How To Install The Plumbing To A Septic Tank? (Solution)

  • Pipe 4″ Sch. 40 going a foot through the wall or under the footing, and to a minimum of five feet outside the building toward the tank. Set it level where it’s going through the wall or under the footing, and from there run with about an 1/8″ per foot of pitch (slope) toward the septic tank. Go further or all the way into the tank if required.

How do you tap into an existing septic tank?

Use a 4-inch pipe to connect the two septic tanks. Place this pipe into the inlet hole of your new septic tank before you lower it into the ground. After you’ve lowered your new septic tank, insert the other end of the pipe into your old septic tank’s outlet hole.

What kind of pipe do you use from house to septic tank?

Laying Out a Septic-Tank Disposal System. The septic tank should be positioned at least 50 feet from the house proper. ABS or PVC plastic or cast iron pipe can be used to connect the tank to the house drainage system.

Can you add a bathroom to an existing septic system?

When planning to add a toilet to your septic system, it’s important to contact the building authorities to find out if you can do it. Some jurisdictions base septic system size on the number of toilets serviced, and it’s illegal to exceed this number without upgrading the tank or leach field.

How deep should septic pipes be?

A standard leach line is considered to be three (3) feet wide and three (3) feet deep with a length as required.

How do you seal a septic outlet pipe?

The tar sealant can be used to fill the void between the concrete and pipe. Use a trowel to press the sealant into the void. If the rubber gasket is molded into the tank for the pipe, tighten it up.

What size pipe goes into septic tank?

Four-inch pipe is standard, and it should extend far enough under the house to connect with the main soil stack, which is a 3-inch pipe that extends vertically past the main bathroom and through the roof.

How deep is the septic tank outlet pipe?

After the solids settle out, effluent leaves the septic tank through the outlet pipe and flows to the drain field. The outlet pipe should be approximately 3 inches below the inlet pipe.

Why the inlet pipe in the septic tank is higher than the outlet pipe?

Level the septic tank: The septic tank inlet tee is designed to be higher than the septic tank outlet tee. This helps assure that incoming sewage clears the baffle and enters the tank correctly, while outgoing effluent does not carry along floating solids, scum, or grease (which would clog the drainfield).

Do I need to upgrade my septic tank?

Under the new rules, if you have a specific septic tank that discharges to surface water (river, stream, ditch, etc.) you are required to upgrade or replace your septic tank treatment system to a full sewage treatment plant by 2020, or when you sell a property, if it’s prior to this date.

Can you add a pump to a septic tank?

A sump pump may be needed if the septic tank is built above the building or to the drain field is above the septic tank. The sump pump needs its own separate electrical line preferably with a waterproof outlet. There are two main types of sump pumps depending on the needs of the homeowner and the septic system.

What are the sizes of septic tanks?

Standard tank sizes are typically 1,000, 1,250 and 1,500 gallons, and these suit most homes. Typically, the minimum tank liquid capacity of a one- to three-bedroom home is 1,000 gallons.

How far down is a septic tank lid?

Often, septic tank lids are at ground level. In most cases, they have buried anywhere from four inches to four feet underground.

What is the fall on a 4 inch sewer pipe?

For 4-inch PVC piping and a building sewer less than 50 feet long, the minimum slope is 1 inch in 8 feet, or 1/8-inch per foot, and the maximum is 1/4-inch per foot. For sewers longer than 50 feet, the slope should be 1/4-inch per foot.

How far down is a leach field?

A typical drainfield trench is 18 to 30 inches in depth, with a maximum soil cover over the disposal field of 36 inches.

How to Install a Septic System

Documentation Download Documentation Download Documentation In rural regions of the nation where waste water treatment is not accessible, private on-site wastewater treatment systems (POWTS), also known as septic systems, are utilized largely to treat waste water. Gravity fed/conventional systems are divided into two broad categories: 1. gravity fed/conventional systems and 2. alternative (pump) systems, which include aerobic treatment units (ATUs.) In most cases, electric pumps are used in alternative systems.

However, in many health jurisdictions across the United States, it is still feasible for an individual property owner with heavy equipment operation skills to utilize a backhoe to establish a septic system on their land.

Steps

  1. Read More About ItRead More About It In rural regions of the nation where waste water treatment is not accessible, private on-site wastewater treatment systems (POWTS), also known as septic systems, are utilized largely to treat wastewater. Gravity fed/conventional systems are divided into two broad categories: 1. gravity fed/conventional systems and 2. alternative (pump) systems, which include aerobic treatment units and other components (ATUs.) Electric pumps are commonly used in alternative systems. Because of the possible harm to the environment posed by contamination of the watershed, this project is advised for a professional with relevant experience. However, in many health jurisdictions around the United States, it is still possible for an individual property owner with heavy equipment operation skills to build a septic system with a backhoe.
  • The following are some of the conclusions from the site survey that have an impact on the design:
  • Available space
  • Terrain
  • Intended purpose and projected water demand depending on the size of the residence or building that the system will serve
  • Location of the well and/or nearby wells
  • And other factors.
  • The following are examples of soil test findings that have an impact on the design:
  • The soil type and layering (sand, clay, rock, and where it is placed in relation to depth)
  • The soil’s ability to drain and filter wastewater
  • And the soil’s ability to drain and filter wastewater
  1. 2Wait for clearance before proceeding. The system may be deployed once all of the relevant permissions and approvals have been obtained. Make certain that all of the steps listed below are carried out in accordance with all applicable laws, plumbing rules, and building codes. Advertisement

Please keep in mind that the following procedure assumes that the system is being installed for the first time and not as a replacement.

  1. 1 Assemble the equipment and tools that will be used throughout the dig. You will require the following items:
  • Backhoe
  • Transit using lasers and a grade pole
  • 4 “PVC pipe (and fittings, if necessary) in size 40
  • 4 “Perforated pipe in accordance with ASTM D2729
  • 4 “Pipe and fittings according to ASTM D3034
  • 4 “scholastic scholastic scholastic scholastic scholastic scholastic scholastic scholastic scholastic 40 vent caps and test caps are included. Primer and adhesive made of PVC
  • Tool for cutting wood (either a hand saw or a cordless reciprocating saw)
  • Hammer drill with bits (in order to drill through a wall if required)
  • The following items are required: hydraulic cement (to seal surrounding pipe if pipe is going through wall)
  • Shovel
  • Stone measuring an inch and a half and cleaned (amount varies depending on system size)
  • Tape measurements (both ordinary and at least a 100-foot-long tape)
  • Fabric for septic tanks (reduce a roll to around 3′ length)
  • Drainfield and risers (concrete or plastic if permitted)
  • Septic tank and risers Sealing risers using Con-Seal (for concrete) or silicone caulk (for plastic) is recommended. If necessary, a septic filter (such as a Zoeller 170 or equivalent) should be used. If there are more than two laterals, a distribution box (either concrete or plastic) is required.
  • 2 Determine where you want to enter the building in relation to where you want to install the septic tank. Excavate to a depth of at least 2 feet and drill a hole through the wall, or go deeper and drill a hole under the footing, whichever is desirable or necessary. Because this is precisely what a gravity-fed system is designed to accomplish, expect the flow to continue to flow downhill from here. When transferring waste from the tank to the drain field, it does not employ any mechanical methods other than gravity.
  • Finding the location where you want to get into the building in relation to where you want to put the septic tank is step two. Dig down at least 2 feet deep and drill a hole through the wall, or go deeper and drill a hole under the footing, whichever is preferred or required. Because this is precisely what a gravity-fed system is designed to accomplish, anticipate the flow to continue to flow downhill from here. In order to discharge the waste from the tank to the drain field, no mechanical mechanism other than gravity is employed.
  • Make sure you use a test cap on the end that will be entering the building. It is recommended that if you are going through a wall, you seal the area around the hole with hydraulic cement both inside and outside
  • Do not run too much pitch out to the tank. If there is an excessive amount, the water will run away quicker than the sediments, resulting in the solids remaining in the pipe. Additionally, depending on the depth of your drain field and how close it will be to the tank’s outflow, there may not be enough pitch to get to the drain field.
  • 3 Dig a hole large enough to accommodate the installation of the concrete aerobic tank below ground. Make use of the laser transit to “shoot” the top of the pipe that leads out to the tank with the laser. The distance between the top of the intake and the bottom of the tank is measured in feet and inches. To the number you fired off the top of the pipe, add this (go up on the grade pole) + 1 1/2″ to get the total. The depth of the grade pole has now been adjusted to the desired depth. Using this, continue to drill the hole to the desired depth
  • Prepare your leech field by laying it out and excavating it according to the results of the test performed during the permit application procedure. Maintaining a good flow between the tank and the drain field should be considered when planning out and digging the tank.
  1. 4Use “inch-and-a-half cleaned drain rock” from a neighboring gravel dump to surround the pipe, which is required in most areas. This is necessary in order to keep the pipe stable. For more information on the size of embedment and gravel required, check with your local health department. Five-inch perforated pipe in a gravity drain field does not have a slope from one end to another and has capped ends
  2. Once you have received a green sticker from the health inspector, you must cover the pipe and tank. All places, subject to the restrictions of the local health authority, will be required to cover the drain rock with a specific filter fabric, newspaper, four inches of straw, or untreated construction paper before backfilling. Advertisement
  1. A pump chamber after the septic tank should be installed The pump chamber, also known as a pressure tank or dosing tank, is where the electric pump is housed, which is responsible for transporting wastewater from one location to another and finally into the drain field for final disposal.
  • Set up the pump chamber in the same manner as you would a septic tank. The effluent pump and floats are housed in the pump chamber, and they are responsible for pumping the effluent out to the drain field at predetermined or scheduled intervals. This is a hermetically sealed system. To ensure that the electrical installation complies with state standards, it is frequently necessary to hire a qualified electrician. It is important to remember that in places with high groundwater, the pump chamber or additional ATUs may remain essentially empty for long periods of time, and that these tanks may need to be safeguarded from floating by the installation of additional weight or other protective features.
  1. Secondly, all construction details, including the layout of all sewers outside of the home, the location and depth of all tanks, the routing and depth of pressurized effluent lines, and other system components, such as the drain field and any additional ATUs, must be consistent with the septic system plans approved by the local county health department. Cover the tank and pressurized lines once the inspector has given his final clearance and the system has been turned on. Advertisement

Create a new question

  • Questions can be added at any time.

More information on the replies Inquire about something There are 200 characters remaining. Include your email address so that you may be notified when this question has been resolved. SubmitAdvertisement

  • The use of aerobic bacterial additions (which are available at most DIY stores) to maintain a healthy and well functioning system, as suggested by producers on a periodic basis, is contentious. The septic tank is an anaerobic (wet) environment in which the majority of yeasts and other additions will have little or no effect on the sewage being processed. When it comes to installing septic tanks, some old school installers believe that placing an additive, a shovel of muck, or even a dead cat in an empty tank will “start” the process. What naturally enters the tank serves as the only thing that is necessary. The aerobic (wet or dry) component of the system consists of hundreds of square feet of drain field, where additives will do little help even if they make it all the way to the end of the system. The use of chemicals in septic systems has not been the subject of an independent research that has been published in a respectable scientific publication anywhere in the world, including this nation. This will mostly certainly be confirmed by your local health department. Each phase of the building process will almost certainly include an examination by a health inspector before the work can be completed or covered up. On pressurized lines, the use of a sand embedment is recommended in order to reduce the amount of damage caused by moving soil that has a high concentration of clay. When pumps are turned on and off, pressurized lines might move as well. Four inches (10.2 cm) of sand bedding on all four sides of the lines will prevent sharp pebbles from the ground or backfill from wearing holes in the pipe over time
  • And
See also:  What Small Shrubs Can I Plant Near A Septic Tank? (Solution found)

Thank you for submitting a suggestion for consideration! Advertisement

  • Keep the perforated pipe for the leech field in a vertical position while installing it to avoid having the holes in the pipe turn downward. It is necessary to lay the perforated drain field pipe ASTM 2729 dead level, so that the printed line on the pipe is facing up. The perforations on both sides of the pipe are on both sides of the pipe. All of the sections of perforated pipe are cemented together, and the ends of each leach line are capped to complete the installation. So, when waste water enters the pipe, it will fill the pipe to the height of the perforations and overflow from ALL of the holes, utilising the whole leach field as a means of treatment. In certain health authorities, you can utilize waste water to water grass or decorative plants, trees, vegetable gardens, and fruit trees if you place the perforated pipe on a slope. However, the water must first be cleaned by the system (tertiary treatment includes disinfection) in order to prevent pathogens (germs) from the septic system from being discharged into the environment throughout the process. Make sure to check with your local health authority to verify if the practice known as “reuse” is permitted in your community.

Keep the perforated pipe for the leech field in a vertical position while installing it to avoid having the holes in the pipe point downward. It is necessary to lay the perforated drain field pipe ASTM 2729 dead level, so that the printed line on the pipe is facing up. The perforations on both sides of the pipe are on the inside of the pipe. A glue joint is used to join all portions of the perforated pipe, and the ends of each leach line are sealed. When waste water enters the pipe in this manner, it will fill the pipe to the height of the perforations and overflow from ALL of the holes, using the whole leach field.

In order to prevent diseases (germs) from the septic system from being discharged into the environment, the water must first be treated by the system (tertiary treatment includes disinfection).

Things You’ll Need

  • The following tools are required: backhoe tractor, trencher, shovel, contractor’s laser level and rod, or a surveyor’s transit. Septic tanks
  • PVC pipe with perforations
  • Material for embedding
  • PVC adhesive, PVC fittings, and a septic tank outlet filter are all included. Hand saw
  • Course file
  • Sandpaper If necessary, effluent pumps and floats are installed. If an alternate system is used, a control panel is installed.

About This Article

The writers of this page have together authored a page that has been read 498,709 times.

Did this article help you?

Septic tanks are connected to dwellings by four-inch pipes. Image courtesy of dit26978/iStock/Getty Images. Most contemporary septic tanks, whether constructed of concrete or plastic, are divided into two compartments by an internal baffle and equipped with an intake and output port. In most cases, when you first install the tank, each port has a preinstalled 4-inch sanitary tee fitting. You connect the waste line from the building to the inlet fitting and the drain line to the outlet fitting either by gluing it or by using a mechanical flexible coupling to connect the two lines (often referred to as aFernco coupling).

Septic tanks used to have only one chamber in the olden days.

The scum layer contains greases, oils, and other lighter-than-water contaminants that could clog the soil.

Whatever your feelings about the necessity of the tees, they serve as an insurance policy against the failure of the septic tank baffles, and it is smart to have them installed.

In order to keep debris out of the pipes, some plumbers put grates on the top portions of tees. However, these grates are not required, and under no circumstances should grates be installed on the lower portions of tees, since this will cause the pipes to clog.

How to Install Septic Tees

The installation of the tees on the septic tank must be done from the inside of the tank if the tees do not come with the tank. A 4-inch tee is normally firmly secured by predrilled or, in the case of concrete tanks, preformed holes in the tank’s inlet and outflow holes. A bead of butyl or silicone caulk around the perimeter of the tee on both sides of the tank will enough in most cases, but it’s not a terrible idea to apply some in case you do need glue. The top of the tee should have a short piece of tubing attached to it to allow the aperture to extend over the scum layer in the tank, while the bottom of the tee must extend below the scum layer, or around 2 feet below the tee, to allow for proper drainage.

Connecting Inlet and Outlet Pipes

The installation of the tees on the septic tank must be done from the inside of the tank if the tees do not come pre-installed. The inlet and outlet holes are predrilled or, in the case of concrete tanks, preformed, and they are typically sized to accommodate a 4-inch tee snugly in the tank. You don’t always need glue, but it’s never a bad idea to have some on hand. A bead of butyl or silicone caulk around the circumference of the tee on both sides of the tank can do the trick. Ideally, a short piece of tubing should be linked to the top of the tee, allowing it to extend beyond the scum layer in the tank; however, the bottom of the tee should extend below the scum layer, or around 2 feet below the tee.

How to Install a Septic Tank and Field Line Sewer System

The installation of a septic tank is not a do-it-yourself activity. Image courtesy of Kwangmoozaa/iStock/Getty Images. You shouldn’t try to build a septic system yourself unless you are a heavy equipment operator or a professional. Even if you have heavy gear at your disposal and are familiar with how to use it, you will still require a significant amount of expert assistance. There are many professionals you’ll need: a soil expert to assess the site, an engineer to design an acceptable system, a plumbing contractor to construct and connect pipes, and maybe an electrician to assist with the installation of any pumps or timers that may be necessary.

Septic System Design Variations

A total of nine different types of septic systems are listed by the United States Environmental Protection Agency, and that doesn’t even include systems that are not gravity-fed and instead rely on a transfer pump. Septic tanks and a drain field sunk into the earth are the components of the traditional septic system. This is the system that most people envision, but it is only one of several options, and it is not necessarily the best one. It is possible that local health authorities will require an additional system, depending on the soil quality, topography, drainage conditions, anticipated usage, and other factors; in this case, it is necessary to hire an engineer who will work with the health authorities to design and obtain the necessary permits.

Some septic systems need the importation of filler materials such as sand, gravel, or other filler materials, as well as septic components other than the typical tank and perforated drain pipes, in order to function properly.

Installation Isn’t a Straight Shot

The designs are in hand, but it is not always a straight line from there to the actual installation for the homeowner who is working with an engineering firm. Mr. Rooter, in fact, gives the following advise to homeowners who are considering installing their own septic components: Don’t. Just too many things may go wrong with a system, leading to poor drainage, inadequate plumbing in the house, or pollution of the local water table, to mention. For those who are inclined to do it themselves, or for whom the circumstances demand that they do it themselves, and who have access to an excavator and crane, the installation of a standard system is quite straightforward to comprehend and execute.

Installing a Conventional Septic System

A traditional septic installation begins with the excavation of a hole for the tank in accordance with the placement specifications provided on your approved plan. As soon as the tank is set in place in the hole, you must link it up with the building sewer with 3- or 4-inch waste pipe, which must maintain a minimum slope toward the tank, and you must run a drain pipe from the other end of the tank to a distribution box in the drain field. After that, you must dig a series of parallel trenches that extend from this box throughout the drain field.

Connect the pipes to the distribution box and cover the pipes with a sheet of plywood.

For this reason, having the pump installed by a professional electrician who can guarantee the job is highly advised.

How to Install Drain Pipes for a Septic Tank Yourself

Home-Diy Installing a septic tank is often done by a professional who has access to the necessary equipment. A concrete septic tank can weigh several thousand pounds, and the ordinary homeowner does not have the necessary tools to safely install it in the ground. if (sources.length) then this.parentNode.removeChild(sources); else this.onerror = null; this.src = fallback; if (sources.length) then this.parentNode.removeChild(sources); else if (sources.length) then this.parentNode.removeChild(sources); else if (sources.length) then this.parentNode.remove ‘/public/images/logo-fallback.png’) is a fallback logo image.

A concrete septic tank can weigh several thousand pounds, and the ordinary homeowner does not have the necessary tools to safely install it in the ground. Although the field lines cannot be built by the homeowner, this can result in considerable cost savings for the homeowner.

  • The following items are required: Shovel (backhoe is recommended)
  • Tape measure
  • Gravel
  • Rake PVC perforated pipe
  • PVC pipe cleaner
  • PVC pipe cement PVC pipe cleaner
  • Geotextile material
  • Hacksaw

Warning

Large bushes or trees should not be planted directly over drain lines.

  1. Inspect your property and get a percolation test performed. In most cases, you will need a copy of the perc test results in order to acquire a permit to build a septic system in your home. In order to assess how quickly the soil absorbs water, a perc test will be performed on your site by a licensed specialist on your behalf. The results of this test will be used to calculate the quantity of drain line that will be required for your system. Drain lines should be measured and marked out before installation. You can divide this down into many lines, but each line must be the same length, and there must be a minimum of six feet between each line in order to be considered complete. Prior to digging, mark the beginning and ending locations of each line, double-checking all measurements to ensure they are accurate. Dig each drain line to a depth of 30 inches and a width of 24 inches. However, while a pick and shovel may be used to do the task, a backhoe can complete it in a fraction of the time and with less strain on your back. To make the trenches as flat as possible, remove any large boulders or roots that may have accumulated in them. Each of these lines will be served by a pipe that will go from the distribution box to it. This is the location where the pipe from the distribution box enters the ditch and marks the beginning point of your drain line. Fill each drain line with gravel until it reaches a depth of 12 inches. Spread gravel over the area to be covered with drain pipes and smooth it up with your rake. Install a 4 inch PVC perforated pipe on top of the gravel to provide drainage. This pipe will be connected to the pipe that comes from the distribution box and will run the whole length of the drain line to connect to the drain. Pipe cleaner should be used to clean each pipe junction before applying pipe cement. Before continuing, double-check that all of the fittings are in place. To finish covering the drain lines, continue to pour additional gravel into the system until the pipes are covered by roughly 1 to 2 inches of material. Using a rake, smooth out the gravel. A layer of geotextile material should be rolled out to cover the whole length and width of the drain line in order to prevent dirt from filtering into the drain lines and to aid in keeping roots out of the drainage system. The drain lines should be backfilled somewhat to allow for some small mounding to compensate for the settling that will occur. Grass seed should be planted on top of drain lines to aid in the absorption process and to avoid erosion.
See also:  How To Make A Soakaway For A Septic Tank? (Solved)

The Drip Cap

  • Installing a septic tank is often done by a professional who has access to the necessary equipment. A concrete septic tank can weigh several thousand pounds, and the ordinary homeowner does not have the necessary tools to safely install it in the ground. Dig each drain line to a depth of 30 inches and a width of 24 inches. Ensure that any large rocks or roots are removed from the trenches, and that the foundation is as level as possible
  • Fill each drain line with gravel until it reaches a depth of 12 inches. In addition, this pipe will link to the pipe that comes from the distribution box and will run the whole length of the drain line.

How to Run a Septic Tank Line From Your House

A septic system is made up of two lengths of pipe that are connected together. Initially, it runs from the house, where the system services are located, to a tank, where the waste is separated and solids settle out. The second section runs from the tank to the drainage field, where fluids from the tank are dispersed into the earth underneath the tank. The process of installing the first run of pipe is quite similar to that of installing a traditional sewage line. It is necessary to maintain a downhill slope to the storage tank.

Locating the Septic Tank

A septic system is constructed from two lengths of pipe. Initially, it runs from the home, where the system services are located, to a holding tank, where the waste is separated and solids settle out. The second section runs from the tank to the drainage field, where fluids from the tank are dispersed into the earth under the surface. It is quite similar to installing a traditional sewage line when you are putting in your first run of pipe. Maintaining a downhill slope towards the tank is essential.

Tank Depth

A standard septic tank has a 4-inch intake at the top, which is positioned towards the bottom. Ideally, a 1/4-inch-per-foot slope toward the pipe from the house should be maintained by the pipe connecting to it. To put it another way, for every 10 feet of distance between a tank and a home, the inlet must be 2 1/2 inches lower than where the pipe departs the house at its lowest point. The pipe usually exits at ground level, although it may need to pass beneath a foundation footing or concrete pad in rare cases.

Digging the Trench

The trench for the septic pipe should be dug before the hole for the tank since you will need a backhoe to complete the work and the tank will get in your way if it is already in the ground. To allow rainfall to drain properly, the pipe should be placed on a 2- or 3-inch bed of drain rock, so remember to account for this extra depth when digging. It is normal to use a four-inch pipe, and it should be installed far enough down to link with the main soil stack, which is a three-inch pipe that runs vertically past the main bathroom and through the roof of the home.

Precautions

Local building and health agencies will demand permits for a septic tank installation. You will also be required to submit a design plan before the permits will be provided, so prepare ahead of time. This layout should be developed in collaboration with a local builder who is familiar with the unique characteristics of the topography in your neighborhood. Stay away from planting trees or plants near the tank, drainage field, or any of the pipe systems.

They will be drawn to the pipes in their hunt for nutrition, and their roots will be able to successfully block them. You will be unable to use your septic system until the roots have been removed from the pipe. Removal may be both expensive and time-consuming.

How to Install a Septic Tank with Drain Line

It is discussed in this article how to set up a septic tank with a drain line. A three-compartment septic tank is covered in detail in this project, which includes all of the processes required to complete the installation. This septic tank has adequate capacity to accommodate 4-6 people, making it an excellent choice for most households. Even though the installation is straightforward, you will need to rent a mini-excavator or, ideally, a backhoe digger to complete the job properly. It is important to exercise caution when using detergents, disinfectants, or other acid cleansers since they will interfere with the operation of the bacteria that decompose the waste materials.

A simple explanation for how the system works is that the majority of the trash is transformed into sewage water.

Every two years, you will be required to remove the solids from the system.

The water will then be able to seep into the soil through the gravel layer.

Made from this plan

The construction of the sewage lines from the home to the site of the septic tank is the first step in the project’s development. Excavate the trenches such that the pipes have a 1/8 inch dip each foot of excavation. The pipes must be placed on a bed of sand and then completely covered with sand. The sand will protect the pipes, and it will also serve as an excellent marker for future operations, should it be necessary to dig further trenches. Decide on the position of the septic tank and mark the area with a marker.

  • Furthermore, the depth of the hole will be decided by the size and placement of the septic tank as well as the location of the sewage line.
  • We also employed a dumper truck to remove the soil from the site.
  • Make certain that the sewer pipe has a 1.5 percent slope when it is installed.
  • We relocated the septic tank with the help of a backhoe digger after securing it with a heavy-duty strap and moving it.
  • Check to verify that the septic tank intake is compatible with the sewer pipe.
  • We used a spirit level to ensure that the tank was upright during the installation.
  • Sand should be poured around the tank.

If you do not fill the tank with water, it will collapse due to the weight of the earth on top of the container.

We will not be constructing a drain field for this project, but rather an 80-foot-long trench.

You may either construct two 40-foot-long trenches or a wide surface area and install three 25-foot-long drain pipes on it.

We connected the header pipe to the septic tank, ensuring that it had a 2 percent slope to prevent backflow.

Because it will move quite swiftly, using a backhoe digger is highly recommendable.

Trenches should be filled with gravel to the point where the drain pipe (which is normally 4′′ in diameter and perforated) has a 1/8′′ per foot slope.

Using a 4′′ layer of gravel, cover the drain pipe and make sure the surface is level.

Geothextile cloth should be used to cover the trench.

Because the fabric prevents the pebbles from becoming mixed with the soil and clogging the drain pipe, it is effective.

At the end of the drain pipe, you must add a vent pipe to provide for proper ventilation.

This also allows for simple access to the drain pipe in the event that it has to be cleaned.

We moved the earth that we had dug back into the trenches with the use of the backhoe’s front loader bucket and a rake.

First and foremost, you must connect the riser to the septic tank.

In order to have easy access to the tank for maintenance and inspection, the top of the riser should be slightly above the level of the surrounding ground.

These sheets are thin and rather stiff, despite their small weight.

As a result, you must first cover the tank with these sheets, followed by a 4′′ layer of dirt on top of that.

The polystyrene sheets must be covered with dirt once they have been laid out on the ground.

Work carefully so that you do not harm the tank.

On the blog, you can also get a comprehensive guide on how to construct a concrete pump house.

Make sure to read the previous articles in the Brick House Construction Series to see what more is in store for you!

We appreciate you taking the time to read our article on how to construct a septic tank with drain line, and we encourage you to go through the rest of our projects. Please spread the word about our articles to your friends by using the social media sharing buttons.

Related Posts

To process and dispose of waste, a septic system has an underground septic tank constructed of plastic, concrete, fiberglass, or other material that is located beneath the earth. Designed to provide a customized wastewater treatment solution for business and residential locations, this system may be installed anywhere. Although it is possible to construct a septic tank on your own, we recommend that you hire a professional to do it owing to the amount of skill and specific equipment required.

Who Needs a Septic Tank?

For the treatment and disposal of wastewater, septic systems include an underground septic tank that is built of plastic, concrete, fiberglass, or another material. Designed to provide a customized wastewater treatment solution for business and residential sectors, this system is available now. Although it is possible to build a septic tank on your own, we recommend that you hire a professional to do it owing to the amount of skill and specific equipment that is required. In this post, we’ll go over the several types of septic systems that are accessible to homeowners, as well as the procedure and costs associated with installing one.

How to Prepare for Your Septic Tank Installation

Here are a few pointers to keep in mind to make sure your septic tank installation goes as smoothly as possible.

Receive Multiple Estimates

Receiving quotations from licensed septic tank installers and reading reviews about each firm using trustworthy, third-party customer evaluations should be done before any excavation or signing of any paperwork is done. Examine your options for a contractor and make sure they have the appropriate insurance and license, as well as the ability to include critical preparations such as excavation and drain field testing in their quotation.

Test the Soil and Obtain a Permit

For septic systems to function properly, permeable soil surrounding the tank must absorb and naturally handle liquid waste, ensuring that it does not pollute runoff water or seep into the groundwater. The drain or leach field is the name given to this region. Before installing a septic tank, you are required by law to conduct a percolation test, also known as a “perc” test. This test indicates that the soil fits the specifications established by the city and the local health agency. In most cases, suitable levels of permeable materials, such as sand or gravel, are necessary in a soil’s composition.

Note: If you wish to install a septic tank on your property, you must first ensure that the ground passes the percolation test.

Plan for Excavation

Excavation of the vast quantity of land required for a septic tank necessitates the use of heavy machinery. If you are presently residing on the property, be careful to account for landscaping fees to repair any damage that may have occurred during the excavation process. Plan the excavation for your new home at a period when it will have the least influence on the construction process if you are constructing a new home.

Typically, this occurs before to the paving of roads and walkways, but after the basic structure of the home has been constructed and erected. Adobe Licensed (Adobe Licensed)

The Cost of Installing a Septic Tank

There are a few installation charges and additional expenditures connected with constructing a new septic system, ranging from a percolation test to emptying the septic tank and everything in between.

Percolation Test

A percolation test can range in price from $250 to $1,000, depending on the area of the property and the soil characteristics that are being tested. Ordinarily, specialists will only excavate a small number of holes in the intended leach field region; however, if a land study is required to identify where to excavate, the cost of your test may rise.

Building Permit Application

A permit will be required if you want to install a septic tank on your property. State-by-state variations in permit prices exist, however they are normally priced around $200 and must be renewed every few years on average.

Excavation and Installation

When you have passed a percolation test and obtained a building permit, your septic tank is ready to be professionally placed. The cost of a new septic system is determined by the size of your home, the kind of system you choose, and the material used in your septic tank. The following is a list of the many treatment methods and storage tanks that are now available, as well as the normal pricing associated with each.

Types of Septic Tank Systems

Septic system that is used in the traditional sense Traditionally, a septic system relies on gravity to transport waste from the home into the septic tank. Solid trash settles at the bottom of the sewage treatment plant, while liquid sewage rises to the top. Whenever the amount of liquid sewage increases over the outflow pipe, the liquid waste is discharged into the drain field, where it continues to disintegrate. This type of traditional septic system is generally the most economical, with an average cost of roughly $3,000 on the market today.

See also:  How Often Should You Need To Clean Out A Septic Tank? (Question)

Drain fields for alternative systems require less land than conventional systems and discharge cleaner effluent.

Septic system that has been engineered A poorly developed soil or a property placed on an uphill slope need the installation of an engineered septic system, which is the most difficult to install.

It is necessary to pump the liquid waste onto a leach field, rather than depending on gravity to drain it, in order to ensure that it is equally dispersed across the land.

Types of Septic Tanks

  • Concrete septic tanks are long-lasting and rust-proof, but they are difficult to repair if they are damaged. It is possible that concrete tanks will cost up to $2,000 depending on their size. Plastic —While plastic tanks are cost-effective, they are also susceptible to damage. They are around $1,200 in price. Fiberglass —While fiberglass septic tanks are more durable than their plastic counterparts, they are susceptible to shifting or displacement if the water table rises to an excessive level. Depending on the model, these tanks may cost up to $2,000

More information may be found at: Septic Warranty Coverage and Costs.

Using Your Septic Tank

It is important to maintain the area around your new septic tank’s drain field and to frequently check your tank using the lids included with it. Never use a trash disposal in conjunction with your septic tank since it might cause the system to clog. Additionally, avoid driving over the land where your septic tank is located or putting heavy gear on top of your septic tank or drain field to prevent damage. Most of the time, after five years of septic system use, you’ll need to arrange a cleaning and pumping of the system.

Consequently, there will be no accumulation of solid waste that will leach into the surrounding soil or groundwater. Send an email to our Reviews Team [email protected] if you have any comments or questions regarding this post.

Prepping for New Septic Tank Installation

Assuming it’s time to replace your old septic system, make sure you’re prepared for the installation procedure. Taking thorough notes during the installation process is part of this preparation. You might believe that care for your septic system begins once it has been installed and is operational. Correct septic system maintenance, on the other hand, begins even before the installation of your septic system. Listed below are four crucial considerations to keep in mind throughout the installation.

Tank Site

The placement of the tank site is one of the most essential considerations throughout the installation process. If you’re having problems with your septic tanks, here is the first place you’ll look for help. When septic tank drains get clogged or overflow, untreated sewage can leak through the earth and onto the environment. You’ll be able to see and smell the problem if you’re standing immediately above the septic tank installation site.

Seepage Field

The position of the seepage field will be the next critical piece of information you’ll need to know to complete your project. This is the location where surplus water is directed before being absorbed into the ground. Make certain that the seepage field is not overwhelmed with unnecessary weight once you’ve determined its position. Seepage fields can be harmed by things such as an above-ground swimming pool, automobiles, and other types of vehicles. The weight of the field plus the vibration of the earth might cause the walls of the field to collapse.

Riser Pipe Installation

Your septic tank should be emptied once every three to five years, depending on how much it is used and the size of your property, according to the manufacturer. Make certain that the riser pipe is included in the septic system installation. This is the conduit that connects the tank to the surface of the earth. It is possible to empty the septic tank without harming the soil in this manner.

Clean-out Drains

Finally, once your septic system has been constructed, you’ll need to find the clean-out drains that will be necessary. This is a collection of tiny drains that are positioned around the perimeter of your property, near your bathrooms and kitchen. It is necessary to keep the drains covered at all times since they lead straight to the septic tank. If you don’t do something, your septic tank may become inundated during the next major downpour. Put your septic system first and don’t take any chances.

to ensure that a new septic system is installed properly.

A Step-by-Step Guide to Installing Your New Septic System

Although septic tank installation in San Francisco is not always a task that can be completed by one person without the assistance of a team of specialists, you may be curious about how the procedure is carried out. First and first, if you still have an old system, you’ll need to get rid of it. Following the excavation, you may proceed to the installation of the plumbing and drainage systems, before filling up the space and testing the system to ensure that it is in proper working order, as needed.

  • Excavation and removal of waste In the event that you’ve never had a septic tank before, you won’t have to bother about digging up the old tank in order to install the new tank.
  • Sometimes, additional excavation may be required in order for your brand-new septic tank and the pipes that will be connected to it to be properly installed and function properly.
  • Plumbing and drainage systems are being installed.
  • Plumbing and drainage pipes are required for the septic tank in order for it to accept waste from the residence while also filtering it out into the drainage field.
  • The System is being filled and examined.

This last inspection is critical because it provides the specialists with an opportunity to identify any little issues that may have gone unnoticed previously, allowing your system to get off to a good start.

Septic Tank Installation: 3 Steps for Preparing Your Home for Independent Sewage

Homes all around the country are experimenting with different methods of conserving resources and optimizing energy usage. Solar panels are becoming increasingly popular, and energy-efficient designs are becoming increasingly popular as a result. You may increase your other amenities, such as ventilation and sewage, in addition to energy management. An aseptic tank system provides you with a variety of advantages. It completely eliminates your public water costs, and it just requires minor maintenance every 3-5 years to keep it running.

How to Prepare for Septic Tank Installation

Septic tank installation should be a simple process if you employ qualified specialists to complete the work. Nonetheless, if you want to prevent any difficulties along the way, you must plan ahead of time on your end. If you’ve decided it’s time to construct a septic tank, here’s a step-by-step instruction on how to prepare your property for your new septic tank:

Step 1: Block off your calendar

The installation of a septic tank should go well as long as you employ qualified personnel to complete the work. If you want to prevent any issues along the road, you must still prepare on your own side of the equation. If you’ve decided it’s time to construct a septic tank, here’s a step-by-step instruction on how to properly prepare your property for your new septic tank: 1.

Step 2: Plan a short vacation

Before the septic tank can be connected into your system, you must turn off all of your water and plumbing fixtures. You will be unable to wash laundry, take a bath, or prepare food while you are experiencing this. It’s preferable if you can go away from home while the installation is taking place. Unless you’re fine with the idea of not having access to running water for a few days, it’s better to locate a somewhere to stay while your plumbing is being repaired. Before you leave your house for a brief trip, it is critical that you keep contact with your septic tank installer to avoid any problems.

You should request a phone number you can call to obtain updates on the installation’s progress and if you will need to prolong your stay away from home if the installation is delayed.

Step 3: Research topics about septic tank maintenance

Septic systems are large, expensive expenditures that are intended to enable you to be self-sufficient in terms of your home’s water demands. Despite the fact that it provides a significant return on investment, it is also a duty that you must learn to care for and maintain. Learning the fundamentals of what can and cannot be flushed, the intervals between pumps, and the cures for blockages and leaks are all important pieces of information to gather.

After the installation is complete, you should get a precise layout of the various elements of the fixtures on your premises. After that, you should inquire as to how you should maintain it on your own and when you should seek expert assistance.

Conclusion

Septic tanks have a lifespan of 2-4 decades and may save you hundreds of dollars in water costs because to the on-site water filtering devices that they contain. Septic tank installation will provide you with a utility that will last you well into your retirement years and will benefit your entire family. Making your house more energy efficient isn’t just a passing craze that will fade away in time, though. As a result, brands and consumers are placing greater emphasis on these characteristics since they represent a new way of thinking that minimizes and remediates any environmental damage.

At A-1 Tank Service, we provide our customers with specialized services that help them maintain the durability and long-term viability of their septic systems.

Greenville Septic Tank Repair

Unsanitary and unhealthy living conditions are made impossible without a properly installed and well-maintained septic tank. When your septic tank needs to be repaired or replaced, call the trained and experienced plumbers at Duckett Plumbing for a free consultation. Providing septic tank repair and installation in Greenville and Anderson for more than 50 years, our professional plumbers are standing by to answer your call at (864) 664-2221 for septic tank repair or installation in Greenville or Anderson.

Common Septic Tank Problems

Despite the fact that the septic tank is buried in the earth, there are several symptoms that indicate that there may be an issue with it. A septic system malfunction might be the cause of wastewater backing up into your home, a sewage stench in the yard or from the drains, sluggish drains within the house, gurgling sounds from the drains, or water collecting in the yard. If you observe any of these symptoms, call your local septic service provider. We can assist you with frequent difficulties that are caused by:

  • Wastewater backing up into the home because to clogs or leaks
  • The residence is creating more wastewater than the system is capable of dealing with. Infiltration of tree roots
  • The use of heavy machinery over the septic system can cause significant damage. System design or implementation that is substandard
  • The absence of upkeep

Wastewater flowing up into the home because to clogs or leaks The residence is creating more wastewater than the system is capable of dealing with; Infiltration of tree roots The use of heavy machinery over the septic system can cause significant damage; Design or implementation of the system that is substandard. The absence of upkeep.

Septic Tank Installation and Repair

Wastewater backing up in the residence because to clogs or leaks; The residence is creating more wastewater than the system is capable of processing; Infiltration through tree roots; The use of heavy machinery over the septic system causes damage. System design or installation that is inadequate; a lack of upkeep;

Should You Repair or Replace Your Septic Tank System

Often, a simple repair is all that is required to keep your septic system up and operating smoothly.

That being said, if you have an older system or one that is continuously in need of maintenance, you might think about having a new septic tank installed. Septic tanks have a lifespan of around 40 years, so if you are building a new house, you may want to consider replacing your system.

Maintaining Your Septic Tank

The majority of the time, a simple repair will suffice to keep your septic system operating effectively. In light of the foregoing, if you have an older system or one that is continuously in need of maintenance, you might think about installing a new septic tank. It is possible that your septic tank system may need to be replaced if you move into a new house after 40 years.

  • Often, a simple repair is all that is required to keep your septic system up and running. That being said, if you have an older system or one that is continuously in need of maintenance, you might think about having a new septic tank installation done. Septic tanks have a lifespan of around 40 years, so if you are building a new home, you may want to consider replacing it.

The best course of action if a problem emerges with your septic tank is to leave the repair to a professional who has the necessary expertise and understanding. Septic plumbing problems can be resolved the same day if they occur. In addition, we provide emergency assistance for plumbing and septic problems that arise unexpectedly. If you suspect a problem with your septic tank, contact (864) 664-2221 to schedule an examination.

Leave a Comment

Your email address will not be published. Required fields are marked *