Download Documentation Download Documentation In rural regions of the nation where waste water treatment is not accessible, private on-site wastewater treatment systems (POWTS), also known as septic systems, are utilized largely to treat waste water. Gravity fed/conventional systems are divided into two broad categories: 1. gravity fed/conventional systems and 2. alternative (pump) systems, which include aerobic treatment units (ATUs.) In most cases, electric pumps are used in alternative systems.

However, in many health jurisdictions across the United States, it is still feasible for an individual property owner with heavy equipment operation skills to utilize a backhoe to establish a septic system on their land.

Steps

  1. 1 Make a plan and design for your system. Performing a site survey and conducting a percolation (soil) test on the area where the POWTS is to be placed are both required initial steps in any septic system installation. In order to create a system, it is necessary to first gather information from surveyors and conduct a soil test. It is then possible to submit an application for the necessary permissions and approvals.
  • The following are some of the conclusions from the site survey that have an impact on the design:
  • Available space
  • Terrain
  • Intended purpose and projected water demand depending on the size of the residence or building that the system will serve
  • Location of the well and/or nearby wells
  • And other factors.
  • The following are examples of soil test findings that have an impact on the design:
  • The soil type and layering (sand, clay, rock, and where it is placed in relation to depth)
  • The soil’s ability to drain and filter wastewater
  • And the soil’s ability to drain and filter wastewater
  1. 2Wait for clearance before proceeding. The system may be deployed once all of the relevant permissions and approvals have been obtained. Make certain that all of the steps listed below are carried out in accordance with all applicable laws, plumbing rules, and building codes. Advertisement

Please keep in mind that the following procedure assumes that the system is being installed for the first time and not as a replacement.

  1. 1 Assemble the equipment and tools that will be used throughout the dig. You will require the following items:
  • Backhoe, laser transit, and grade pole are all included. A 4″ Sch. 40 PVC pipe (and fittings, if necessary)
  • A 4″ ASTM D2729 perforated pipe
  • A 4″ASTM D3034 pipe and fittings
  • A 4″ Sch. 40 vent cap and test cap
  • PVC primer and adhesive
  • A 4″ Sch. 40 vent cap and test cap The following tools will be required: Saw (either hand saw or cordless reciprocating saw)
  • Hammer drill and bits (for drilling through walls if necessary)
  • The following items are required: hydraulic cement (to seal surrounding pipe if pipe is going through wall)
  • Shovel
  • Stone measuring an inch and a half and cleaned (amount varies depending on system size)
  • Tape measurements (both ordinary and at least a 100-foot-long tape)
  • Septic fabric (cut to 3′ length or less from a roll)
  • Septic tank and risers (concrete or plastic if allowed)
  • Riser sealant such as Con-Seal (for concrete) or silicone caulk (for plastic)
  • A septic filter (such as a Zoeller 170 or similar) if one is necessary
  • A distribution box (either concrete or plastic, if more than two laterals are being run)
  • And a septic tank.
  • 2 Determine the location of the entrance to the building in relation to the location of the septic tank. Make an excavation at least 2 feet deep and drill a hole through the wall, or go deeper and drill a hole beneath the footing, depending on your preference or the need. Because this is precisely what a gravity-fed system is designed to accomplish, expect the flow to continue to flow downhill from here. When transferring waste from the tank to the drain field, it does not employ any mechanical methods other than gravity.
  • The pipe should be 4″ Sch. 40 and should extend at least five feet outside the structure toward the tank, either through the wall or beneath it. Set it level where it will pass through a wall or under a footing, and from there, run it with approximately 1/8″ of pitch (slope) every foot of length toward the septic tank until it reaches the tank. If necessary, go even farther into the tank or all the way into the tank. If this is the case, switch to 4″ 3034 with the appropriate adaptor and pipe 3034 toward the tank.
  • Make sure you use a test cap on the end that will be entering the building. It is recommended that if you are going through a wall, you seal the area around the hole with hydraulic cement both inside and outside
  • Do not run too much pitch out to the tank. If there is an excessive amount, the water will run away quicker than the sediments, resulting in the solids remaining in the pipe. Additionally, depending on the depth of your drain field and how close it will be to the tank’s outflow, there may not be enough pitch to get to the drain field.
  • 3 Dig a hole large enough to accommodate the installation of the concrete aerobic tank below ground. Make use of the laser transit to “shoot” the top of the pipe that leads out to the tank with the laser. The distance between the top of the intake and the bottom of the tank is measured in feet and inches. To the number you fired off the top of the pipe, add this (go up on the grade pole) + 1 1/2″ to get the total. The depth of the grade pole has now been adjusted to the desired depth. Using this, continue to drill the hole to the desired depth
  • Prepare your leech field by laying it out and excavating it according to the results of the test performed during the permit application procedure. Maintaining a good flow between the tank and the drain field should be considered when planning out and digging the tank.
  1. 4Use “inch-and-a-half cleaned drain rock” from a neighboring gravel dump to surround the pipe, which is required in most areas. This is necessary in order to keep the pipe stable. For further information on the size of embedment and gravel required, check with your local health department. Five-inch perforated pipe in a gravity drain field does not have a slope from one end to another and has capped ends
  2. Once you have received a green sticker from the health inspector, you must cover the pipe and tank. All places, subject to the restrictions of the local health authority, will be required to cover the drain rock with a specific filter fabric, newspaper, four inches of straw, or untreated construction paper before backfilling. Advertisement
  1. A pump chamber after the septic tank should be installed The pump chamber, also known as a pressure tank or dosing tank, is where the electric pump is housed, which is responsible for transporting wastewater from one location to another and finally into the drain field for final disposal.
  • Set up the pump chamber in the same manner as you would a septic tank. The effluent pump and floats are housed in the pump chamber, and they are responsible for pumping the effluent out to the drain field at predetermined or scheduled intervals. This is a hermetically sealed system. To ensure that the electrical installation complies with state standards, it is frequently necessary to hire a qualified electrician. It is important to remember that in places with high groundwater, the pump chamber or additional ATUs may remain essentially empty for long periods of time, and that these tanks may need to be safeguarded from floating by the installation of additional weight or other protective features.
  1. Secondly, all construction details, including the layout of all sewers outside of the home, the location and depth of all tanks, the routing and depth of pressurized effluent lines, and other system components, such as the drain field and any additional ATUs, must be consistent with the septic system plans approved by the local county health department. Cover the tank and pressurized lines once the inspector has given his final clearance and the system has been turned on. Advertisement
See also:  What Would The Field Lines Look Like On A Septic Tank? (TOP 5 Tips)

Create a new question

  • Question I had a tank put, but it isn’t level with the ground. What will be the ramifications of this, and should it be leveled? It is necessary to keep the tank level. It is difficult to predict what it will have an impact on because we do not know which direction it is off level. Question Is it necessary to be concerned about tree roots growing into the drainage area when using a gravity flow kind of tank? Whether or whether you have lateral lines is dependent on the kind of trees that are growing close or above them. Tree species that tend to extend roots into the lateral lines and obstruct them are known as ramifications. Due to the fact that they are buried deep in the ground and surrounded by a pocket of gravel that allows waste water to drain out, they are rarely affected by grass, weeds, and shrubs. Question What is the maximum depth that a pipe may be lowered into the leech bed? The majority of systems require 12 volts “in the form of rock The perforated pipe should be suspended in the top area of the rock
  • It should not be touching the rock. Question Maintaining a lush green grass on or above your pitch is it safe, or is it a good practice? According to what I’ve heard, brown or dead grass is preferred so that your field can breathe more easily. It is necessary for your field to take a breath. The presence of green grass across your field indicates that it is functioning well. With lush grass covering your field, it will be able to breathe. There should be no planting of woody shrubs or trees over the leach field. Question What is the recommended distance between the septic tank and the house/boundary? A minimum of fifty feet is required. States have different laws, but this is the most common distance
  • Nonetheless, other states have stricter laws. Question What is the average amount of soil that goes into a residential leach field? It is dependent on how chilly it becomes. There are no less than 12 in the northern United States “in the leach field’s surface
  • Question Is it possible to build a septic system during the cold months? What you should do will depend on whether or not you reside in a place where the ground freezes. Question What amount of water should I put in the tank to get it going? None. A typical tank holds 1,000 gallons and will fill up quite quickly if used on a regular basis. When liquid effluent is discharged to the drain field, the goal is to catch and pre-treat particles that have accumulated. It is possible that a pump system will require water to prime the pump. Question There is a misalignment between my septic field’s underground line and the pipe on the tank. Is it OK to utilize a 90-degree elbow on my septic tank? As long as you have decent downhill flow, you should be fine. Instead of using a 90, I would use two 45s. Question If I’m installing a septic system, when should I contact an inspector? Immediately following system installation but before earth is used to cover the system in place Always check with the inspector ahead of time to verify that they can satisfy your inspection needs

More information on the replies Inquire about something There are 200 characters remaining. Include your email address so that you may be notified when this question has been resolved. SubmitAdvertisement

  • The use of aerobic bacterial additions (which are available at most DIY stores) to maintain a healthy and well functioning system, as suggested by producers on a periodic basis, is contentious. The septic tank is an anaerobic (wet) environment in which the majority of yeasts and other additions will have little or no effect on the sewage being processed. When it comes to installing septic tanks, some old school installers believe that placing an additive, a shovel of muck, or even a dead cat in an empty tank will “start” the process. What naturally enters the tank serves as the only thing that is necessary. The aerobic (wet or dry) component of the system consists of hundreds of square feet of drain field, where additives will do little help even if they make it all the way to the end of the system. The use of chemicals in septic systems has not been the subject of an independent research that has been published in a respectable scientific publication anywhere in the world, including this nation. This will mostly certainly be confirmed by your local health department. Each phase of the building process will almost certainly include an examination by a health inspector before the work can be completed or covered up. On pressurized lines, the use of a sand embedment is recommended in order to reduce the amount of damage caused by moving soil that has a high concentration of clay. When pumps are turned on and off, pressurized lines might move as well. Four inches (10.2 cm) of sand bedding on all four sides of the lines will prevent sharp pebbles from the ground or backfill from wearing holes in the pipe over time
  • And

Thank you for submitting a suggestion for consideration! Advertisement

  • Keep the perforated pipe for the leech field in a vertical position while installing it to avoid having the holes in the pipe turn downward. It is necessary to lay the perforated drain field pipe ASTM 2729 dead level, so that the printed line on the pipe is facing up. The perforations on both sides of the pipe are on both sides of the pipe. All of the sections of perforated pipe are cemented together, and the ends of each leach line are capped to complete the installation. So, when waste water enters the pipe, it will fill the pipe to the height of the perforations and overflow from ALL of the holes, utilising the whole leach field as a means of treatment. In certain health authorities, you can utilize waste water to water grass or decorative plants, trees, vegetable gardens, and fruit trees if you place the perforated pipe on a slope. However, the water must first be cleaned by the system (tertiary treatment includes disinfection) in order to prevent pathogens (germs) from the septic system from being discharged into the environment throughout the process. Make sure to check with your local health authority to verify if the practice known as “reuse” is permitted in your community.

Advertisement

Things You’ll Need

  • The following tools are required: backhoe tractor, trencher, shovel, contractor’s laser level and rod, or a surveyor’s transit. Septic tanks
  • PVC pipe with perforations
  • Material for embedding
  • PVC adhesive, PVC fittings, and a septic tank outlet filter are all included. Hand saw
  • Course file
  • Sandpaper If necessary, effluent pumps and floats are installed. If an alternate system is used, a control panel is installed.

About This Article

The writers of this page have together authored a page that has been read 499,453 times.

Did this article help you?

When it comes to septic tank pumps, what’s the difference between them and do you really need one in your system? Here’s a brief guide to septic tank pumps: there are three major types of septic tank pumps: a sump pump, a septiceffluent pump, and a grinder pump. A sump pump is the most common type of septic tank pump. We’re pleased to assist you in determining whether or not you require one of these pumps in your septic system. Note: This is only a short reference and not an in-depth how-to; always contact us before attempting to fix an aseptic tank problem on your own.

Septic Tank Sump Pump

Sump pumps, also known as de-watering pumps, are often used in extremely wet areas to remove excess water from basements and foundations as a result of major weather events. This is a pump that is used primarily for insurance purposes, to ensure that buildings preserve structural integrity even in extremely wet situations. Sump pumps are occasionally used in septic systems, however they are utilized seldom since there are better options available if a pump is required.

Septic Tank Grinder Pump

Have you ever wondered how the process of pumping septic uphill is accomplished? Use a Grinder pump to get the job done. It is the purpose of these septic tank pumps to grind and transfer black water or sewage from one location to another, grinding the sediments so that everything fits into ordinary pipe (typically 2″ in diameter).

In most cases, the grinder pump is positioned directly in the aseptic tank itself. Septic tank grinder pumps are required in this situation because black water is being sent uphill to a septic tank, municipal sewer system, or wastewater pumping center via the sewage pumping center.

Sewage Tank Effluent Pump

They are solely designed to carry cleared effluent from a septic chamber (not a tank) to a drain field and are not intended to be used in conjunction with a tank. You should use caution if you are pumping cleared effluent from a septic pumping chamber (meaning a separate holding place downstream from the main septic tank). The removal of this pump from the tank, which contains solids and scum, is vital due to the fact that it is incapable of breaking down solids. Before installing a septic tank pump in your system, ALWAYS consult with a professional septic tank service provider first to ensure that the pump is appropriate for your system.

See also:  What To Use For Roots In Septic Tank? (TOP 5 Tips)

Whether you have concerns regarding your septic system, the possibility of requiring a pump, or the expenses associated with installing a pump for yourseptic system, we will be happy to answer them.

As always, if you have questions about your septic tank system or needservice, please give us a call at(260)-982-7111.

Our pump truck is waiting for you, fully stocked and ready to get to work for you right away. Having cutting-edge equipment that can get the job done when others are struggling is something we take great pleasure in.

RV Pumping

If you have a recreational vehicle and are unable to move it, we can provide pumping services for your vehicle. To prevent your waste tank from being sucked flat during the operation, a specific connection must be used. Our vehicles are well equipped and prepared for the job.

Inspection Camera Work

If you are concerned about a possible problem and would want to get a better look at it before investing a lot of time and money on it, you may want to consider employing our camera equipment to get a better look at it. Before you start digging, make sure you’re making the appropriate choice.

Baffle Replacement

Septic tanks are nothing more than enormous solids-collection containers. Baffles are a component of a septic tank that helps to keep sediments contained. When baffles are missing, incorrectly fitted, or degraded after years of exposure to hydrogen sulfide gas, which is found in all septic tanks, it is recommended that they be removed and replaced.

Filter Installation

Having a filter put on the outflow of your sewer system is another method of keeping sediments contained in your septic tank. Filters like this are reusable and simple to clean. By keeping tiny solid particles from leaking into your pump chamber or drain field, you may extend the life of your septic system by many years or more.

Riser Installation

The use of rippers is mandatory on all new septic systems, and they may be retrofitted to older septic systems as well. Risers are devices that raise the lids of septic tanks to the surface of the ground. Inspections, maintenance, and pumping access will be much easier as a result of this. There aren’t many firms nowadays that will find and dig for free.

The money you would have spent on excavating and finding will be used to pay for your riser installation over the course of time. Not to add the time saved if you have a backup tank and need to get to the tank quickly when you don’t have one.

Submersible Pump Replacement

Septic systems are growing more sophisticated than they have ever been before. In many septic systems, one or more submersible pumps are included as part of the overall system. The pumps in question are electromechanical devices. They require the services of a service specialist to properly connect them to the water supply and set the floats in accordance with the design specifications. The electrical work is next required to be completed by a licensed electrician in the labor business.

Drain Field Installation / Repair

If you want a septic system repair or a complete installation, we are capable of meeting your requirements from start to finish.

Inspections

We are completely competent of doing inspections for a variety of clients.

  • Home sale
  • County health department approval required
  • Septic system certifications required

Contracts for operation and maintenance (OM) are now available to satisfy the needs of your systems, which are being implemented by the County Health Department.

  • Contracts for operation and maintenance (OM) are now available to suit the needs of your systems, which are being implemented by the County Health Division.

For all of your unsolved issues, symptoms, and problems related to your septic system, we can provide system troubleshooting and guidance. When you have a problem with your septic system, let our years of knowledge guide you to the most cost-effective solutions.

Preferred Customer Program

Superior is assisting you in lessening the impact of growing septic system maintenance expenses on your pocketbook. I am pleased to offer you this tool, which allows you to set money aside in a trust account for the sake of system maintenance. Call and ask for further information at 425-905-2485.

Tank Locating

We can locate almost any tank using the most up-to-date electronic devices. Simply flush a transmitter and follow it to the tank to complete the process.

Main Line Cleaning (jetting)

Using soap and disposing of grease from clothing and dishes add to the accumulation of sediment in the main line leading to the septic tank, which can cause it to back up and overflow. This buildup will cause drainage to become sluggish and eventually back up into the residence. Every six years, it is suggested that you have your line cleaned. Line cleaning equipment with a high volume and pressure scours the line like new and then draws the loosening material back to the tank using our high volume and pressure equipment.

It is recommended that the line be cleaned every other time if your septic system is on a three-year inspection and pumping plan.

Trap Clear

Using soap and disposing of grease from clothing and dishes add to the accumulation of waste in the main line leading to the septic tank, which can cause it to back up and overflow. Eventually, this accumulation will result in delayed drainage, which will back up into the home, causing flooding. Once every six years, it is advised that you have your hose cleaned. Line cleaning machinery with a high volume and pressure scours the line like new and then draws the loosening material back to the tank.

Your house is not required for this. It is recommended that the line be cleaned every other time if your septic system is on a three-year inspection and pumping cycle. Please continue to empty those pipes!

Pump Systems

Installation of a demand flow pump for a residential sewage system in Virginia is shown in the drawing as a ‘typical’ installation. The fact is that for many years, this was practically the only form of pump system that was offered to consumers. Because it is still a fairly prevalent form of system, we will use it as a starting point for teaching how pump systems operate in general. The system is made up of a number of critical components. Let’s start with the pump chamber and work our way down.

  1. The septic tank’s effluent is drawn into the pump chamber by gravity.
  2. The septic tank is responsible for liquifying wastewater and retaining the majority of particles.
  3. The pump is represented as a blue box-like item at the bottom of the tank.
  4. The pump is used in certain systems to disperse effluent equally, while other systems rely on the pump to simply overcome elevation differences.
  5. When it comes to residential systems, it’s uncommon to find pumps with capacities less than 1/4 horse power or greater than 1/2 horse power.
  6. The “pump enable/off” float is the lowest of the floats.
  7. This implies that the pump can operate when both the middle or pump ‘on’ floats are tipped to the on position at the same time.

On a typical operation, wastewater from the septic tank fills the pump chamber, with effluent being maintained between the two bottom floats by the pump control valves.

A four-bedroom house produces between 150 and 600 gallons of effluent every day, depending on the size of the residence.

Most 1,200-gallon septic tanks have a liquid depth of 48 inches, which means that each inch of liquid depth is equivalent to around 22 gallons.

Normally, the floats are closer to the 7′′ distance than the 22′′ distance in terms of value.

sewage is corrosive, but sewer fumes are even more corrosive.

However, a larger tank would allow for more pumping capacity, but a larger tank is more expensive, and there is no benefit to administering a larger dosage other than increased expense.

If, for any reason, the pump does not start when the ‘on’ float is tipped to the right, the high water alarm will sound an audio visual warning to alert the user that there is a problem with the pump and to alert the user that the pump is not working.

This can be extended to a day or longer if water saving measures are strictly adhered to.

The length of time it takes for the tank to fill varies on a variety of factors, including the number of people who are using the system, the size of the tank, how strict the users are with their water consumption, and other variables.

What do I do if My Septic Alarm is Going Off?

In the event that your septic alarm goes off, it may surely create some anxiety and uncertainty; and if you happen to be experiencing this right now, then you’ve arrived to the correct location! Don’t be concerned; it does not necessitate urgent action. Instead, take your time to go through this full essay so that you will be prepared to act now or in the future if the situation arises. What Septic Systems Are and How They Work The alarm works in conjunction with the septic system to alert you when the water level within the pump tank has increased to an unsafe level or has decreased to an unsafe level.

  1. The timer is in charge of regulating the time intervals during which the pump is permitted to pump wastewater into the drainage system.
  2. Thus, during periods of excessive water use, the drain field is kept from getting overflowing, which might cause damage to the drainage system.
  3. A large amount of water is injected into the system in between pumping cycles for whatever cause, and the water has nowhere else to go but back into the system’s pump tank.
  4. Depending on how much water was and continues to be put into the system and how the pump is set up to operate on a timer, it may take many pumping cycles until the water levels are returned to normal.
  1. If you’ve ever had your septic alarm go off, you know how much stress and uncertainty it can create. If you’re now experiencing this, you’ve come to the perfect spot! Don’t be concerned
  2. It does not necessitate urgent action. Instead, take your time to go through this full essay so that you will be prepared to act now or in the future if the situation warrants. What Septic Systems Are and How They Function In conjunction with the septic system, this alarm is designed to alert you when the water level within the pump tank has increased over a certain level or decreased below a certain level. All septic systems with pumps are required to have some type of timer installed. Using a timer, you may control how much wastewater the pump is permitted to pump into the drain field at different times of day. At certain periods of the day, these precise time intervals will occur. Thus, during periods of excessive water use, the drain field is prevented from getting flooded, which might cause damage to the drainage system. How Does a Problem Occur When There Is One? A large amount of water is brought into the system in between pumping cycles for whatever cause, and the water has nowhere else to go but back into the system’s storage tank. As a result, the water level within the pump tank will rise until the timer enables the pump to be turned back on. It may take many pumping cycles until the water level in the system returns to normal levels, depending on how much water was and continues to be injected into the system during the time intervals specified by the timer. Causes of the alarm going off that might occur
  1. If you’ve ever had your septic alarm go off, you know how much stress and uncertainty it can create
  2. And if you’re now experiencing this, you’ve come to the correct spot! Don’t worry, it does not necessitate instant action
  3. Instead, take your time to go through the full text so that you will be prepared for anything may arise in the future. How Septic Systems Function The alarm works in conjunction with the septic system to alert you when the water level within the pump tank has increased to an excessively high or low level. Septic systems with pumps are almost always equipped with some form of timer. The timer is in charge of regulating the time intervals during which the pump is permitted to pump wastewater into a drain field. These exact time intervals occur at critical points throughout the day. The drain field will not overflow during any period of elevated water use, which might cause damage to the drain field. What Takes Place When There Is a Problem The pump tank will be the only place for the water to go if a large amount of water is put into the system between pumping cycles for any reason. As a result, the water level within the pump tank will rise until the timer enables the pump to be restarted. Because the timer only enables the pump to operate for specific periods of time, it may take multiple pumping cycles until the water level is returned to normal, depending on how much water was and continues to be injected into the system. Possible causes of the alarm going off
  1. It’s possible that one of the components of the septic system is malfunctioning. If anything goes wrong with your system — including the pump and floats — the alarm and timer will go off and the septic system will stop working correctly.

The Best Thing to Do If Your Alarm Goes Off Alternatively, if you hear an alert, you should press the red button or turn on the alarm box. The alarm will be turned off as a result of this action. There should be a red light and a green light on the alarm box, which should be situated someplace on the unit. The green light indicates that the alarm is operational and should be left on at all times. It is shown by a red light if the alarm is getting a signal from the pump tank indicating that the water level is increasing above or decreasing below what is expected.

If the breaker occurs to be tripped, look around the septic tanks to see if there is any standing water.

It is possible that the red light on the alarm box will go out on its own after allowing the septic system to operate for a couple of pump cycles (which should take approximately 10-15 hours).

If the red light turns off, it signifies that the system is operating properly and that it only needs to catch up with the extra water that has overflowed into the storage tank.

To be clear, an alarm signal from the septic system does not always imply that sewage is about to back up into the house right away.

Do you require septic system repair on a regular basis or emergency service?

To arrange an appointment, please call (804) 581-0001 or send us an email through our contact page. Want to learn more about septic systems? Explore our septic system web sites by clicking on the “Septic” navigation option in the top navigation bar.

Leave a Comment

Your email address will not be published. Required fields are marked *